RESOLUTION NO. 2006-076
BE IT RESOLVED by the City Council of the City of North Richland Hills,
Texas, that:
1.
The City Manager be, and is hereby authorized to execute the attached City
Developer Agreement for Reimbursement of Infrastructure Improvements beyond the
Developer's Proportionate Share for the Fountain Ridge Subdivision with Fountain
Ridge, Ltd. as an act and deed of the City.
PASSED AND APPROVED this the 11 th day of September,
LS
A~AND LEGALITY:
George A. Staples, City Attorney
APPROVED AS TO CONTENT:
7.l~~~o Q,.:k
Mike urtis, .E., Public Works Director
CITY OF NORTH RlCHLAND HILLS
CITY-DEVELOPER AGREEMENT
STATE OF TEXAS
KNOW ALL MEN BY THESE PRESENTS
COUNTY OF TARRANT
THAT FOUNTAIN RIDGE, LTD., of the County of Tarrant, State of Texas (hereinafter
"Developer"), and the City of North Rjchland Hills, Tarrant County, Texas (hereinafter "City"), enter
into the following contract:
In consideration of the mutual covenants herein contained and for the purpose of providing
water and sewer system improvements as indicated in the construction documents titled "The
Fountain Ridge Addition" the Developer and the City hereto agree:
1. The City agrees to reimburse Developer for increasing a water line and sanitary sewer line
size in excess of the Developments proportionate share.
Water Line
The subdivision regulations require an 8-inch water along Davis Boulevard. The City's Master Plan
indicated that ultimately a 1 O-inch water line would be required. The Developer paid to design and
construct 1,253 L.F. of a 10-inch water line. The difference in cost between the 10-inch water line
and an 8-inch water line is $7,921.38. A cost estimate is attached as Exhibit A.
Total cost of 10-inch water line
Estimated cost of 8-inch water line
$23,669.21
$15,747.83
Amount owed by City
(Difference)
$ 7,921.38
Sanitary Sewer Line
The Developer was told that an existing sanitary sewer line was a private line and Developer would
need to design and construct a public 8-inch sanitary sewer line. After the line was constructed it
was determined that 68% of the line was used by a subdivision developed in the 1970s. Since 68%
of the line was being used by the public, the Developer is requesting that 68% of the cost be
reimbursed by the City. A cost estimate is attached as Exhibit A.
Total cost of 8-inch sanitary sewer
$33,875.00
City share is 68% of $33,870.00 or
$23,035.00
City-Developer Agreement ~ The Fountain Ridge Addition - Page I
Total City Contribution
Water line upsize
Sanitary Sewer line
$ 7,921.38
$23,035.00
Total City cost
$30,956.38
This Agreement was approved in its entirety at the meeting of the City Council of the City of
North Richland Hills on the 11 thday of September ,2006, by a majority vote of
the Council.
FOUNTAIN RIDGE, LTD.
B~4~
John F. Oi n, President
JFO Land, Inc., general partner
CITY OF NORTH RICH LAND HILLS
~/~~~~~
# Â...~"'" ....\1-- )
[Q;! n \~
Ii Of ií
¡¡; z! r ¡:(.f)
iÆ ~ . '"
~ \,1.-'. h 1'-'
~", 0\ /^-' iii
~ ". .+..,~
'7.~" .... ...~~
'i . ·......··~S"'<.\ ~~
7//111 "* .1PìII
¡IJI~jIII\\\\\\...\\\Ø'(
By:
/~L-:
(~¿,1tf_4"-1/lf'>·~(¿J
gham, City Ma~,er
S TO FORM AND LEGALITY:
N R H Council Action fhl N
Date Approved C\ - \ \ ~ a LD
Agenda No.~~ 2Cù\o-~ \
QrtII Res No. 2(£11)-\ lù
-
C!~iti/~
- Patncia Hutson, City Secretary
APPROVED AS TO CONTENT:
/~.
'ill' / ; h
J. 'l L( l. <~'- >-;
Department Head
Ci/y-Oeveluper Agreemell/ - The Fow¡/ail! Ridge Addi/ion ~ Page 2
EXHIBIT A
COST ANALYSIS FOR CITY PARTICIPATION
FOUNTAIN RIDGE DEVELOPMENT
CITY OF NORTH RICHLAND HILLS, TEXAS
DESCRIPTION
PRICEIUNIT
AMOUNT
TOTAL
lO-inch Water Main Along Davis Blvd. (P.8828)
10" PVC Water Pipe
8" PVC Water Pipe
$15.57/L.F.
$10.11/L.F.
1,253 L.F.
1,253 L.F.
$19,509.21
$12,667.83
Subtotal City Cost
$ 6,841.38
10" Gate Valve
8" Gate Valve
$1,040.00/Each
$ 770.00/Each
4 Each
4 Each
$ 4,160.00
$ 3,080.00
Subtotal City Cost
$ 1,080.00
TOTAL CITY COST FOR] 0" WL
$ 7.921.38
8-inch Offsite Sanitary Sewer Main from Newman Drive to Walker Branch Outfall
8" PVC Sewer Pipe $20.50/L.F. 850 L.F.
Sewer Manholes $1,800.00/Each 4 Each
Trench Safety $1.00/L.F. 850 L.F.
Bore and Case 8" SS $105.00/L.F. 80 L.F.
TOTAL
$17,425.00
$ 7,200.00
$ 850.00
$ 8,400.00
$33,875.00
TOTAL CITY COST FOR 8" SS @ 68% OF TOTAL $23.035.00
GRAND TOTAL CITY COST FOR WATER AND
SEWER ON FOUNTAIN RIDGE DEVELOPMENT $30.956.38
Cily-Developer Agreement - The Fountain Ridge Addition - Page 3