Loading...
HomeMy WebLinkAboutResolution 2006-076 RESOLUTION NO. 2006-076 BE IT RESOLVED by the City Council of the City of North Richland Hills, Texas, that: 1. The City Manager be, and is hereby authorized to execute the attached City Developer Agreement for Reimbursement of Infrastructure Improvements beyond the Developer's Proportionate Share for the Fountain Ridge Subdivision with Fountain Ridge, Ltd. as an act and deed of the City. PASSED AND APPROVED this the 11 th day of September, LS A~AND LEGALITY: George A. Staples, City Attorney APPROVED AS TO CONTENT: 7.l~~~o Q,.:k Mike urtis, .E., Public Works Director CITY OF NORTH RlCHLAND HILLS CITY-DEVELOPER AGREEMENT STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS COUNTY OF TARRANT THAT FOUNTAIN RIDGE, LTD., of the County of Tarrant, State of Texas (hereinafter "Developer"), and the City of North Rjchland Hills, Tarrant County, Texas (hereinafter "City"), enter into the following contract: In consideration of the mutual covenants herein contained and for the purpose of providing water and sewer system improvements as indicated in the construction documents titled "The Fountain Ridge Addition" the Developer and the City hereto agree: 1. The City agrees to reimburse Developer for increasing a water line and sanitary sewer line size in excess of the Developments proportionate share. Water Line The subdivision regulations require an 8-inch water along Davis Boulevard. The City's Master Plan indicated that ultimately a 1 O-inch water line would be required. The Developer paid to design and construct 1,253 L.F. of a 10-inch water line. The difference in cost between the 10-inch water line and an 8-inch water line is $7,921.38. A cost estimate is attached as Exhibit A. Total cost of 10-inch water line Estimated cost of 8-inch water line $23,669.21 $15,747.83 Amount owed by City (Difference) $ 7,921.38 Sanitary Sewer Line The Developer was told that an existing sanitary sewer line was a private line and Developer would need to design and construct a public 8-inch sanitary sewer line. After the line was constructed it was determined that 68% of the line was used by a subdivision developed in the 1970s. Since 68% of the line was being used by the public, the Developer is requesting that 68% of the cost be reimbursed by the City. A cost estimate is attached as Exhibit A. Total cost of 8-inch sanitary sewer $33,875.00 City share is 68% of $33,870.00 or $23,035.00 City-Developer Agreement ~ The Fountain Ridge Addition - Page I Total City Contribution Water line upsize Sanitary Sewer line $ 7,921.38 $23,035.00 Total City cost $30,956.38 This Agreement was approved in its entirety at the meeting of the City Council of the City of North Richland Hills on the 11 thday of September ,2006, by a majority vote of the Council. FOUNTAIN RIDGE, LTD. B~4~ John F. Oi n, President JFO Land, Inc., general partner CITY OF NORTH RICH LAND HILLS ~/~~~~~ # Â...~"'" ....\1-- ) [Q;! n \~ Ii Of ií ¡¡; z! r ¡:(.f) iÆ ~ . '" ~ \,1.-'. h 1'-' ~", 0\ /^-' iii ~ ". .+..,~ '7.~" .... ...~~ 'i . ·......··~S"'<.\ ~~ 7//111 "* .1PìII ¡IJI~j III\\\\\\...\\\Ø'( By: /~L-: (~¿,1tf_4"-1/lf'>·~(¿J gham, City Ma~,er S TO FORM AND LEGALITY: N R H Council Action fhl N Date Approved C\ - \ \ ~ a LD Agenda No.~~ 2Cù\o-~ \ QrtII Res No. 2(£11)-\ lù - C!~iti/~ - Patncia Hutson, City Secretary APPROVED AS TO CONTENT: /~. 'ill' / ; h J. 'l L( l. <~'- >-; Department Head Ci/y-Oeveluper Agreemell/ - The Fow¡/ail! Ridge Addi/ion ~ Page 2 EXHIBIT A COST ANALYSIS FOR CITY PARTICIPATION FOUNTAIN RIDGE DEVELOPMENT CITY OF NORTH RICHLAND HILLS, TEXAS DESCRIPTION PRICEIUNIT AMOUNT TOTAL lO-inch Water Main Along Davis Blvd. (P.8828) 10" PVC Water Pipe 8" PVC Water Pipe $15.57/L.F. $10.11/L.F. 1,253 L.F. 1,253 L.F. $19,509.21 $12,667.83 Subtotal City Cost $ 6,841.38 10" Gate Valve 8" Gate Valve $1,040.00/Each $ 770.00/Each 4 Each 4 Each $ 4,160.00 $ 3,080.00 Subtotal City Cost $ 1,080.00 TOTAL CITY COST FOR] 0" WL $ 7.921.38 8-inch Offsite Sanitary Sewer Main from Newman Drive to Walker Branch Outfall 8" PVC Sewer Pipe $20.50/L.F. 850 L.F. Sewer Manholes $1,800.00/Each 4 Each Trench Safety $1.00/L.F. 850 L.F. Bore and Case 8" SS $105.00/L.F. 80 L.F. TOTAL $17,425.00 $ 7,200.00 $ 850.00 $ 8,400.00 $33,875.00 TOTAL CITY COST FOR 8" SS @ 68% OF TOTAL $23.035.00 GRAND TOTAL CITY COST FOR WATER AND SEWER ON FOUNTAIN RIDGE DEVELOPMENT $30.956.38 Cily-Developer Agreement - The Fountain Ridge Addition - Page 3