HomeMy WebLinkAboutResolution 2007-008RESOLUTION NO. 2007-008 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF NORTH RICHLAND HILLS, TEXAS, THAT: 1. The City Manager be, and is hereby authorized to execute the attached Agreement for Engineering Services with LopezGarcia Group, Inc. for the design and construction of the Wastewater System Rehabilitation, Contract "C" project as an act and deed of the City. PASSED AND APPROVED this the 22nd day of January, 2007. CITY F RT LA LS .e~~}Al!?t411V11E6t%BiddPfffP ~y~ - - ~G t~ L~ ~ ~°;r~rf~i.. Oscar Trevino, Mayor Secretary AND LEGALITY: George A. Staples, amity Attorney APPROVED AS TO CONTENT: Mike~urtis,~.E., Public Works Director Contract # P05MUN.NRH 01 P01 CITY OF NORTH RICHLAND HILLS, TEXAS PUBLIC WORKS CONTRACT AGREEMENT FOR ENGINEERING SERVICES This AGREEMENT is made and entered into this day of , 2007, by and between THE CITY OF NORTH RICHLAND HILLS, hereinafter called the OWNER, and LOPEZGARCIA GROUP, INC., a corporation hereinafter called the ENGINEER. RECITALS This AGREEMENT is applicable to the furnishing of Basic and Special Engineering Services by the ENGINEER to the OWNER for the design and construction of WASTEWATER SYSTEM REHABILITATION, CONTRACT "C", hereinafter called the PROJECT. CONTRACTUAL UNDERTAKINGS SECTION I EMPLOYMENT OF ENGINEER The OWNER agrees to employ the ENGINEER and the ENGINEER agrees to furnish the Basic and Special Engineering Services in connection with the PROJECT as stated in Section II following, and for having rendered such services the OWNER agrees to pay to the ENGINEER compensation as stated in Section VI following. SECTION II CHARACTER AND EXTENT OF SERVICES 1 . The BASIC ENGINEERING SERVICES to be rendered by ENGINEER, include and are limited to the following: A. Evaluate record drawings (as available) and site conditions for each of the 53 repair items identified in Attachment "A" -Scope of Work to further refine the repair/replacement method(s) recommended and advise the OWNER, of any geotechnical, soil, foundation, or other subsurface investigations or any special surveys or special testing which, in the opinion of the ENGINEER, may be required for the proper execution of the project, and assist the OWNER in arranging for the conduct of such investigations and tests. (The performance of these investigations and tests is not a part of the ENGINEER'S Basic Services and will not be included unless specifically authorized in writing by the OWNER.) B. Prepare a Preliminary (60%) complete set of plans and specifications for review and comment by the OWNER, and the Texas Department of Transportation (TxDOT) as necessary for permitting purposes. C. Prepare a detailed Engineer's Opinion of Probable Construction Cost commensurate with the 60% plans and specifications. The ENGINEER shall not be required to guarantee the accuracy of the construction cost opinions. D. Based on the comments received from the 60% review, prepare a Final (90%) complete set of plans for review and comment by the OWNER, and for permitting purposes by the Texas Department of Transportation as necessary. E. Prepare a detailed Engineer's Opinion of Probable Construction Cost commensurate with the 90% plans and specifications. The ENGINEER shall not be required to guarantee the accuracy of the construction cost opinions. F. Based on the comments received from the 90% review, develop a 100% complete set of Contract Documents (final construction plans, specifications, and opinion of probable construction costs) for review and approval by the ONWER. G. Furnish to the OWNER up to 30 sets of Construction Contract Documents as necessary for distribution to potential bidders. All sets of Construction Contract Documents in excess of 30 are to be paid for separately. H. Assist the OWNER with the bidding process, including participating in a pre-bid conference, answering questions from prospective bidders, preparing addenda to the Construction Contract Documents, attending the bid opening, tabulating and evaluating the bids and recommending award of the construction contract. The OWNER shall be responsible for advertising the PROJECT and distributing the Construction Contract Documents to potential bidders. I. Assemble the final Construction Contract Documents for execution by the construction contractor, the OWNER, and TxDOT, if applicable. J. Assist the OWNER in conducting apre-construction conference with the construction contractor, his sub- contractors, TxDOT, and the various franchise utility companies known to have facilities within the area(s). K. Represent the OWNER in the Non-Resident administration of the project. In this capacity, the ENGINEER shall have the authority to exercise whatever rights the OWNER may have to disapprove work and materials that fail to conform to the Construction Contract Documents when such failures are brought to the ENGINEER'S attention. (This function of ENGINEER shall not be construed as supervision of the project and does not include on-site activities other than occasional site visits to observe overall project conditions or when specifically requested by OWNER to visit on-site for a particular matter. It particularly does not involve exhaustive or continuous on-site inspections to check the quality or quantity of the work or material; nor does it place any responsibility on ENGINEER for the techniques and sequences of construction or the safety precautions incident thereto, and ENGINEER will not be responsible or liable in any degree for the Contractor's failure to perform the construction work in accordance with the Construction Contract Documents) L. Consult and advise the OWNER; issue such instructions to the Contractor as in the judgment of the ENGINEER are necessary; and prepare routine change orders as required. M. Respond to Requests for Information from the Contractor, review samples, catalog data, schedules, shop drawings, laboratory, shop and mill tests of material and equipment and other data which the Contractor is required to submit, only for conformance with the design concept of the project and compliance with the information given by the Construction Contract Documents; and assemble written guarantees which are required by the Construction Contract Documents. N. Prepare or review monthly and final estimates for payments to Contractors, and furnish to the OWNER appropriate recommendations as to payments to Contractors and Suppliers. O. Conduct, in company with OWNER, a final inspection of the project for conformance with the design concept of the project and compliance with the Construction Contract Documents, and approve in writing final payment to the Contractors. P. Revise contract drawings, with the assistance of the OWNER's Resident Project Representative to reflect available information as to how the work was constructed. Furnish a set of prints of these revised drawings to the OWNER. 2 2. The SURVEYING SERVICES to be rendered by ENGINEER include and are limited to the following: A. Perform field surveys to collect information on existing sanitary sewer manholes being repaired or replaced as part of the line segment, which in the opinion of the ENGINEER, is required in the final design of the PROJECT. B. Furnish Control Points and Elevation Bench Marks required to establish the alignment and elevations as required for the Contractor to Layout the construction of the PROJECT to the proper lines and grades for the construction of the designed improvements. Furnishing Control Points and Elevation Bench Marks shall be performed on a one-time basis prior to construction activities. The Construction Contractor shat{ be responsible for protecting said items during construction. Survey Services to re-establish Control Points and/or Elevation Bench Marks damaged by construction or other activities beyond the ENGINEER's control shall be considered as Additional Services and will be invoiced on a "time and materials" basis in accordance with the ENGINEER'S rate schedules effective at the time said Services are rendered. 3. The following Special Engineering Services and all others not specifically included above are excluded from the AGREEMENT for Engineering Services. Some or all of the following Special Services may be required during the progress of the PROJECT and can be provided on a "time and materials" basis in accordance with the ENGINEER's rate schedules effective at the time said Services are negotiated. A. Perform field surveys, conduct records research and furnish property descriptions for the purpose of easement and/or right-of-way acquisition by the OWNER. B. Surveying and/or engineering services associated with the layout or construction staking of the PROJECT. C. Inspection of the PROJECT construction. D. Resident Project Representation. SECTION III AUTHORIZATION OF SERVICES The OWNER's execution of this AGREEMENT shall be considered as authorization for the ENGINEER to undertake this assignment immediately. SECTION IV PERIOD OF SERVICE This AGREEMENT shall be effective upon execution by the OWNER and the ENGINEER, and shall remain in force until completion of construction or until terminated under the provisions hereinafter provided in Section X. SECTION V COORDINATION WITH THE OWNER The ENGINEER shall hold periodic conferences with the OWNER, or its representatives, to the end that the project, as perfected, shall have full benefit of the OWNER'S EXPERIENCE AND KNOWLEDGE OF EXISTING NEEDS AND FACILITIES, AND BE CONSISTENT WITH ITS CURRENT POLICIES AND CONSTRUCTION STANDARDS. To implement this coordination, the OWNER shall make available to the ENGINEER for use in planning the project, all existing plans, maps, field notes, statistics, computations and other data in his possession relative to existing facilities and to the project. SECTION VI THE ENGINEERS' COMPENSATION For and in consideration of the Basic and Special Engineering Services to be rendered by the ENGINEER, as cited in Section 11 above, the OWNER shall pay and the ENGINEER shall receive compensation as set forth hereinafter: 1. BASIC ENGINEERING SERVICES Compensation for the Basic Engineering Services (Preliminary Design, Final Design and Construction Phases) for the PROJECT shall be a lump sum fee of 590,105.00. 2. SURVEYING SERVICES Compensation for the Surveying Services for the PROJECT shall be a lump sum fee of 54,010.00. 3. REPRODUCTION Compensation for the Reproduction Services for the PROJECT shall be a lump sum fee of $4,000.00. 4. TOTAL COMPENSATION Total compensation to the ENGINEER shalt include the sum of item 1. "Basic Engineering Services" (590,105), Item 2. "Surveying Services" (54,010), and Item 3. "Reproduction" (54,000), for a total lump sum amount of 598,115.00 without additional negotiation and authorization. See ATTACHMENT "B" -Work Tasks and Fees. The compensation for engineering services stated does not include sales tax. If the State of Texas imposes a sales tax on engineering services during the time of this contract, then the Owner agrees to pay the sales tax as an extra payment, above and beyond the agreed compensation for engineering services or provide ENGINEER with appropriate documentation andlor certification of OWNER's tax-exempt status. SECTION VII REVISION OF REPORTS, PLANS, SPECIFICATIONS AND OTHER DOCUMENTS The revision and re-work of reports, plans, specifications and/or other documents during the formative stages as an orderly process in the development of the PROJECT to meet the needs of the OWNER shall be considered as part of the Basic Services; however after a definite plan has been approved by the OWNER, if a decision is subsequently made by the OWNER, which, for its proper execution involves extra services and expenses for changes in, or additions to the drawings, and/or other documents, or if the ENGINEER is put to labor or expense by delays imposed on him from causes not within his control, the ENGINEER shall be compensated for such extra expense which shall be considered as Additional Services to be paid at an hourly reimbursable basis, or a negotiated Lump Sum Fee. SECTION VIII OWNERSHIP OF DOCUMENTS Original documents, plans, design and survey notes represent the product of training, experience, and professional skill, and accordingly belong to, and remain the property of the ENGINEER who produced them, and the Owner regardless of whether the instruments were copyrighted or whether the project for which they were prepared is executed. 4 The OWNER may retain reproducible copies of drawings and copies of other documents, in consideration of which it is mutually agreed that the OWNER will use them solely in connection with the PROJECT, and not for purpose of making subsequent extensions or enlargements hereto, save with the express written consent of the ENGINEER. Re-use for extension of the original PROJECT or for new projects shall require written permission of the ENGINEER and shall entitle him to further compensation. SECTION IX MEDIATION In the event of any conflicts that arise during the design and construction of the PROJECT or following completion of the PROJECT, the OWNER and the ENGINEER agree that all disputes arising out of or relating to this AGREEMENT or the PROJECT shall be submitted to non-binding mediation unless the parties agree otherwise. The OWNER and the ENGINEER further agree to include a similar mediation provision in all agreements with independent contractors and consultants retained for the PROJECT and to require all independent contractors and consultants also to include a similar mediation provision in all agreements with their sub- contractors, sub-consultants, suppliers and fabricators, thereby providing for mediation as the primary method for dispute resolution between the parties to all those agreements. If the OWNER and the ENGINEER are unable to reach a settlement of any dispute arising out of this AGREEMENT in accordance with the mediation process, then such disputes may, with the consent of both parties, be settled by binding arbitration in accordance with the terms of the Texas General Arbitration Act. SECTION X TERMINATION Either party to this AGREEMENT may terminate the AGREEMENT by giving to other party 30 days notice in writing. Upon delivery of such notice by the OWNER to the ENGINEER, the ENGINEER shall discontinue all services in connection with the performance of this AGREEMENT and shall proceed to cancel promptly all existing orders and contracts insofar as such orders or contracts are chargeable to this AGREEMENT. As soon as practicable after receipt of notice of termination, the ENGINEER shall submit a statement, showing in detail the services performed under this AGREEMENT to the date of termination. The OWNER shall then pay the ENGINEER promptly that proportion of the prescribed charges which the services actually performed under this AGREEMENT bear to the total services called for under this AGREEMENT less such payments on account of the charges as have been previously made. Copies of all completed or partially completed designs, plans and reports prepared under this AGREEMENT shall be delivered to the OWNER when and if this AGREEMENT IS TERMINATED, but subject to the restrictions, as to their use, as set forth in Section VIII. SECTION X{ LIABILITY The OWNER agrees that the ENGINEER's liability for the negligence, error, omission or breach of warranty in the preparation of designs and drawings, the designation or selection of materials and equipment, the selection and supervision of Project Representatives and other personnel, or the performance of any other services in connection with any assignment for which a particular written authorization is given by the OWNER pursuant to Section I11 of this AGREEMENT, shall in no event exceed the amount of the total compensation received by the ENGINEER for services rendered pursuant to that particular written authorization. 5 SECTION XII SUCCESSORS AND ASSIGNMENTS The OWNER and the ENGINEER each binds himself and his successors, executors, administrators and assigns to any other party of this AGREEMENT and to the successors, executors, administrators, and assigns of such other party, in respect to all covenants of this AGREEMENT. Except as above, neither the OWNER nor the ENGINEER shall assign, sublet or transfer his interest in this AGREEMENT without the written consent of the other. Nothing herein shall be constituted as creating any personal liability on the part of any officer or agent of any public body which may be a party thereto. SECTION XIII SPECIAL CONDITIONS Special conditions, under the AGREEMENT, include and are limited to those listed hereinafter; the conditions shall become part of the AGREEMENT: METHOD OF PAYMENT. Each month, ENGINEER shall furnish to OWNER a statement of the work performed during the preceding month. Such statement shall also include a detailed record of the month's actual reimbursable expenses. OWNER shall pay such statement within thirty (30) days of receipt. EXECUTED in three (3) counterparts (each of which is an original) on behalf of ENGINEER by AUTHORIZED SIGNATORY, as shown below, and on behalf of the OWNER by the CITY MANAGER (thereunto duly authorized) this day of 2007. THE CITY OF NORTH RICHLAND HILLS LOPEZGARCIA GROUP Bv: By: C. ..,~_ DOUGLA C. MIKEWORT P.E. PRINCIPAL, MANAGER - F RT WORTH MUNICIPAL DIVISION ATTEST: ATTACHEMENTS: Attachment "A" -Scope of Work ATTE The scope of work shall include the BASIC ENGINEERING and SURVEYING SERVICES for rehabilitation of the wastewater system items listed in the following tables identified as Attachment "A" Attachment "B" -Work Tasks and Fees BASIC ENGINEERING and SURVEYING SERVICES for the items listed in Attachment "A" shall be performed in accordance with the tasks and associated engineering and surveying fees listed in Attachment "B" Attachment "C" -Project Schedule Completion of the BASIC ENGINEERING and SURVEYING SERVICES shall be in accordance with the schedule identified as Attachment "C" 6 Attachment "A" -Scope of Work WASTEWATER SYSTEM REHABILITATION, CONTRACT "C" Sanitary Sewer Point Repairs Item Mapsco City of NRH Job ~ Manhole No. tream Down U t Size Line I Type I No. of Point I Repairs I C.I.P. Liner Open-Cut Type of Repair (LF) Pipe-Burst Sa Repair { Tap Repair SSMH Repair Total Length L,~ Pa. No. Grid Mao No. No. ~s _ream s ~ 100 --1 ~50V 2 2460 2461 6' VG Entire Line 100 1 60 2 I sov a sus 3 2450 4039 6" VC & PVC ~ 5 I 60 45 3 I 51S ~ 4 2444 4039 6" VC I 2 ! 15 30 15 4 { 50V N 5 2457 2458 6" VC ~ 1 I 15 1 t5 5 I 50V N 6 2456 2457 6" VC I 2 15 ~ 30 ~ 60 6 { 50V 7 2453 I 2452 6" VC I 3 30 15 7 50V o 2452 2451 6" VC 1 15 I I 1 0 8 510 13 107 108 6" VC 1 15 . 45 g g10 15 I 104 I 3966 8" VC 3 30 110 10 ~ 51M N 18 I C O 1 99 6" VC Entire Line 110 . 15 t1 510 m 19 3966 I 91 10" VC 1 15 . 15 12 510 0 N 20 91 108 10" VC 1 15 60 . 60 13 51L 37 98 110 6" VG ~ 4 ~ 15 14 510 39 3968 109 6" VC 1 15 30 15 51 M 21 3963 238 6" VC 2 15 15 _ 15 16 I 51L 23 I 295 I RiviaraDr. 8" " UNKN 1 15 I 15 15 17 I 51L 24 I 294 { 295 8 " VC 1 300 300 18 { 51L Y 31 273 274 6 VC Entire Line 0 19 I 51M ~- 35 235 Near 234 6" VC 1 ~ 1 45 20 I S1L o N 38 359 288 10" VC ~ 3 45 15 . 15 21 51L 41 301 I 98 6" VC 1 15 1 15 22 51L 42 I 299 I 300 6" VC 2 15 23 51M 43 309 235 6" VG 1 15 1 15 24 51 L 25 No ii 248 6" VC 1 15 I I 1 15 25 I 51L _ 26 246 I 247 6" VC 2 ! 15 ~ I 1 15 26 I s1L s 5tM ~ N 27 247 I 246 6" VC 2 I 15 I 2 . 600 27 51M m _ 28 246 1 231 6" VC EntireLine I 600 1 0 28 51L N _ 30 253 I 252 6" VC 1 I I I I 80 I 1 60 29 51M 32 230 I 232 6" UNKN ~ 2 ! 1 30 30 51L 36 252 251 6" VC 3 I 30 _ 1 15 32 ( 51 M 29 4 i 745 I 744 6" VC 2 15 15 I I - 30 15 33 I 51R 208422 48 I 746 I Cummings Dr 6" VC 1 15 45 34 I 51 M a0 I End of Una I 742 8" VG ~ 3 ~ 45 I I 2 0 35 51M 12 1397 I 1400 6" VC 2 I 15 i 15 _ 36 I 51M 208424 16 1 1350 I 1351 6" VC I 1 1 1 15 37 { 51M a4 237 { 1349 ~ - 6" UNKN ~ ~- 2 I 15 97575 I - I 1 2UU ~~ ~~~ ~ ~~~ !}~ 1 ~a~~ T ~~J I ~~~ ~.~ ~iiu~e ~n~c I ' Totals 80 210 485 1,100 815 12 7 2,080 A-1 Attachment "A" -Scope of Work WASTEWATER SYSTEM REHABILITATION, CONTRACT "C" New Sanitary Sewer Manholes Item Mapsco Pa. No. City of NRH Grid Mao No. SSMH Location No. Street Paving Size Line I Type Upstream Depth Downstream . Proposed 39 50V 7 Matson Dr. Asphalt 6" VC 6.00' 6.00' 6.00' 40 50V 8 Dent Rd. Asphalt 6" VC 6.00' 6.00' 6.00' 41 50V ~ 9 Tourist Dr. Concrete 6" VC 6.00' 5.18' 5.60' 42 51 S N _ 10 Cynthia Cir. Asphalt 6" VC 6.00' 6.00' 6.00' 43 51 S N 11 Circular Dr. Asphalt 6" VC 6.00' 6.00' 6.00' 44 51 S 12 Sheridon Dr. Asphalt 6" VC 6.00' 6.00' 6.00' 45 51 S 13 Northcut Dr. Asphalt 6" VC 6.00' 6.00' 6.00' 46 51 L 1 Larue Ct. Asphalt 6" VC Unknown 6.00' 7.00' 47 51L 2078-426 6 Katherine Dr. Asphalt 6" VC 6.00' 4.00' 5.00' 48 51Q 2081-420 4 Steven St. Asphalt 6" VC 5.00' 4.10' 4.55' 49 51Q 2081-422 3 Mike Dr. Asphalt 6" VC 5.00' 4.00' 4.50' 50 51 M 2081-424 2 Holiday Ln. E. Asphalt 6" VC 4.40' 4.20' 4.30' 51 51L 2081-426 5 Vance Rd. Asphalt 6" VC 6.40' 5.20' 5.80' A-2 52 53 o{Work „ „ ent AttachrY- e ..A., „ Scop CONTRACT ~ HAgILtTAT1ON~ R SYSTEM RE E WASTEWAT ine Repairs Sanitary $ewer L Reptacemen Limits Downstream Len th LF of NRN City Location pavin Street ~ stream Glenview Dr. 300 Mapsco Grid DI1aa N~' None E Manor Dr. 350 2081-420 & ) Mackey l End Webster St. 51Q 2081-422 None Orient Dr. (~} TOta~ 650 ~~ ~ 2072-416 i 51 S A-3 Prop. ~~"°`. Line e MetJ od 6„ . - 1 .~.---~" VC pipe-gurst 6" Attachment "B" -Work Tasks and Fees WASTEWATER SYSTEM REHABILITATION, CONTRACT "C" Direct Labor -Summary Item Labor Category Hours Rate 3 $ 165.00 $ 156 $ 155.00 $ 180 $ 115.00 $ 176 $ 85.00 $ 320 $ 65.00 $ 4 $ 130.00 $ 8 $ 75.00 $ 24 $ 115.00 $ 140 $ 65.00 $ Total Direct Labor S Labor Cost 495.00 24,180.00 20,700.00 14, 960.00 20, 800.00 520.00 600.00 2,760.00 9,100.00 94,115.00 1 Principal 2 Project Manager 3 Civil Engineer 4 Civil Designer 5 CADD Technician 6 Surveyor RPLS 7 Survey Technician 8 2-Person Survey Crew 9 Administrative Support Direct Cost -Summary Item Description 10 Reproduction Total Direct Cost S Cost 4,000.00 4,000.00 5 9s,11s.oo PREPARED BY: BEL CHECKED BY' RWA B-1 Attachment "B" -Work Tasks and Fees WASTEWATER SYSTEM REHABILITATION, CONTRACT "C" _ _ _. -_ - - Direct Labor -Task Details -- _ _ Taak Nsme Pnncipal Project Civii Civil CADD Surveyor Surrey 2-Person Administrative Total Hours Total Cost Desi net Technician RPLS Technician Survey Crew Support for Tssk for Task Tssk No. Manager Engineer 9 1,0 Data Gsthertng i 6 45 Review Work Orders & 1 4 16 8 1.1 Compile Data 8 24 4 112 1.2 Evaluate Site Conditions 16 2A 24 8 4 4 24 1.3 Franchise Utility research 4 8 8 24 181 Sub Total Direct Labor Hours 1 24 48 24 24 6 24 4 00 $ 115.00 $ 00 $ 75 30 65.00 Rates $ 165.00 $ 155.00 $ 115.00 $ 85.00 $ 65.00 $ . 1 . 1)0 $ 760 00 $ 2 560.00 1 SubToh/Labor Costs $ 165.00 $ 3,720.00 $ 5,520.00 $ 2,040.00 $ 1,560.00 $ . , 520.00 $ 600. , 2,0 Preliminary Design 380 2.1 Preliminary Plans 40 40 120 160 40 153 2.2 Preliminary SpeciFlcatlons 40 1 40 i6 16 8 18 Prepare Preliminary 4 4 2 3 Construction Cost Estimate 4 24 2.4 _, TzDOT Coordination 4 8 8 p 52 553 Sub-Total Direct Labor Hours 1 88 92 136 184 0 0 00 $ 65.00 00 $ 115 75 Rates $ 165 00 $ 155.00 S 115 00 $ 85.00 $ 65.00 S 130.00 $ . . _ $ - $ 3,380.00 Sub-Total Labor Costs $ 165.00 $ 13,640.00 $ 10,580 00 $ 11,560.00 $ , 3.0 Final Design 4 8 B 80 3.1 Final Plans 8 3.2 Final Specifications 1 8 8 8 8 4 Prepare Final Construction 2 2 3.3 t Estimate C os 2 3.4 TxDOT Permitting 4 4 4 0 14 SubTofal DI-ect Labo- Hours 1 18 22 16 92 5 00 $ 0 00 130 $ D 00 75 $ 115.00 $ 65.00 Rates $ 165.00 $ 155.00 $ 115.00 $ 135.00 $ . 6 . . ; 00 910 Sub-Total Labor Costs S 188.00 ; 2,790.00 S 2,530.00 ; 1,380.00 S 5,980.00 S - ~' - s _ . treUon i i Ad g,p n s m ConstrucUon 2 3.1 Advertisement 2 2 3.2 Bid Assistance 4 4 2 3.3 Bitl Tabulation 2 3 4 Pre-Construction Meeting 2 2 40 3,5 ConsWCtion Assistance 16 16 20 50 SubTota/ Olrect Labor Hours 0 26 18 0 20 D 130 00 S 0 00 75 $ 0 115.00 $ 65.00 Rates $ 165 00 $ 155.00 $ 115.00 $ 85.00 $ 65.00 $ . . S 00 250 3 SubTotal tabor costs S - S 4,030.00 S 2,070.00 S S 1,300.00 S - S S - . , = - - - 24 140 Total D/tact Labor Hours 3 158 180 178 320 4 8 00 65 Rates S 165 00 9; 155.00 S ti 15.00 A 85.00 S 65.00 E 130.00 $ 75.00 $ 115.00 $ . Tote/Labor Costs S 495.00 S 24,180.00 $ 20,700.00 $ 14,960.00 S 20,800.00 S 520.00 ; 800.00 ; 2,780.00 S 9,100.00 PREPARED BY. BEL B-y CHECKED BY' RWA 960 00 $ - $ 11 100 41 e is 183 ; 4,185.00 ; 11,940.00 ; 2,320.00 ; 18,445.00 ; 31,400.00 ; 15,985.00 ; 1,800.00 ; 2,320.00 ; 51,255.00 ; 7,420.00 ; a,o45.00 ; 800.00 s 1,a7o.oo ; 13,735.00 4 5 ; S 440.00 750.00 8 S 570.00 8 ; 670.00 92 S 8,220.00 114 ; 10,650.00 1011 ; 9a,11s.oo PR03ECT SCHEDULE City review Advertisement Construction yypSTEWATER SYSTEM ~~~ .project Schedule RENABIL~TATiON, CONT C•1 PREPARED BY: BEL r.HECKED BY' RW A