RESOLUTION NO. 2007-051
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF NORTH RICHLAND
HILLS, TEXAS:
SECTION 1. THAT the city manager is authorized to execute on behalf of the City of
North Richland Hills the attached Agreement between the City of North
Richland Hills and the Birdville Independent School District.
APPROVED AS TO CONTENT:
I1JC-~ C,X-
Mike Curtis, P.E., Public Works Director
Resolution No. 2007-051
Page 1 of 5
CITY OF NORTH RICHLAND HILLS
AGREEMENT WITH THE
BIRDVILLE INDEPENDENT SCHOOL DISTRICT
STATE OF TEXAS §
§ KNOW ALL MEN BY THESE PRESENTS
COUNTY OF TARRANT §
THAT the Birdville Independent School District (heteinafter called "BISD"), and
the City of North Richland Hills, Tarrant County, Texas (h~reinafter called "City"),
agree as follows:
City and BISD have collaboratively agreed to re-route a portion of Dick Lewis
Drive so that students will not have to cross the street going to and from the parking lot to
Richland High School, and to address a drainage problem at the intersection of Dick
Lewis Drive and Holiday Lane that has been caused by ~ilt and debris covering the
drainage outlet pipes; and to widen Holiday Lane and add a turn lane on Holiday Lane. ¡'
In consideration of the mutual covenants herein contained and for the purpose of
providing public improvements desired by City and BISD, including off-site drainage
improvements, street construction and traffic signal and signs as hereinafter described,
the BISD and the City hereto agree as follows:
1. BISD agrees to reconstruct 425 feet of Holiday Lane as a concrete street and to
construct a left turn lane at the intersection of Holiday Lane and Dick Lewis Drive
to city specifications in accordance with plans submitted to and approved by
City's public works department. City agrees to reimburse BISD 50%'ofthe cost
of such reconstruction, construction and required testing within 30 days of receipt
of each progressive billing from the contractor.
2. At City's request, BISD agrees to construct off-site channel improvements from
the outfall pipe of the existing Dick Lewis Drive storm drain system East to the
connection with the existing Calloway Branch channel to city sltecifications in
accordance with plans submitted to and approved by City's public works
department. City agrees to reimburse BISD 100% of the cost of such
improvements within 30 days of each progressive billing from the contractor.
3. At City's request BISD agrees to have a new traffic signal designed and installed
at the intersection of Holiday Lane and Dick Lewis Drive to city standards and
spebifications, with black powder coating, backlit street signs and an opticom
system and decorative street lights on mast arms. City agrees to reimburse BISD
50% of the cost of such signal installation within 30 days of each progressive
billing from the contractor.
AGREEMENT BETWEEN NORTH RICHLAND HILLS AND THE BIRDVILLE INDEPENDENT SCHOOL DISTRICT Page 1
Resolution No. 2007-051
Page 2 of 5
4. BISD agrees that any property donated or dedicated or to be dedicated in the
proposed development as well as all public improvements contemplated by this
agreement are roughly proportionate to the proposed development and waives any
claim to any such dedicated or donated property or for reimbursement for any
such public improvements. beyond what has been agreed to by City in this
Agreement. BISD and Citý further acknowledge and agree that either no public
infrastructure improvements have been required or that all prerequisites to a
determination of rough proportionality have been met, and that any costs incurred
relative to such dedication, donation or public improvements for such proposed
development are related both in nature and extent to the impact of such proposed
development upon City and its needs related thereto. ijISD and City waive any
and all claims they may have against each other to any and all rough
proportionality and individualized determination r~quirements mandated by the
U.S. Supreme Court in Dolan vs. City of Tigard, 512 U.S. 374 (1994) and by the
Texas Supreme Court in Town of Flower Mound ys. Stafford, 135 SW3d 620
(2004), as well as any other requirements for a nexus between development
conditions and the relationship and extent of impact of the development as related
to a need for required public infrastructure, property dedication, and park
donation requirements.
5. The City will provide the inspection as required, and üpon satisfactory completion
of the work the City will accept ownership and operation of the system subject to
the terms of the maintenance bonds, the cost of which shall be shared equally by
City and BISD.
6. City and BISD agree to pay the amounts set forth on the Shared Payment
Schedule attached hereto.
7. Upon completion of the work, good and sufficient title to all facilities constructed
warranted free of any liens or encumbrances is hereby vested in the City of North
Richland Hills, Texas. '
This Agreement was approved in its entirety at the meeting of the City Council of
the City of North Richland Hills on the _ day of _2007, by a majority vote of the
Council.
This Agreement was approved in its entirety at the meeting o( the Board of
Trustees of the Birdville Independent School District on the 23rd day of August, 2007.
BIRDVILLE INDEPENDENT SCHOOL DISTRICT
ByJff~a.JJ+~
Wanda Strong, President
AGREEMENT BETWEEN NORTH RICHLAND HILLS AND THE BIRDVILLE INDEPENDENT SCHOOL DISTRICT Page 2
Resolution No. 2007-051
Page 3 of 5
CITY OF NORTH RICHLAND HILLS
By:
Larry J. Cunningham, City Manager
ATTEST:
Patricia Hutson, City Secretary
APPROVED AS TO FORM AND LEGALITY:
George A. Staples, Attorney
APPROVED AS TO CONTENT:
Department Head
This item, or copy hereof, was
examined and approved by J.B.
Mor~ß ~
......
AGREEMENT BETWEEN NORTH RICHLAND HILLS AND THE BIRDVILLE INDEPENDENT SCHOOL DISTRICT Page 3
Resolution No. 2007-051
Page 4 of 5
Shared Payment Schedule
BISD Cost Share
Dick Lewis St - Holiday Lane Signalization West Utilities Total
(100%) (50%) (50%) (100%)
Construction Cost $ 449,225 $128,075 $ 49,625 $394,490 $1,021,415
HKS Architects $ 11,230.63 $3,021.88 $ 1,240.63 $ 9,862.25 $ 25,535.39
Engineering $ 20,215.13 $5,763.50 $ 4,350 $ 17,752.05 $ 48.080.68
Surveving $ 3,780 $1,890 -0- $ 945 $ 6.615
Testing $ 9,487.50 $1,302.50 -0- -0- $ 10,790 ,
Inspection (3.29%) $ 14,779.50 $4,213.67 $ 1,632.66 $ 12,978.72 $ 33,064.55*
Plan Review (2.19%) $ 9,838.03 $2,804.84 $ 1,086.79 $ 8,639.33 $ 22.368.99*
Total $518,555.79 $147,251.39 $ 57,935.08 $ 444,667.35 $1,168,409.61
* Inspection fee and Plan review fee of$55,433.54 to be.paid by contractor
Total BISD Share: $ 1,112,436.07
City of North Richland Hills Cost Share "
\
Holiday Lane Signalization Off-Site Channel Total
(50%) (50%) Improvements (100%)
Construction Cost $128,075 $ 49,625 $ 46,000 $ 223,700
HKS Architects $3,021.88 $ 1,240.63 $ 1,150 $ 5,592.51
Engineering $5,763.50 $ 4,350 $ 2,070 $ 12,183.50
Surveying $1,890 -0- $ 2,400 $ 4,290
Testing $1,302,50 -0- $ 200 $ 1,502.50
Inspection (3.29%) $4,213.67 $ 1,632.66 $ 1,513.40 $ 7,359.73*
Plan Review (2.19%) $2,804.84 $ 1,086.79 $ 1,007.40 $ 4,899.03*
Total $147,251.39 $ 57,935.08 $ 54,340.80 $ 25'A;527.27
*These fees are paid to the City ofNRH
Total Share of City of North Richland Hills: $ 247,268.51
.....
Agreement to share costs related to infrastructure improvements ant Dick Lewis Drive and Holiday Lane
August 2007
Resolution No. 2007-051
Page 5 of 5