HomeMy WebLinkAboutPZ 1982-11-04 Minutes
.
.
.
CALL TO ORDER
ROLL CALL
1.
PS 82-40
MINUTES OF THE SPECIAL MEETING OF THE
PLANNING AND ZONING COMMISSION OF THE
CITY OF NORTH RICHLAND -HILLS, TEXAS
NOVEMBER 4, 1982 6:30 P. M.
The meeting was called to order by the
Chairman, George Tucker, at 6:35 P. M.
PRESENT:
CHAIRMAN
SECRETARY
MEMBERS
AL T. ~~EMBER
ASST. DIR. PW/U
P & Z COORDINATOR
ABSENT:
George Tuc ker
Marjorie Nash
Don Bowen
Mark Wood
John Schwinger
Allen Bronstad
Wanda Ca 1 vert
Mark Hannon
Request of TLB-GSC Enterprises, Inc.
for RECONSIDERATION of the replat of
Lots 2R-6, revised· to Lots lR-4R,
Block B, College Hill Addition.
The Chairman said the reason for the
reconsideration of this request was due
to a technicality. He said there was
the thought that the land to the west
of Holiday Lane, which is also owned by
TLB-GSC Enterpri~es, was contigous to
the property in this replat, but the
Commission found out after talking with
their Engineer, Dick Perkins, that the
property to the west was out of another
tract of land and did not have to be
included in this plat.
Dick Perkins came forward to represent
TLB-GSC Enterprises~ He said they had
received the City Engineer1s comments
and were in agreement with #1 and will
have this correction'made before the
final approval by the City Council; #3
is a City Staff function; and #2 regarding
the construction of curb & gutter and
street, and the extension of the water
line, Mr. Perkins said he had discussed
this with Mr. Riddle and they agreed to
sign a covenant to run with the land to
the west of Holiday Lane, to do this when
they develop the land on both sides of
~
Page 2
P & Z Minutes
November 4, 1982
.
Holiday Lane. He said they prefer to
sign a covenant.
Mr. Perkins said Mr. Bonham owns the
property across Holiday Lane and they
plan to combine both sides of the street
for development at a later date, not only
the property to the north of this replat,
but almost to the Smithfield-Watauga Road
since they will need it for access to the
property.
Mr. Perkins said if they had to do this
construction now, it would make them have
a very high unit cost.
Mr. Tucker asked Mr. Bronstad if Mr. Riddle
had discussed this with him.
Mr. Bronstad said he had not.
Ms. Calvert said Mr. Riddle said if they
made the covenant to run with the land to
the west, he would agree to it.
.
Mr. Tucker said the 15 ft. building line
would have to be continued north along the
east side of Holiday Lane all the way.
PS 82-40
APPROVED
Mr. Perkins said that was fine. He showed
the Commission how they plan to layout the
future lots, and said they would agree to
the 15 ft. building line along Holiday Lane.
Ms. Nash made a motion to approve PS 82-40
subject to the Engineer's comments with the
exception of item #2, A & B, of the City
Engineer1s letter of November 2nd, that
a satisfactory arrangement be made with the
developer and City Staff on item #2-A & B.
This motion was seconded by Mr. Wood and
the motion carried 5-0.
.
ADJOURNMENT The meeting adjourned at 6:45 P. Me