Loading...
HomeMy WebLinkAboutPZ 1982-11-04 Minutes . . . CALL TO ORDER ROLL CALL 1. PS 82-40 MINUTES OF THE SPECIAL MEETING OF THE PLANNING AND ZONING COMMISSION OF THE CITY OF NORTH RICHLAND -HILLS, TEXAS NOVEMBER 4, 1982 6:30 P. M. The meeting was called to order by the Chairman, George Tucker, at 6:35 P. M. PRESENT: CHAIRMAN SECRETARY MEMBERS AL T. ~~EMBER ASST. DIR. PW/U P & Z COORDINATOR ABSENT: George Tuc ker Marjorie Nash Don Bowen Mark Wood John Schwinger Allen Bronstad Wanda Ca 1 vert Mark Hannon Request of TLB-GSC Enterprises, Inc. for RECONSIDERATION of the replat of Lots 2R-6, revised· to Lots lR-4R, Block B, College Hill Addition. The Chairman said the reason for the reconsideration of this request was due to a technicality. He said there was the thought that the land to the west of Holiday Lane, which is also owned by TLB-GSC Enterpri~es, was contigous to the property in this replat, but the Commission found out after talking with their Engineer, Dick Perkins, that the property to the west was out of another tract of land and did not have to be included in this plat. Dick Perkins came forward to represent TLB-GSC Enterprises~ He said they had received the City Engineer1s comments and were in agreement with #1 and will have this correction'made before the final approval by the City Council; #3 is a City Staff function; and #2 regarding the construction of curb & gutter and street, and the extension of the water line, Mr. Perkins said he had discussed this with Mr. Riddle and they agreed to sign a covenant to run with the land to the west of Holiday Lane, to do this when they develop the land on both sides of ~ Page 2 P & Z Minutes November 4, 1982 . Holiday Lane. He said they prefer to sign a covenant. Mr. Perkins said Mr. Bonham owns the property across Holiday Lane and they plan to combine both sides of the street for development at a later date, not only the property to the north of this replat, but almost to the Smithfield-Watauga Road since they will need it for access to the property. Mr. Perkins said if they had to do this construction now, it would make them have a very high unit cost. Mr. Tucker asked Mr. Bronstad if Mr. Riddle had discussed this with him. Mr. Bronstad said he had not. Ms. Calvert said Mr. Riddle said if they made the covenant to run with the land to the west, he would agree to it. . Mr. Tucker said the 15 ft. building line would have to be continued north along the east side of Holiday Lane all the way. PS 82-40 APPROVED Mr. Perkins said that was fine. He showed the Commission how they plan to layout the future lots, and said they would agree to the 15 ft. building line along Holiday Lane. Ms. Nash made a motion to approve PS 82-40 subject to the Engineer's comments with the exception of item #2, A & B, of the City Engineer1s letter of November 2nd, that a satisfactory arrangement be made with the developer and City Staff on item #2-A & B. This motion was seconded by Mr. Wood and the motion carried 5-0. . ADJOURNMENT The meeting adjourned at 6:45 P. Me ¿7~c ~~ CHAIR~AN, PLANNING & ZONING COMMISSION 7JJ .~~~~ ~.~ PLANNING & Z~~ COMMISSION