HomeMy WebLinkAboutCIP 1989-06-29 Minutes
Present:
ITEM
MISCELLANF.X)US
DRAINAGE SYSTEM
IMPROVEMENTS TO
RELIEVE FLOODING
OF RESIDENCES
FINANCIAL REPORI'
MINUTES FOR CIP MEEI'ING
June 29, 1989
Tarmy Brown
Richard Davis
Frank Metts
Byron Sibbet
Lyle Welch
Rodger N. Line
Dennis Horvath
Greg Dickens
Lee Maness
Carl Snider
Kevin Miller
Richard Albin
Phil Phillips
Mayor
Mayor Pro Tern
Councilman
Councilmëm
Councilman
City Manager
Deputy City Manager
Director of Public Works/Utilities
Director of Finance
Senior Accountant
Asst. Director Public Works/Utilities
Consulting City Engineer
Consulting City Engineer
DISCUSSION
ASSIGNMENT
The CIP Corrmi ttee and staff discussed the
nine (9) known flood prone areas and the
estimated cost of proposed drainage
improvements. Several citizens fran
these areas who flooded or were concerned
about potential flooding were present
at the meeting. The Corrmittee requested
input fran the citizens in attendance
and sane spoke.
CIP Members -
Rank drainage
projects in
order of
priority;
Greg -
(1) Further
quantify hanes
flooded
(2) Progress
report for
clearing
Mackey Drive
drainage easement
The Corrmittee recarmended the staff try
and quantify the number of horœs which
flooded in these nine (9) areas and the
entire city as accurately as possible
prior to the next CIP meeting July 27,
1989 at 3:00 P.M. It also recommended
all CIP members rank the proposed drainage
projects fran 1 to 9 with 1 being the
project where the most benefit can be
achieved for each dollar spent. These
rankings should be ready for the next
meeting.
All Council members should be invited to the
next CIP meeting. The staff should be
prepared to give a progress report at the
next meeting on the clearing of the drainage
easement located behind the houses on
Mackey Drive between Victoria and Riviera.
The financial report was distributed at the
meeting.
N/A