HomeMy WebLinkAboutCIP 1984-02-09 Minutes
MINUTES OF THE CIP MEETING
FEBRUARY 9, 1984
Present: Jim Ramsey
Richard Davis
~dger N. Line
vDennis Horvath
Gene Riddle
Richard Albin
Mayor Pro Tern
Councilman
City Manager
Assistant City Manager
Public Works Director
City Engineer
Mayor Pro Tern Ramsey asked the Staff if they were satisfied with the
construction job on Rufe Snow, specifically two areas: one was the asphalt
approach to the railroad crossing and the other was an apparent cosmetic
problem slightly to the north of the railroad. The problem with the railroad
track is that the engineering specifications required that the road be built to
the same grade as the existing railroad track. This was done by the
contractor, however, the railroad changed the grade of the track. Gene
Riddle and Rodger Line will work with the railroad to attempt to resolve the
problem.
Richard Albin confirmed to the committee that the North Hills Street project
was apparently finished with inferior asphalt, which will hasten its
deterioration. Documentation has started with the contractor for restitution.
It is necessary to call their bond, we are faced with probably several years
of litigation.
Richard Albin was asked the status of the storm drainage master plan. He
stated that it was approximately 30% complete and the contract with KEF
requires that the plan be finished six months after the Corp of Engineers
have finished their study. Rodger Line will contact Milburn Smith, with the
Corp of Engineers, to check on the status.
Mayor Pro Tern Ramsey asked the Staff to consider signalization of Smithfield
Road and Davis Blvd. The discussion that followed centered around the
possibility of constructing Watauga Road and signalizing that intersection.
The southbound lane currently under construction on Davis Blvd. will ease
the problem somewhat.
Rodger Line briefed the committee on the need to acquire right-of-way and
easements on Flory Street. Richard Albin will have all the details on Flory
and the Calloway Acres projects for presentation to the Council on February
27th, 1984.
It was decided that Center Street be dropped from the CIP and the details
pertaining to the construction of Mickey will be presented at the Council
Meeting of February 27th.
Richard Albin was given authorization to proceed with design and engineering
with the unpaved portion of Lola, including necessary drainage.
CIP Meeting 2/9/84
Page Two
Mayor Pro Tern Ramsey and Richard Davis will recommend priorities for the
final 13 streets identified under previous bond programs. They will also
recommend which of those 13 streets should be deleted from the CIP. This
priority listing will be available February 13th and presented to the full
Council on February 27th.
Richard Albin will prepare pre-design estimate on correcting the serious
street and drainage problem at Lynn Terrace. This will be completed by the
meeting on February 27th.
By the 27th of February the Staff will prepare comments on the advisability
of proceeding with either Glenview, Harwood or Watauga Road. The pros and
cons of each project was discussed.