HomeMy WebLinkAboutOrdinance 2706 City of North Richland Hills, Texas Industrial Wastewater Ordinance No. 2706 (Approved by Council 5/12/2003) Public Works Department 7301 N.E. Loop 820 North Rich/and Hills, Texas 76180 (817) 427-6400 TABLE OF CONTENTS SECTION I - DEFINITIONS............... ............................................ ............................. 1 SECTION II - PURPOSE AND POLiCy..................................................................... 9 SECTION 111- DISCHARGE PROHIBITIONS AND LIMITATIONS.......................... 10 A. DISCHARGES TO STORM DRAINS AND WATERCOURSES .................. 10 B. PROHIBITED DiSCHARGES......... ............................. ................................ 10 C. PROHIBITED SEWER CONNECTIONS .................................................... 10 D. PROHIBITED WASTEWATER CONSTITUENTS ...................................... 11 Temperature................................................................................................ 11 Solidifying Substance .............. ...................................................... .............. 11 Explosive...................................... .................. .................................... ......... 11 Obstruction......................... ....................... .................. ................................ 11 Garbage................ ..... .......................... ....................................................... 11 Gases....... ... ............................ ............................... .......... ... .................... .... 11 Sludge................................ ....................... .................. .......................... ...... 11 N PDES ........................................................................................................ 12 Objectionable Color..................................................................................... 12 Slugload ...................................................................................................... 12 Hazard to human life................................................................................... 12 Toxicity Test................................................................................................ 12 Swimming PooL........................................................................................... 12 Detergents................................................................................................... 12 Medical Waste............................................................................................. 12 Pollutants.......... ........ ..... .......... ... ............. ............... .. ................................... 12 E. WASTEWATER LIMITATIONS............................. ............. ......................... 12 Fats, oils, and greases................................................................................ 12 Acids or alkalies.......................................................................................... 13 Metals.. ..................... ..... .................. ....................... ... ............... ............. ...... 13 Cyanide....................................................................................................... 13 Gases......................................... ............. ............... ........ .......... ... ..... ........... 13 Rad ioactive..... .......... ..... .......................... .......... ..... ..................................... 13 T oxics . . . . . . . . . . . . . . . . .. .. . . . . . . .. . . . . . . . . . .. .. . .. . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . .. . .. ... . . . . . . .. . .. 13 T emperatu re .................. .................................... ..... ............. ............. ........ ... 13 Categorical.................................................................................................. 14 Explosive............. .................. .......... ... .................. .................... ............. ...... 14 F. ACCIDENTAL DISCHARGE/SLUG CONTROL PLAN................................ 14 SECTION IV -SPECIAL RULES RELATING TO INDUSTRIAL DiSCHARGERS.... 14 A. COMPLIANCE WITH STAN DARDS ........................................................... 14 Applicable Laws.......................................................................................... 14 Dilution........................................................................................................ 14 Mass Limitations.......................................................................................... 14 B. ACCIDENTAL DiSCHARGES....................................................................... 15 C. WASTEWATER DISCHARGES INTO PRIVATE SEWER SYSTEMS ......... 16 D. PROHIBITION OF ByPASS.......................................................................... 16 Bypass. . . .. . . . .. .. . .. . . .. . . . . . . . .. . . . . .. . ... ..... . . . . . . . .. . . . . . . . . . . . . .. . . .. . . . . . . . . . .. .. . .... . ... .. .. . .. . . . ... 16 E. NOTIFICATION OF HAZARDOUS WASTE DISCHARGES ......................... 16 SECTION V - ADMINISTRATION BY PERMIT........................................................ 17 A. CLASSIFICATION OF DISCHARGERS AND PERMITS .............................. 17 B. PERMIT CONDITIONS................................................................................. 19 C. REPORTING REQUIREMENTS FOR DISCHARGERS ............................... 21 D. INSPECTION AND FLOW MEASUREMENT................................................ 25 Inspection.............. ....................... ................ ............................................... 25 Measurement of Flow.................................................................................. 27 E. PERMIT MODIFiCATIONS............................................................................ 27 F. CONFI DENTIAL I N FORMATION.................................................................. 28 G. WASTEWATER DISCHARGE PERMIT REISSUANCE ................................ 29 SECTION VI - ENFORCEMENT.............................................................................. 29 A. REVOCATION OF PERMIT .......................................................................... 29 B. NOTIFICATION OF VIOLATION ................................................................... 30 C. ADMINISTRATIVE ORDERS................................................................. ....... 30 D. RIGHT OF APPEAL OF ADMINISTRATIVE RULING................................... 31 E. JUDICIAL PROCEEDINGS............................ ..... .......................................... 31 F. EMERGENCY SUSPENSION OF SERVICE & DISCHARGE PERMITS ...... 31 G. OPERATING UPSETS.................................................................................. 32 H. RECOVERY OF COSTS INCURRED BY THE AUTHORITY........................ 33 I. FALSIFYING INFORMATION......................................................................... 33 J. POTW PRETREATMENT REQUIREMENTS .................................................33 SECTION VII - MiSCELLANEOUS.......................................................................... 33 A. NET/GROSS CALCULATIONS............. ........................................................ 33 B. PRESERVATION OF RECORDS.............. ..................................... ............... 34 C. COSTS OF ADMINISTERING PROGRAM ...................................................34 D. RIGHT OF REViSiON................................................................................... 34 E. PUBLICATION OF LIST OF SIGNIFICANT VIOLATORS .............................34 SECTION VIII - CUMULATIVE CLAUSE................................................................. 34 SECTION IX - REMEDIES....................................................................................... 35 SECTION X - SEVERABILITY CLAUSE.................................................................. 35 SECTION XI - FINES............................................................................................... 35 SECTION XII - EFFECTIVE DATE........................................................................... 35 ORDINANCE NO. 2706 AN ORDINANCE REQUIRING PERMITS TO DISCHARGE INDUSTRIAL WASTE INTO THE NORTH RICHLAND HILLS SANITARY SEWER SYSTEM; AUTHORIZING THE DIRECTOR OF THE NORTH RICHLAND HILLS PUBLIC WORKS DEPARTMENT TO PROMULGATE REGULATIONS PERTAINING TO SUCH PERMITTING, PROVIDING FOR DEFINITIONS, MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ORDINANCE NO. 2687 AND ALL ORDINANCES AND PROVISIONS OF THE NORTH RICHLAND HILLS CITY CODE IN CONFLICT HEREWITH; PROVIDING A SAVINGS CLAUSE; PROVIDING A PENALTY; ENGROSSING AND ENROLLING THIS ORDINANCE; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF NORTH RICHLAND HILLS, TEXAS: SECTION I - DEFINITIONS When used in this Ordinance, these terms shall be defined as follows: Abnormal Sewage: Any industrial waste discharged into the Authority's sanitary sewer which, when analyzed, shows by weight a Total Suspended Solids (TSS) concentration greater than 240 mg/L or a Biochemical Oxygen Demand (BOD) concentration greater than 210 mg/L. In addition, the Authority may judge independently a waste's suitability for discharge to the POTW that requires additional treatment, based upon BOD, TSS or other characteristics, as abnormal. Any waste in this classification must be made acceptable for discharge into the POTW as defined in this ordinance. Act: The Clean Water Act (33 U.S.C. 1251 et seq), as amended. Approval Authority: The Regional Administrator of the EPA, or the Director of a state agency delegated to act on EPA's behalf with an approved pretreatment program (e.g. Director of Texas Commission on Environmental Quality (TCEQ)). Authority: The City of North Richland Hills, Texas. Authorized Representative: Authorized representatives (Authorized Signatories) for wastewater discharge permit applications and for reports submitted under Section V, of this ordinance are: A. A responsible corporate officer, if the discharger submitting the application or report is a corporation. This includes the president, vice-president, secretary or treasurer of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation. Industrial Wastewater Ordinance No. 2706 Page 1 of 40 B. The manager of one or more manufacturing, production or operation facilities employing more than 250 persons or having gross annual sales or expenditures exceeding $25 million (in second-quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. C. For a partnership or sole proprietorship, a general partner of the proprietor, respectively. D. The principal executive officer or director having responsibility for the overall operation of the facility if the discharger is a federal, state or local governmental entity, or their agents. E. A duly authorized representative of the individual designated in A, B, C or D above if: a) the authorization is made in writing by the individual described above in A, B, C, or D, b) the authorization specifies either an individual or a position having responsibility for the overall operation of the facility from which the discharge originates (such as a plant manager), or a position of equivalent responsibility, or having overall responsibility for environmental matters for the company, and c) the written authorization is submitted to the City. If an authorization is no longer accurate because a different individual or position has responsibility, a new authorization must be submitted to the City prior to or together with any reports signed by an authorized representative. Biochemical Oxygen Demand (B.O.D.): The quantity of oxygen utilized in the biochemical oxidation of organic matter under standard laboratory procedure in five days at twenty (20) degrees Centigrade, expressed as parts per million by weight or in terms of milligrams per liter. Bypass: The intentional diversion of waste streams or wastewater from any portion of a discharger's wastewater treatment equipment or pretreatment facility. Categorical Pretreatment Standards: Limitations on pollutant discharges to POTWs promulgated by EPA in accordance with Section 307 of the Clean Water Act, that apply to specified process wastewaters of particular industrial categories [40 CFR 403.6 and Parts 405-471]. CFR: Code of Federal Regulations. City: City of North Richland Hills, Texas. Chemical Oxygen Demand (COD): A measure of the oxygen consuming capacity of inorganic matter present in the water or wastewater expressed in mg/L as determined by the amount of oxidant consumed from a chemical reflux. Such term does not, however, differentiate between stable and unstable organic matter, and therefore does not necessarily correlate with biochemical oxygen demand. Combined Wastestream Formula (CWF): A procedure found in 40 CFR 403.6 (e) for calculating fixed alternative discharge limits at industrial facilities applicable when Industrial Wastewater Ordinance No. 2706 Page 2 of 40 regulated process wastewater, subject to a categorical pretreatment standard, is mixed with non-regulated wastewaters prior to treatment. Composite Sample: A mixture of grab samples collected at the same sample point at different times and composed of not less than four samples. The series of samples may be collected on a time or flow proportional basis. A. Time Proportional Composite Sample - A sampling method which combines discrete samples of constant volume collected at constant time intervals (e.g., 200 milliliter samples collected every half hour for a 24-hour period). B. Flow Proportional Composite Sample - A sampling method which combines discrete samples collected over time, based on the flow of the waste stream being sampled. There are two methods used to collect this type of sample. One method collects a constant sample volume at time intervals which vary based on the stream flow [e.g., 200 milliliters of sample collected for every 5,000 gallons discharged]. The other method collects samples of varying volume, based on stream flow, at constant time intervals. Control Authority: Trinity River Authority of Texas and/or City of Fort Worth, Texas as holders of the respective National Pollutant Discharge Elimination System (NPDES) permits. Cooling Water: The water discharged from any system of condensation such as air conditioning, cooling, refrigeration or water used as a coolant in cooling towers where the only pollutant is thermal. Director: The Director of Public Works of the City of North Richland Hills, or his authorized representative. Discharger: Any user discharging an effluent into a POTW by means of pipes, conduits, pumping stations, force mains, constructed drainage ditches, surface water intercepting ditches, intercepting ditches, and all constructed devices and appliances appurtenant thereto. The term includes owners and occupants of such premises. EPA: Environmental Protection Agency of the federal government. Existing Source: Any source of discharge, the construction or operation of which commenced prior to the publication by the EPA of proposed categorical pretreatment standards, which will be applicable to such source if the standard is thereafter promulgated in accordance with Section 307 of the Act. Garbage: Solid waste from domestic or commercial preparation, cooking or dispensing of food or from the handling, storage, and sale of produce. gpd: gallons per day Industrial Wastewater Ordinance No. 2706 Page 3 of 40 Grab Sample: A sample which is taken from a waste stream on a one time basis with no regard to the flow of the waste stream and without consideration of time. The sample is collected over a period of time not exceeding 15 minutes. Industrial Waste: Solid, liquid or gaseous waste resulting from any industrial, manufacturing, trade, or business process or from the development, recovery or processing of natural resources. Industrial User or User: a source of Indirect Discharge. Instantaneous Maximum Allowable Discharge Limit: The maximum concentration of a pollutant allowed to be discharged at any time, determined from the analysis of any discrete or composite sample collected, independent of the industrial flow rate and the duration of the sampling event. Inteñerence: A discharge which, alone or in conjunction with a discharge or discharges from other sources, both: A. Inhibits or disrupts the POTW, its treatment processes or operations, or its sludge processes, use or disposal; and B. Therefore is a cause of a violation of any requirement of the POTWs NPDES permit (including an increase in the magnitude or duration of a violation) or of the prevention of sewage sludge use or disposal in compliance with the following statutory provisions and regulations or permits issued thereunder (or more stringent state or local regulations): Section 405 of the Clean Water Act, the Solid Waste Disposal Act (SWDA) (including Title II, more commonly referred to as the Resource Conservation and Recovery Act (RCRA), and including state regulations contained in any state sludge management plan prepared pursuant to Subtitle D of the SWDA, the Clean Air Act, the Toxic Substances Control Act, and the Marine Protection, Research and Sanctuaries Act. May: Is permissive. Maximum Daily Average: The maximum concentration of a substance allowed in a discharge as determined from a laboratory test of a daily composite sample. When wastewaters are collected and stored for more than a day prior to discharge, such as batch discharges, a laboratory test of a grab sample of the stored wastewater may be used to determine the maximum daily average concentration. Maximum Grab: The maximum concentration of a substance allowed in a discharge as determined from a laboratory test of a grab sample. mg/L: Milligram per liter. New Source: Any building, structure, facility or installation from which there is or may be a discharge of pollutants, the construction of which commenced after the publication of proposed Pretreatment Standards under section 307(c) of the Act which will be Industrial Wastewater Ordinance No. 2706 Page 4 of 40 applicable to such source if such standards are thereafter promulgated in accordance with that section, provided that: A. The building, structure, facility or installation is constructed at a site at which no other source is located; or B. The building, structure, facility or installation totally replaces the process or production equipment that causes the discharge of pollutants at an existing source; or C. The production or wastewater generating processes of the building, structure, facility or installation are substantially independent of an existing source at the same site. In determining whether these are substantially independent, factors such as the extent to which the new facility is integrated with the existing plant, and the extent to which the new facility is engaged in the same general type of activity as the existing source should be considered. D. Construction on a site at which an existing source is located results in a modification rather than a new source if the construction does not create a new building, structure, facility or installation meeting the criteria of B or C above but otherwise alters, replaces, or adds to existing process or production equipment. E. Construction of a new source as defined under this paragraph has commenced if the owner or operator has; 1. Begun, or caused to begin as part of a continuous onsite construction program; a. Any placement, assembly, or installation of facilities or equipment; or b. Significant site preparation work including clearing, excavation, or removal of existing buildings, structures, or facilities which is necessary for the placement, assembly, or installation of new source facilities or equipment; or 2. Entered into a binding contractual obligation for the purchase of facilities or equipment which is intended to be used in its operation within a reasonable time. Options to purchase or contracts which can be terminated or modified without substantial loss, and contracts for feasibility, engineering, and design studies do not constitute a contractual obligation under this paragraph. Noncontact Cooling Water: Water used for cooling which does not come into direct contact with raw materials, intermediate product, waste product, or finished product. NPDES: National Pollutant Discharge Elimination System permit program of the Environmental Protection Agency, and/or the program of the state agency delegated to act on EPA's behalf with an approved pretreatment program (e.g. TPDES or Texas Pollutant Discharge Elimination System). Industrial Wastewater Ordinance No. 2706 Page 5 of 40 o and M (or O&M): Operation and Maintenance. Other Wastes: Decayed wood, sawdust, shavings, bark, lime, refuse, ashes, garbage, offal, oil, tar, and all other substances except sewage and industrial wastes. Owner or Occupant: The person, firm, or public or private corporation, using the lot, parcel of land, building or premises connected to and discharging sewage, industrial wastewater or liquid, into the sanitary sewage system of the City, and who pays, or is legally responsible for the payment of, water rates or charges made against the said lot, parcel of land, building or premises, if connected to the water distribution system of the City, or who would payor be legally responsible for such payment if so connected. Pass Through: The discharge of pollutants through the POTW into waters of the United States in quantities or concentrations which are a cause of or significantly contribute to a violation of any requirement of the POTWs NPDES permit. Permit: Wastewater Discharge Permit, issued to non-domestic dischargers of industrial waste into the sanitary sewerage system of the POTW. Person: Any individual, business entity, partnership, corporation, governmental agency, political subdivision, or any agent or employee thereof. pH: The logarithm (base 10) of the reciprocal of the concentration of hydrogen ions, in grams per liter of solution. Pollutant: Dredged spoil, solid, waste, incinerator residue, sewage, garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive materials, heat, wrecked or discarded equipment, rock, sand, cellar dirt and industrial, municipal and agricultural waste discharged into water. POTW (Publicly Owned Treatment Works): Any sewage treatment plant owned and operated by an entity (i.e. the Control Authority) other than a private industry and the sewers, pipes and conveyances owned in whole or part by the Authority and/or Control Authority that convey wastewater to the sewage treatment plant. This definition includes any devices and systems used in the storage, treatment, recycling and reclamation of municipal sewage or industrial waste of a liquid nature. Pretreatment: The reduction of the amount of pollutants, the elimination of pollutants, or the alteration of the nature of pollutant properties in wastewater to a less harmful state prior to or in lieu of discharging or otherwise introducing such pollutants into the sanitary sewer. Pretreatment Requirements: Any substantive or procedural requirement related to pretreatment, other than a Pretreatment Standard, imposed on an industrial user. Pretreatment Standard: The term "Pretreatment Standard," or "Standard" means prohibited discharge limits established pursuant to 40 CFR Part 403.5, categorical pretreatment standards, and local limits. Industrial Wastewater Ordinance No. 2706 Page 6 of 40 Public Works Utility Superintendent (or Superintendent): Public Works Utility Superintendent of the City of North Richland Hills, or his authorized representative. Sanitary Sewer: A publicly owned pipe or conduit designed to collect and transport industrial waste and domestic sewage to the POTW. Severe Property Damage: Substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can be reasonably expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. Sewage: Water-carried human wastes or a combination of water-carried wastes from residences, business buildings, institutions and industrial establishments, together with such ground, surface, storm or other waters as may be present. Shall: Is mandatory. Significant Change: An increase or decrease in the volume of wastewater discharged by more than 20 percent from the data submitted in the permit application, or the deletion or addition of any pollutant regulated by the Authority or by a categorical standard. Volumes are those measured by the water service meter, a verifiable estimate, or a permanently installed effluent flow meter approved by the Authority. Significant Industrial User (SIU): All industrial users subject to categorical pretreatment standards and any other industrial user that: discharges an average of 25,000 gallons per day or more of process wastewater to a POTW (excluding sanitary, noncontact cooling or boiler blowdown wastewater); contributes a process waste stream which makes up 5 percent or more of the average dry weather hydraulic or organic capacity of a POTW; or is designated as such by the Authority on the basis that the industrial user has a reasonable potential for adversely affecting a POTWs operation or for violating any pretreatment standard or requirement. Upon a finding that a noncategorical industrial user meeting the criteria for a significant industrial user has no reasonable potential for adversely affecting a POTWs operation or for violating any pretreatment standard or requirement, the Authority may at any time on its own initiative or in response to a petition received from a noncategorical industrial user, determine such user is not a significant industrial user. Slug or Slug load: Any discharge of a non-routine, episodic nature, including but is not limited to an accidental spill or a non-customary batch discharge. Standard Industrial Classification (SIC) Code: A classification pursuant to the Standard Industrial Classification Manual issued by the United States Office of Management and Budget. Standard Methods: "Standard Methods for the Examination of Water and Wastewater", a publication prepared and published jointly by the American Public Health Association, American Waterworks Association and the Water Pollution Control Federation, as it may be amended from time to time. Industrial Wastewater Ordinance No. 2706 Page 7 of 40 Storm Water: Any flow occurring during or following any form of natural precipitation, and resulting from such precipitation including snowmelt. Total Suspended Solids (TSS): Solids that either float on the surface of, or in suspension in, water, sewage or other liquid and which are removable by laboratory filtering. Total Toxic Organics: The sum of masses or concentration of the toxic organic compounds listed in 40 CFR 122 Appendix D, Table II, excluding pesticides, found in industrial users' discharges at a concentration greater than 0.01 mg/L. Only those parameters reasonably suspected to be present, to be determined by the City, if any, shall be analyzed for with non-categorical industries. With Categorical industries, TTO's will be sampled for as stipulated in the particular category or those parameters reasonably suspected to be present, to be determined by the City, where not stipulated. TPDES: Permit issued by the State under authority delegated pursuant to 33 USC 1342(b) that authorizes the discharge of pollutants to waters of the United States, whether the permit is applicable on an individual, group or general area-wide basis. Unpolluted Water or Waste: Any water or liquid waste containing none of the following: phenols or other substances to an extent imparting taste and odor in receiving waters; toxic or poisonous substances in suspension, colloidal state or solution; noxious or odorous gases; more than ten thousand (10,000) parts per million, by weight, of dissolved solids, of which not more than twenty-five hundred (2500) parts per million are chloride; not more than ten (10) parts per million each of TSS and B.O.D.; color not exceeding fifty (50) color units; nor pH value of less than 5.5 nor higher than 11.0 and any water or waste approved for discharge into a stream or waterway by the appropriate state authority. Upset: An exceptional incident in which a discharger unintentionally and temporarily is in a state of noncompliance with the standards established in this ordinance, due to factors beyond the reasonable control of the discharger and excluding noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation thereof. U.S.C: United States Code V.A.C.S.: Vernon's Annotated Civil Statutes of the State of Texas. Wastewater: Liquid and water-carried industrial waste and sewage from residential dwellings, commercial buildings, industrial and manufacturing facilities, and institutions, whether treated or untreated, which are contributed to the POTW. Industrial Wastewater Ordinance No. 2706 Page 8 of 40 SECTION II - PURPOSE AND POLICY This ordinance provides for prohibitions on discharges of certain substances into the public sewer system of the City from all sources, domestic, commercial, or industrial. A further purpose of this ordinance is to set forth uniform requirements for industrial dischargers into the Authority's wastewater collection and treatment systems, and to enable the Authority to protect the general public's health and POTW personnel in conformance with all applicable state and federal laws relating thereto. Parts of this ordinance are enacted pursuant to regulations established by the U.S. Environmental Protection Agency (EPA). All applicable State and Federal laws, including the Clean Water Act (33 United States Code 1251 et seq.) and as set forth in 40 CFR Part 403. All categorical pretreatment standards, lists of toxic pollutants, industrial categories and other standards and categories which have been or which will be promulgated by the EPA shall be incorporated as a part of this ordinance, as will EPA regulations regarding sewage pretreatment established pursuant to the Act, and amendment of this ordinance to incorporate such changes shall not be necessary. The Authority shall maintain current standards and regulations which shall be available for inspection and copying. The objectives of this ordinance are: A. To prevent the introduction of pollutants into the Authority wastewater system which will interfere with the normal operation of the system, including interference with the use or disposal of sludge, or contaminate the resulting sludge; B. To prevent the introduction of pollutants into the Authority wastewater system which do not receive adequate treatment in the POTW, and which will pass through the system into receiving waters or the atmosphere or which are otherwise incompatible with the system; and C. To improve the opportunity to recycle or reclaim municipal and industrial wastewaters and sludges. D. To provide for the fees for the equitable distribution of the cost of operation, maintenance, and improvement of the POTW. E. To enable the City to comply with its NPDES permit conditions, sludge and disposal requirements, and any other Federal and State laws to which the POTW is subject. The regulation of discharges into the Authority's wastewater system under this ordinance shall be accomplished through the issuance of permits, as specified in Section V herein, and by monitoring and inspection of facilities, according to this ordinance. The Director shall have the authority to promulgate such administrative regulations as are from time to time necessary for the enforcement of this ordinance. Industrial Wastewater Ordinance No. 2706 Page 9 of 40 SECTION III - DISCHARGE PROHIBITIONS AND LIMITATIONS A. DISCHARGES TO STORM DRAINS AND WATERCOURSES It shall be unlawful for any person to discharge or cause to be discharged any wastewater into any storm drain or watercourse within the City, except for those persons with approved permits for such discharges. B. PROHIBITED DISCHARGES No person shall discharge or cause to be discharged any storm water, surface water, ground water, artesian well water, roof runoff, subsurface drainage, condensate, deionized water, noncontact cooling water, and unpolluted wastewater or drainage from downspouts, yard drains, yard fountains and ponds, or lawn sprays into any sanitary sewer. Water from unpolluted industrial water or cooling water from various equipment shall not be discharged into sanitary sewers if an alternate acceptable means of disposal is available. If an alternate acceptable means of disposal is not available, such water may be discharged into the sanitary sewer provided the water is metered and meets the discharge prohibitions and limitations of this ordinance. 1. General Prohibition - No user shall introduce or cause to be introduced into the POTW any pollutant or wastewater which causes pass through or interference. These general prohibitions apply to all users of the POTW whether or not they are subject to categorical pretreatment standards or any other National, State, or local Pretreatment standards or requirements. 2. Specific Prohibitions - Any Pollutant, including oxygen-demanding pollutants (BOD, etc.) released in a discharge at a flow rate and/or pollutant concentration which, either singly or by interaction with other pollutants, will cause Interference with the POTW. a. Petroleum Oil, Nonbiodegradable Cutting Oil, or product of mineral oil origin in amounts that will cause interference or pass through. b. Trucked or Hauled Pollutants, except at discharge points designated by the Authority in accordance with Section C of this ordinance. C. PROHIBITED SEWER CONNECTIONS, INCLUDING TRUCKED OR HAULED WASTEWATER It shall be unlawful for any person to deposit or discharge into the sanitary sewer any liquid or solid waste, including trucked or hauled wastes, unless such deposit or discharge has been approved by the Authority. Industrial Wastewater Ordinance No. 2706 Page 10 of 40 D. PROHIBITED WASTEWATER CONSTITUENTS No person shall contribute or cause to be discharged directly or indirectly, into any public sanitary sewer any of the following described substances, materials, water or waste: 1. Temperature - any liquid or vapor having a temperature higher than one hundred fifty degrees (150°) Fahrenheit (65° degrees Centigrade); 2. Solidifvinq Substance - any water or waste which contains wax, grease, oil, petroleum oil, nonbiodegradable cutting oil, products of mineral oil origin, plastic or other substance that will solidify or become discernibly viscous at temperatures between thirty-two degrees (32°) to one hundred fifty degrees (150°) Fahrenheit, thereby contributing to the clogging, plugging or otherwise restricting the flow of wastewater through the collection system; 3. Explosive - pollutants which create a fire or explosion hazard in the sewer system or POTW, including, but not limited to, waste streams with a closed cup flash point of less than 140° degrees Fahrenheit or 60° degrees Centigrade using the test methods specified in 40 CFR Part 261.21. This includes flammable or explosive liquids, solids or gases such as gasoline, kerosene, benzene, naphtha, etc., which by reason of their chemical properties or quantity may be sufficient, either alone or by interaction, to cause fire or explosion. 4. Obstruction - solid or viscous substances in quantities capable of causing obstruction in the flow in sewers or other interference with proper operation of the POTW, such as, but not limited to, ashes, cinders, asphalt, concrete, cement, sand, mud, straw, shavings, metal, glass, rags, feathers, tar, plastics, wood, whole blood, paunch manure, hair and fleshings, entrails, lime slurry, lime residues, slops, chemical residues, paint residues, or bulk solids; 5. Garbaqe - any garbage that has not been properly comminuted or shredded to such a degree that all particles will be carried freely under the flow conditions normally prevailing in public sewers, with no particle greater than one-half (1/2) inch in any dimension; 6. Gases - any noxious or malodorous liquids, gases, solids, or other wastewater which, either singly or by interaction with other wastes, are sufficient to create a public nuisance or a hazard to life, or to prevent entry into the sewers for maintenance and repair; 7. Sludge - any substance which may cause the POTWs effluent or treatment residues, sludges, or scums, to be unsuitable for reclamation and reuse or to interfere with the reclamation process as determined pursuant to criteria in this ordinance. In no case, shall a substance discharged to the POTW cause the POTW to be in noncompliance with Industrial Wastewater Ordinance No. 2706 Page 11 0(40 sludge use or disposal criteria, guidelines or regulations developed under Section 405 of the Act or any criteria, guidelines or regulations affecting sludge use or disposal developed pursuant to the Solid Waste Disposal Act, the Resource Conservation and Recovery Act, the Clean Air Act, the Toxic Substances Control Act, or state standards applicable to the sludge management method being used; 8. NPDES - any substance which will cause the POTW to violate its NPDES or other disposal system permits, or the receiving stream water quality standards; 9. Objectionable Color - any substance with objectionable color which cannot be removed by the treatment process, such as, but not limited to, dye wastes and vegetable tanning solutions; 10. Slug load - any dump or slugload; 11. Hazard to human life - any wastewater which causes a hazard to human life or creates a public nuisance; 12. Toxicity Test - Wastewater causing, alone or in conjunction with other sources, the treatment plant's effluent to fail a toxicity test; Total Toxic Organics in excess of 2.13 mg/L collected as a grab sample; 13. Swimminq Pool - Swimming pool drainage from private residential pools may not be discharged to the sanitary sewer system. Swimming pool drainage from public and semi-public swimming pools may be discharged to the POTW with the prior consent of the Authority. Swimming pool filter backwash may be discharged to the POTW; 14. Detergents - Detergents, surface-active agents, or other substances which may cause excessive foaming in the POTW 15. Medical Waste - Medical wastes, except as specifically authorized by the Authority in a wastewater discharge permit; 16. Pollutants - Pollutants which result in the presence of toxic gases, vapors, or fumes within the POTW in a quantity that may cause acute worker health and safety problems. E. WASTEWATER LIMITATIONS No person shall contribute or cause to be discharged, directly or indirectly, into any sanitary sewer any wastewaters containing or having: 1. Fats. oils. and greases - free or emulsified fats, oils, and greases exceeding 200 mg/L as determined by approved EPA method listed in 40CFR Part 136. A concentration of 200 mg/L is allowable providing the Authority has specifically determined that the waste: a) derives from animal or vegetable materials; b) biodegrades readily in the POTW; c) Industrial Wastewater Ordinance No. 2706 Page 12 of 40 does not cause an obstruction of flow in the sewer line; and d) the discharge is pretreated by discharge through an approved grease trap or other pretreatment process. 2. Acids or alkalies - acids or alkalies capable of causing damage to sewage disposal structures or personnel or having a pH value lower than 5.5 or higher than 11.0. 3. Metals - metals in the form of compounds or elements with total concentrations exceeding the following: MAXIMUM DAILY AVERAGE (mg/L) 0.1 0.3 5.0 3.0 Arsenic Cadmium Chromium Copper Cyanide Lead Mercury Molybdenum Nickel Selenium Silver Zinc Total Toxic Organics 2.9 0.01 2.0 0.1 5.0 MAXIMUM GRAB (mq/L) 0.2 0.1 2.9 2.3 0.5 0.9 0.0004 0.2 4.6 0.1 0.3 8.0 2.13 4. Cyanide - cyanide or cyanogen compounds (expressed as total Cñ) in excess of 0.5 mg/L. 5. Gases - hydrogen sulfide, sulfur dioxide or nitrous oxide in excess of 10 parts per million. 6. Radioactive - radioactive wastes or isotopes with a half-life or concentration exceeding limits established by the Authority in compliance with applicable state or federal regulations. 7. Toxics - toxic pollutants in sufficient quantity, either singly or by interaction with other wastes, to injure or interfere with any wastewater treatment process, constitute a hazard to humans or animals, or to pass through the treatment plant and impair aquatic life in receiving water, as expressed by the results of acute or chronic toxicity tests of the POTW effluent. 8. Temperature - a temperature which inhibits or interferes with biological activity in the POTW treatment plant. In no case shall wastewater be introduced which would have a temperature exceeding 40°C (104°F) upon entering the POTW treatment plant. Industrial Wastewater Ordinance No. 2706 Page 130'40 9. Categorical - pollutants in excess of the limitations established in an applicable categorical pretreatment standard set forth in Title 40 of the Code of Federal Regulations. 10. Explosive - wastewaters which emanate vapors causing the atmosphere in the sewer system to exceed 20% of the lower explosive limit in the immediate area of the discharge. F. ACCIDENTAL DISCHARGE/SLUG CONTROL PLANS At least once every two (2) years, the Authority shall evaluate whether each significant industrial user needs accidental discharge/slug control plan. The Authority may require any user to develop, submit for approval, and implement such a plan. Alternatively, the Authority may develop such a plan for any user. An accidental discharge/slug control plan shall address, at a minimum, the following: 1. Description of discharge practices, including non routine batch discharges; 2. Description of stored chemicals; 3. Procedures for immediately notifying the Authority of any accidental or slug discharge, as required by Section 6.6 of this ordinance; and 4. Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvents, and/or measures and equipment for emergency response. SECTION IV -SPECIAL RULES RELATING TO INDUSTRIAL DISCHARGERS A. COMPLIANCE WITH STANDARDS 1. Applicable Laws - All dischargers shall be subject to those Federal, State and local requirements and limitations which are the most stringent. 2. Dilution - No discharger shall increase the use of potable or process water in any way for the purpose of diluting a discharge as a partial or complete substitute for adequate treatment to achieve compliance with the standards set forth in this ordinance. 3. Mass Limitations - Where deemed appropriate the Authority may apply mass limitations expressed in pounds per day of pollutant discharged. Categorical Pretreatment Standards and the City's right to impose mass or concentration limits, the City's right to use combined waste stream Industrial Wastewater Ordinance No. 2706 Page 14 of 40 formula as appropriate, the right of a user to obtain a variance, and the right of a user to obtain a net gross adjustment. a. Where a categorical pretreatment standard is expressed only in terms of either the mass or the concentration of a pollutant in wastewater, the Authority may impose equivalent concentration or mass limits in accordance with 40 CFR 403.6(c). b. When wastewater subject to a categorical pretreatment standard is mixed with wastewater not regulated by the same standard, [the Superintendent] shall impose an alternate limit using the combined waste stream formula in 40 CFR 403.6(e). C. A user may obtain a variance from a categorical pretreatment standard if the user can prove, pursuant to the procedural and substantive provisions in 40 CFR 403.13, that factors relating to its discharge are fundamentally different from the factors considered by EPA when developing the categorical pretreatment standard. d. A user may obtain a net gross adjustment to a categorical standard in accordance with 40 CFR 403.25. B. ACCIDENTAL DISCHARGES Each discharger shall provide protection from accidental discharge of prohibited or regulated materials or substances established by this ordinance. Where necessary, facilities to prevent accidental discharge of prohibited materials shall be provided and maintained at the discharger's cost and expense. When applicable, detailed plans showing facilities and operating procedures to provide this protection shall be submitted to the Authority for review, and shall be approved by the Authority before construction of the facility. Review and approval of such plans and operating procedures by the Authority shall not relieve the discharger from the responsibility to modify its facility as necessary to meet the requirements of this ordinance. Dischargers shall notify the Authority immediately upon the occurrence of a "slug" or accidental discharge of substances prohibited by this ordinance. The notification shall include location of discharge, date and time thereof, type of waste, concentration and volume, corrective actions taken, and be signed by the dischargers Authorized Representative. Any discharger discharging slugs of prohibited materials shall be liable for any expense, loss or damage to the wastewater system and the POTW, in addition to the amount of any fines imposed on the Authority under state or federal law. Each employer shall instruct all applicable employees, who may cause or discover such a discharge, with respect to emergency notification procedure including the proper telephone number of the Authority to be notified. Industrial Wastewater Ordinance No. 2706 Page 15 of 40 C. WASTEWATER DISCHARGES INTO PRIVATE SEWER SYSTEMS All dischargers who discharge wastewater into a private sewer system shall comply with this ordinance including Section V; provided, however, that flow measurement may be based on metered water consumption. Each discharger shall provide an agreement, signed by the owner of the sewer system, which authorizes the Authority's personnel to enter onto the owner's property for purposes of inspection and monitoring of discharger's premises, and for enforcement pursuant to the term of this ordinance. D. PROHIBITION OF BYPASS 1. Bypass of a discharger's treatment equipment or treatment facility is prohibited and the Authority may take enforcement action against the discharger unless: a. The bypass was unavoidable to prevent loss of life, personal injury, or severe property damage, and; b. There were no feasible alternatives to the bypass, such as use of auxiliary treatment facilities, retention of untreated wastewater, or maintenance during normal periods of downtime. This condition is not satisfied if, in the exercise of reasonable engineering judgment, adequate back-up equipment should have been installed to prevent a bypass which occurred during normal periods of equipment downtime or maintenance, and; c. The discharger submitted advanced, written notice of the need for a bypass. 2. The discharger shall submit oral notice to the Authority of an unanticipated bypass that exceeds categorical standards or other discharge limits within 24 hours of the time the discharger becomes aware of the bypass. Written notice shall be provided within 5 days of the time the discharger becomes aware of the bypass. The written notice shall include a description of the bypass and its causes, duration of the bypass, steps taken to prevent the reoccurrence of the bypass, and must be signed by the Authorized Representative of the discharger. 3. The Authority may approve an anticipated bypass, after considering its adverse effects, if it determines that the bypass will meet all of the conditions of paragraph 1) above. E. NOTIFICATION OF HAZARDOUS WASTE DISCHARGES All dischargers shall notify the Authority, the Control Authority, the EPA's Regional Waste Management Division Director, and the Texas Commission on Environmental Quality in writing of any discharge into a wastewater system or Industrial Wastewater Ordinance No. 2706 Page 16 of 40 POTW of any substance, which, if otherwise disposed of, would be a hazardous waste under 40 CFR Part 261. Any notification under this paragraph must be submitted in conformance with 40 CFR Part 403.12 (p). SECTION V - ADMINISTRATION BY PERMIT A. CLASSIFICATION OF DISCHARGERS AND PERMITS 1. All non-domestic users which discharge into the sanitary sewer system of the Authority shall be grouped according to the following definitions: Group I - Significant Industrial Users are defined in Section I Definitions. Group II - Commercial Facilities and Small Industrial Users are those commercial facilities and industrial users which are not included in Group I and which do not discharge a significant amount of regulated pollutants on a regular basis. Examples include automotive service shops, small food processors and photographic developing shops. Group III - Classed High Strength Users are restaurants, car washes or other businesses which can be classed according to an average strength or abnormal strength of their wastewater. Group IV - Wastewater Haulers are transporters of wastewater desiring to discharge into the Authority's sanitary sewage system. 2. All Group I dischargers shall submit a Wastewater Discharge Permit Application to the Authority on a form provided by the Authority. a. All information required by Section V(C). b. Description of activities, facilities, and plant processes on the premises, including a list of all raw materials and chemical used or stored at the facility which are, or could accidentally or intentionally be, discharged into the POTW; c. Number and type of employee, hours of operation, and proposed or actual hours of operation; d. Each product produced by type, amount, process or processes, and rate of production; e. Type and amount of raw materials processed (average and maximum per day); Industrial Wastewater Ordinance No. 2706 Page 17 of 40 f. Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge; g. Time and duration of discharge; and h. Any other information as may be deemed necessary by the Authority to evaluate the wastewater discharge permit application. All Group II, III and IV dischargers shall submit an Industrial Waste Questionnaire. The questionnaire will be reviewed by the Public Works Utility Superintendent or authorized representative. If deemed necessary, Group II, III or IV dischargers may also be required to obtain a Permit as outlined herein. 3. No new Group I user shall be allowed to discharge until issued a valid permit. 4. The Authority will evaluate the completed applications and data furnished by the discharger and may require additional information. If, after evaluation, the application is deemed satisfactory, then a wastewater discharge permit shall be issued within 60 days after the evaluation is complete. The wastewater discharge permit shall be subject to the terms and conditions specified herein and to the regulations of the Authority. 5. If the application is denied, the applicant shall be notified in writing within 30 days of the reasons for such denial. If denial is based on the Authority's determination that the applicant cannot meet the wastewater discharge limitations of this ordinance, the Authority may specify that the applicant be required to provide pretreatment of the waste before it is deemed acceptable for sewer discharge. 6. Where additional pretreatment and/or operation and maintenance activities will be required to comply with this ordinance, pursuant to 5) above, the discharger shall provide a declaration of the shortest schedule by which the discharger will provide such additional pretreatment and/or implement added operational and maintenance activities. a. The schedule shall contain milestone dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the discharger to comply with the requirements of this ordinance including, but not limited to dates, relating to hiring an engineer, completing preliminary plans, completing final plans, executing contract(s) for major components, commencing construction, completing construction, and all other acts necessary to achieve compliance with this ordinance. b. The time increments established between milestone dates shall be the shortest practicable for the completion of the required work. Industrial Wastewater Ordinance No. 2706 Page 18 of 40 Under no circumstances shall the Authority permit a time increment for a single step in the compliance schedule to exceed 9 months. The completion date in this schedule shall not be later than the compliance date established for applicable categorical pretreatment standards. c. Not later than 14 days following each milestone date in the schedule and the final date for compliance, the discharger shall submit a progress report to the Authority, including a statement as to whether or not it complied with the increment of progress represented by that milestone date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the discharger to return the construction to the approved schedule. In no event shall more than 9 months elapse between such progress reports to the Authority. 7. Prior to the approval of a permit, unless exempted by the Authority, all dischargers shall provide monitoring facilities to allow inspection, sampling and/or flow measurement of wastewaters before entering the sanitary sewer of the Authority. Each monitoring facility shall be located on the discharger's premises; provided, however, where such location would be impractical or cause undue hardship to the discharger, the Authority may approve the placement of monitoring facilities in the public street or sidewalk area. All monitoring equipment and facilities shall be maintained in a safe and proper operating condition at the expense of the discharger. Failure to provide proper monitoring facilities shall be grounds for denial of a permit. B. PERMIT CONDITIONS Permits are issued to a specific discharger for specific operation and are not assignable to another discharger or transferable to any other location without the prior written approval of the Authority. 1. Wastewater Discharge Permit Transfer may be transferred to a new owner or operator only if the permittee gives at least Ninety (90) days advance notice to the Authority and the Authority approves the wastewater discharge permit transfer. The notice to the Authority must include a written certification by the new owner or operator which: a. States that the new owner and/or operator has no immediate intent to change the facility's operations and process; b. Identifies the specific date on which the transfer is to occur; and c. Acknowledges full responsibility for complying with the existing wastewater discharge permit. Failure to provide advance notice of a transfer renders the wastewater discharge permit void as the date of facility transfer. Industrial Wastewater Ordinance No. 2706 Page 190'40 2. Wastewater Discharge Permit Requirements: a. A statement that indicates wastewater discharge permit duration, which in no event shall exceed five (5) years; b. A statement that the wastewater discharge permit is nontransferable without prior notification to the City in accordance with Section B(1) of this ordinance, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit; c. Effluent limits based on applicable general pretreatment standards as set forth in CFR 403, categorical pretreatment standards, local limits, and state and local law; d. Self monitoring, sampling, reporting, notification, and record- keeping requirements. These requirements shall include and identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on Federal, State, and local law; and e. Violation of pretreatment standards and requirements or of any applicable compliance schedule shall be punishable by a fine of up to $2000 per day and by civil penalties of up to $5000 per day. Such schedule may not extend the time for compliance beyond that required by Federal, State, and local law. 3. Wastewater discharge permits may contain, but need not limited to, the following conditions: a. Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; b. Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; c. Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or non routine discharges; d. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW, the unit charge or schedule of user charges and fees for the management of the wastewater discharge to the POTW; e. The unit charge of schedule of user charges and fees for Industrial Wastewater Ordinance No. 2706 Page 20 of 40 management of the wastewater discharge to the POTW; f. Requirements for installation and maintenance of inspection and sampling facilities and equipment; g. A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable Federal and State pretreatment standards, including those which become effective during the term of the wastewater discharge permit; and h. Other conditions as deemed appropriate by the Authority to ensure compliance with this ordinance, and State and Federal laws, rules, and regulations. C. REPORTING REQUIREMENTS FOR DISCHARGERS 1. Baseline Report: Within 180 days following the effective date for new or revised categorical pretreatment standards, or at least 90 days prior to commencement of the introduction of wastewater into the POTW by a new discharger, any discharger subject to a categorical pretreatment standard shall submit to the Authority a report (in a form provided by the Authority), indicating the nature and concentration of all prohibited or regulated substances contained in its discharge, and the average and maximum daily flow in gallons. The report shall state whether the applicable categorical pretreatment standards are being met on a consistent basis and, if not, what add itional 0 & M or pretreatment is necessary to bring the discharger into compliance with the applicable categorical pretreatment standards. This report shall be signed by an authorized representative and certified by a qualified professional as stated in 40 CFR Part 403.12(b)(6). a. Identifying Information. The name and address of the facility, including the name of the operator and owner. b. Environmental Permits. A list of any environmental control permits held by or for the facility. c. Description of Operations. A brief description of nature, average rate of production, standard industrial classifications of the operation(s) carried out by such user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes. d. Flow Measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined waste stream formula set out in 40 CFR 403.6(e). Industrial Wastewater Ordinance No. 2706 Page 21 of 40 e. Measurement of Pollutants (i) The categorical pretreatment standards applicable to each regulated process. (ii) The result of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the Authority, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in Section V of this ordinance. (iii) Sampling must be performed in accordance with procedures set out in Section V(C)(4). f. Certification. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. g. Compliance Schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in Section VI of this ordinance. h. Siqnature and Certification. All baseline monitoring reports must be signed and certified in accordance with Section C(1) of this ordinance. 2. 90 Day Compliance Report: Within 90 days following the date for final compliance by the discharger with applicable categorical pretreatment standards or 90 days following commencement of the introduction of wastewater into the POTW by a new discharger, any discharger subject to categorical pretreatment standards shall submit to the Authority a report indicating the nature and concentration of all prohibited or regulated substances contained in its discharge, and the average and maximum daily flow in gallons. The report shall state whether the applicable categorical pretreatment standards or requirements are being met on a consistent basis and, if not, what additional 0 & M or pretreatment is necessary to bring the discharger into compliance with the applicable Industrial Wastewater Ordinance No. 2706 Page 22 of 40 categorical pretreatment standards or requirements. This report shall be signed by an authorized representative of the discharger. 3. Periodic Compliance Reports: Any discharger subject to a categorical pretreatment standard made a part of this ordinance shall submit to the Authority a report indicating the nature and concentration of prohibited or regulated substances in the effluent which are limited by the categorical pretreatment standards hereof. Reports are required after the compliance date of such a pretreatment standard, or in the case of a new discharger, after commencement of the discharge, and are to be submitted at least once every six months (on dates specified by the Authority). In addition, where applicable, this report shall include a record of all measured or estimated average and maximum daily flows which, during the reporting period, exceeded the average daily flow specified in Section V, paragraph B, 1) and 2) hereof. Flows shall be reported on the basis of actual measurement, provided however, where cost or feasibility considerations justify, the Authority may accept reports of average and maximum flows estimated by verifiable techniques. The Authority, taking into consideration extenuating factors, may authorize the submission of said reports on months other than those specified above. 4. Analysis and Sampling Procedures: All analyses shall be performed in accordance with procedures contained in 40 CFR Part 136 and amendments thereto or with any other test procedures approved by the Administrator. Sampling shall be performed in accordance with the techniques approved by EPA. Where 40 CFR Part 136 does not include sampling or analytical techniques for the pollutants in question, or where EPA determines that the Part 136 techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed using validated analytical methods or any other sampling and analytical procedures, including procedures suggested by the POTW or other parties, approved by EPA. Sample Collection: a. Except as indicated in Section B, below, the user must collect wastewater samples using flow proportional composite collection techniques. In the event flow proportional sampling is infeasible, the Authority may authorize the use of time proportional sampling or a minimum of four (4) grab samples where the user demonstrates that this will provide a representative sample of the effluent being discharged. In addition, grab samples may be required to show compliance with instantaneous discharge limits. b. Samples for oil and grease, temperature, pH, cyanide, phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. 5. Reporting Additional Monitoring: If an industrial user subject to the reporting requirements of this section monitors any pollutant more Industrial Wastewater Ordinance No. 2706 Page 23 of 40 frequently than required by the Authority, using the procedures prescribed in paragraph (4) of this section, the results of this monitoring shall be included in the report. 6. Significant Noncategoricallndustrial User Reporting: Significant noncategorical industrial users shall submit to the Authority at least once every six months (on dates as specified by the Authority) a description of the nature, concentration, and flow of the pollutants required to be reported by the Authority. These reports shall be based on sampling and analysis performed in the period covered by the report, and performed in accordance with the techniques described in paragraph (4) of this section. This sampling and analysis may be performed by the Authority in lieu of the significant noncategorical industrial user. 7. Notification of Changed Discharge: Dischargers shall give prior written notification to the Authority of any significant change in the volume or character of pollutants in the discharge. a. The notification to the Authority shall be received at least ninety (90) days prior to change. b. The Authority may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application. c. The Authority may issue a wastewater discharge permit or modify an existing wastewater discharge permit in response to changed conditions or anticipated changed conditions. d. For purposes of this requirement, significant changes include, but are not limited to, flow increases or decreases of twenty percent (20%) or greater, the discharge of any previously unreported pollutants, and the deletion of any pollutant regulated by this Article or a permit issued pursuant to this Article. 8. Authority Monitoring: Sampling and analysis for the reports required by paragraphs (1), (2), (3) and 6) above may be performed by the Authority in lieu of the discharger. If all information required for the report, including flow data, is collected by the Authority, the discharger will be required to submit the report or certifications. 9. Signatory Requirements: All applications and compliance reports submitted to the Authority must contain the following certification statement and be signed by the Authorized Representative: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Industrial Wastewater Ordinance No. 2706 Page 24 of 40 Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information and for not reporting known violations, including possibility of fine and imprisonment." 10. Wastewater Analysis: When requested by the Authority, a user must submit information on the nature and characteristics of its wastewater within Thirty (30) days of the request. The Authority is authorized to prepare a form for this purpose and may periodically require users to update this information. D. INSPECTION AND FLOW MEASUREMENT 1. Inspection: The Authority may inspect the facilities of any discharger to determine compliance with the requirements of this ordinance. The discharger shall allow the Authority or its representatives to enter upon the premises of the discharger at all reasonable hours for the purposes of inspection, sampling, or examination of records. All reports and records related to the provisions of this ordinance shall be made available for copying and inspection by the Authority. The Authority shall have the right to set upon the discharger's property such devices as are necessary to conduct sampling, inspection, compliance monitoring and metering or measuring operations. The inspectors, agents or representatives of the Authority charged with the enforcement of this section shall be deemed to be performing a governmental function for the benefit and health and welfare of the general public and neither the Authority nor any individual inspector, agent or representative shall be held liable for any loss or damage, whether real or asserted, caused or alleged to have been caused as a result of the performance of such governmental function. The failure or refusal of such owner or discharger to comply with this provision shall be grounds for the disconnection of water or sewer service to the facility. Facilities regulated under this chapter are subject to the authority of the U.S. Environmental Protection Agency (EPA) under Section 308 of the Federal Clean Water Act (33 U.S.C. § 3318), as amended, concerning access to information and right of entry onto property for purposes of implementing and enforcing the federal pretreatment program and other applicable provisions of the Federal Clean Water Act. Facilities regulated under this chapter are subject to the authority of the Texas Commission on Environmental Quality (TCEQ) under Sections 26.014 and 26.015 of the Texas Water Code, as amended, and Sections 361.032 and 361.037 of the Texas Health and Safety Code, as amended, concerning access to information and right of entry onto property for purposes of implementing and enforcing the State of Texas' pretreatment Industrial Wastewater Ordinance No. 2706 Page 25 of 40 program and other applicable provisions of the Texas Water Code and Texas Health Safety Code. The industrial waste discharged or deposited into the sanitary sewers shall be subject to periodic inspection and sampling as often as may be deemed necessary by the Authority. Samples shall be collected in such manner as to be representative of the character and concentration the waste under operational conditions. The laboratory methods used in the examination of said waste shall be those set forth in 40 CFR Part 136. The determination of the character and concentration of industrial waste shall be made at such times and on such schedules as may be established by the Authority. Should a discharger desire a determination of the quality of such industrial waste be made at some time other than that scheduled by the Authority, such special determination may be made by the Authority at the expense of the owner or discharger. Inspection and sampling of IUs by City at least once a year: Randomly sample and analyze the effluent from industrial users and conduct surveillance activities in order to identify, independent of information supplied by industrial users, occasional and continuing noncompliance with pretreatment standards. Inspect and sample the effluent from each Significant Industrial User at least once a year. Evaluate, at least once every two years, whether each such Significant Industrial User needs a plan to control slug discharges. For purposes of this subsection, a slug discharge is any discharge of a non-routine, episode nature, including but not limited to an accidental spill or a non-customary batch discharge. The result of such activities shall be available to the Approval Authority upon request. If the POTW decides that a slug control plan is needed, the plan shall contain, at a minimum, the following elements: a. Description of discharge practices, including non-routine batch discharges. b. Description of stored chemicals. c. Procedures for immediately notifying the POTW of slug discharges, including any discharge that would violate a prohibition under 40 CFR 403.5(b), with procedures for follow-up written notification within five days. d. If necessary, procedures to prevent adverse impact from accidental spills, including inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site run-off, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and/or measures and equipment for emergency response. NOV/Repeat Sampling and Reporting: If sampling performed by an Industrial User indicates a violation, the user shall notify the Control Industrial Wastewater Ordinance No. 2706 Page 26 of 40 Authority within 24 hours of becoming aware of the violation. The User shall also repeat the sampling and analysis and submit the results of the repeat analysis to the Control Authority within 30 days after becoming aware of the violation, except the Industrial User is not required to resample if: a. The Control Authority performs sampling at the Industrial User at a frequency of at least once per month, or b. The Control Authority performs sampling at the User between the time when the User performs its initial sampling and the time when the User receives the results of this sampling. 2. Measurement of Flow: The volume of flow used in computing sewage charges shall be based upon metered water consumption or discharge as shown in the records of meter readings maintained by the North Richland Hills Water Department. Where it can be shown to the satisfaction of the Director that a substantial portion of the metered water does not enter the sanitary sewer, the Director may require or permit the installation of additional approved meters at the owner's expense, to measure the quantity of water actually entering the sewer system. If approved by the Director, the measured quantity of water actually entering the sewer system will be used to determine the sewer service charge. Any discharger who procures all or part of its water supply from sources other than the North Richland Hills Water Department, all or part of which is subsequently discharged into the sanitary sewer, shall install and maintain at its expense an effluent meter or flow measuring device approved by the Director for the purpose of determining the proper volume of flow to be used in computing sewer service charges. Such meters or measuring devices shall be read monthly. If the Director determines that it is not practicable to measure the quantity or quality of waste by the aforesaid meters or monitoring devices, the quantity or quality of the waste shall be determined in any manner or method the Director may find practicable in order to arrive at the percentage of water entering the sanitary sewage system of the Authority and/or the quality of the sewage to be used to determine the sewer service charge. E. PERMIT MODIFICATIONS 1. The Authority reserves the right to amend any permit issued hereunder in order to assure compliance by the Authority with applicable laws and regulations. The Authority may amend any permit for good cause including, but not limited to the following: Industrial Wastewater Ordinance No. 2706 Page 27 of 40 a. To incorporate any new or revised federal, state, or local pretreatment standards or requirements. b. Material or substantial alterations or additions to the discharger's operation processes, or discharge volume or character which were not considered in drafting the effective permit. c. A change in any condition in either the industrial user or the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge. d. Information indicating that the permitted discharge poses a threat to the Authority's collection and treatment systems, POTW personnel or the receiving waters. e. Violation of any terms or conditions of the permit. f. Misrepresentation or failure to disclose fully all relevant facts in the permit application or in any required reporting. g. To correct typographical or other errors in the permit. h. To reflect transfer of the facility ownership and/or operation to a new owner/operator. I. Upon request of the permittee, provided such request does not create a violation of any applicable requirements, standards, laws, or rules and regulations. 2. All categorical pretreatment standards promulgated and adopted by the EPA after the effective date of this ordinance shall automatically become a part of this ordinance. Where a discharger, subject to a categorical pretreatment standard, has not previously submitted an application for a permit as required by Section V, paragraph A, 2) above, the discharger shall apply for a permit from the Authority within 180 days after the promulgation of the applicable categorical pretreatment standard by the EPA. In addition, the discharger with an existing permit shall submit to the Authority within 180 days after promulgation of an applicable categorical pretreatment standard, the information required by Section V, paragraph C, 1) above. The discharger shall be informed of any proposed changes in its permit at least 30 days prior to the effective date of change. Any changes or new conditions in the permit shall include a reasonable time schedule for compliance. F. CONFIDENTIAL INFORMATION 1. All information and data submitted by a discharger to the Authority or POTW may be submitted to any State or Federal agency governing the POTW. Such information shall be considered subject to public disclosure, provided, however, that the discharger may request that information not Industrial Wastewater Ordinance No. 2706 Page 28 of 40 be subject to public disclosure, in accordance with 40 CFR Part 2 as follows: a. A discharger may assert a business confidentiality claim covering part or all of the information in a manner described below, and that information covered by such a claim will be disclosed only by means of the procedures set forth below. b. If no claim of business confidentiality is asserted, all information will be subject to public disclosure without further notice to the discharger. 2. Method and time of asserting business confidentiality claim: A discharger which is submitting information to the Authority may assert a business confidentiality claim covering the information by placing on or attaching to the information, at the time it is submitted to the Authority, a cover sheet, stamped or typed legend, or other suitable form of notice employing language such as "trade secret," "proprietary," or "company confidential." Allegedly confidential portions of otherwise nonconfidential documents should be clearly identified by the discharger, and may be submitted separately to facilitate identification and handling by the Authority. If the discharger desires confidential treatment only until a certain date or until the occurrence of a certain event, the notice should so state. 3. Nothing in this section shall prevent the disclosure of information and data regarding the nature and content of a discharger's effluent, and the frequency of discharge, or a standard or limitation to be met by the discharger, and this information shall be available to the public with no restrictions. Effluent data which cannot be held as confidential is as defined in 40 CFR 2.302. 4. The provisions of this section shall be subject to any public disclosure requirements which may exist under Article 6252-17a, V.A.C.S. G. WASTEWATER DISCHARGE PERMIT REISSUANCE A user with an expiring wastewater discharge permit shall apply for wastewater discharge permit re-issuance by submitting a complete permit application, in accordance with Section V(A)(2) of this ordinance, a minimum of Ninety (90) days prior to the expiration of the user's existing wastewater discharge permit. SECTION VI - ENFORCEMENT A. REVOCATION OF PERMIT The Authority may revoke the permit or terminate water or sewer service of any discharger which fails to: Industrial Wastewater Ordinance No. 2706 Page 29 of 40 1 . factually report the wastewater constituents and characteristics of its discharge; or 2. report significant changes in wastewater constituents or characteristics; or 3. allow reasonable access to the discharger's premises by representatives of the Authority for the purpose of inspection or monitoring; or 4. pay sewer charges; or 5. meet compliance schedules; or 6. fulfill the conditions of its permit, or this ordinance, or to obey any final judicial order with respect thereto. B. NOTIFICATION OF VIOLATION Whenever the Authority finds that any discharger has engaged in conduct which justifies revocation of a permit, pursuant to Section VI, A. hereof, the Authority shall serve or cause to be served upon such discharger a written notice, either by personal delivery or by certified or registered mail, return receipt requested, stating the nature of the alleged violation. Within 30 days of the date of receipt of the notice, the discharger shall respond in person or in writing to the Authority, advising of its position with respect to the allegations. Thereafter, the parties shall meet to ascertain the veracity of the allegations and where necessary, establish a plan for the satisfactory correction thereof. C. ADMINISTRATIVE ORDERS Where the violation of Section VI,A. hereof is not corrected by means of enforcement action listed in Section VI, B, the following enforcement escalations may be used. Terms mayor may not be negotiated with industrial users. Generally used as first form response to a significant noncompliance, unless more severe action is justified. 1. Consent Order - An agreement between the Authority and the industrial user normally containing three elements: (1) compliance schedules (2) stipulated fines or remedial actions; and (3) signatures of City and industrial representatives. 2. Show Cause Order - An order which directs the user to appear before the City to explain its noncompliance and show cause why more severe enforcement actions against the user should not be levied. Typically used after informal contacts or NOV's have failed to resolve noncompliance; however, it can be used at anytime. 3. Compliance Order - An order which directs the industrial user to achieve or restore compliance by a date specified in the order. Terms need not be Industrial Wastewater Ordinance No. 2706 Page 30 of 40 discussed with the industry in advance. Typically used when noncompliance cannot be resolved without construction, repair, or process changes, or to require development of management practices, spill prevention programs, and other pretreatment program requirements. 4. Cease and Desist Order - An order which directs the noncompliant user to cease illegal or unauthorized discharges immediately, or to terminate the discharge altogether. Generally used in situations where the discharge could cause interference or pass through, or otherwise create an emergency situation. D. RIGHT OF APPEAL OF ADMINISTRATIVE RULING Any discharger or any interested party shall have the right to request in writing an interpretation or ruling by the Authority on any matter covered by the ordinance and shall be entitled to a prompt written reply. In the event that such inquiry is by a discharger and deals with matters of performance or compliance with this ordinance or deals with a permit issued pursuant hereto for which enforcement activity relating to an alleged violation is the subject, receipt of a discharger's request shall stay all enforcement proceedings pending receipt of the aforesaid written reply; provided, however, the Authority may take any action it deems necessary to protect its wastewater collection and treatment system or to comply with its NPDES permit or to comply with any contract the Authority has for the treatment of wastewater. E. JUDICIAL PROCEEDINGS The Authority, with respect to the conduct of any discharger contrary to the provisions of this ordinance may authorize its attorney to commence any legal action in a court of competent jurisdiction for equitable and/or legal relief. a. Injunction Relief: When the Authority finds that a user has violated, or continues to violate, any provision of this ordinance, a wastewater discharge permit, or order issued hereunder, or any other pretreatment standard or requirement, the Authority may petition the [NAME OF COURT] through North Richland Hills Attorney for the issuance of a temporary or permanent injunction, as appropriate, which restrains or compels the specific performance of the wastewater discharge permit, order, or other requirement imposed by this ordinance on activities of the user. The Authority may also seek such other action as is appropriate for legal and/or equitable relief, including a requirement for the user to conduct environmental remediation. A petition for injunction relief shall not be a bar against, or a prerequisite for, taking any other action against a user. F. EMERGENCY SUSPENSION OF SERVICE & DISCHARGE PERMITS The Authority, may, for good cause shown, suspend water or wastewater service to the discharger's facility, when it appears to the Authority that an actual or threatened discharge presents or may present an imminent or substantial danger Industrial Wastewater Ordinance No. 2706 Page 31 of 40 to the health or welfare of persons, substantial danger to the environment, interfere with the operation of a POTW, violate any pretreatment limits imposed by this ordinance or any Permit issued pursuant to this ordinance. Any discharger notified of the suspension of the Authority's water or wastewater service and/or the discharger's permit, shall within a reasonable period of time, as determined by the Authority, cease all discharges. In the event of the failure of the discharger to comply voluntarily with the suspension order within the specified time, the Authority may commence judicial proceedings to compel the discharger's compliance with such order or may immediately disconnect such discharger's service line from the City water and sanitary sewer system. In the case of emergency disconnection of service, the Director shall make a reasonable attempt to notify the owner or discharger before disconnecting the service line. The party whose service has been disconnected shall have an opportunity for a hearing on the issue of the illegal discharge and the disconnection as soon as possible after such disconnection has taken place. The Authority may reinstate the permit and/or the wastewater or water service upon proof by the discharger of the cessation of the non-complying discharge or elimination of conditions creating the threat of imminent or substantial danger as set forth above. The water and/or wastewater service shall be reconnected at the discharger's expense. G. OPERATING UPSETS In an action brought in municipal or state court, if a person can establish that an event that would otherwise be a violation of this Article or a permit issued under this Article was caused solely by an act of God, war, strike, riot, or other catastrophe, the event is not a violation of this Article or the permit. In an enforcement proceeding, the user seeking to establish the occurrence of an act of God, war, strike, riot, or other catastrophe shall have the burden of proof. In the event that an act of God, war, strike, riot, or other catastrophe has been established the user shall control production of all discharges to the extent possible until such time as the reduction, loss, or failure of its treatment facility is restored or an alternative method of treatment is provided. Any discharger who experiences an upset in operations which places the discharger in a temporary state of non-compliance with this ordinance shall inform the Authority within 24 hours of first awareness of the commencement of the upset. Where such information is given orally, the Authority may at its discretion require the discharger to file a written report within five working days. The report shall specify: 1. Description of the upset, its cause and the upset's impact on a discharger's compliance status. 2. Duration of non-compliance, including exact dates and times of non-compliance, and if the non-compliance continues, the time by which compliance is reasonably expected to occur. Industrial Wastewater Ordinance No. 2706 Page 32 of 40 3. All steps taken or to be taken to reduce, eliminate and prevent recurrence of such an upset or other conditions of non-compliance. An operating upset which was not the result of negligence on the part of the discharger, and which has been documented and verified in the manner stated above shall be an affirmative defense to any enforcement action brought by the Authority against a discharger for any non-compliance with the ordinance which arises out of violations alleged to have occurred during the period of the upset. H. RECOVERY OF COSTS INCURRED BY THE AUTHORITY Any discharger who discharges or causes a discharge producing a deposit or obstruction, or causes damage to or impairs the Authority's wastewater system, shall be liable to the Authority for any expense, loss, or damage caused by such violation or discharge. The Authority shall bill the discharger for the costs incurred by the Authority for any cleaning, repair, or replacement work caused by the violation or discharge. Failure to pay such bill may result in the termination of water or wastewater service. I. FALSIFYING INFORMATION Any person who knowingly makes any false statement, representation or certification in any application, record, report, plan or other document filed or required to be maintained pursuant to this ordinance, or falsifies, tampers with, or knowingly renders inaccurate any monitoring device or method required under this section, shall, upon conviction, be punished as provided in Section XI of this Ordinance. J. POTW PRETREATMENT REQUIREMENTS Obtain remedies for noncompliance by any Industrial User with any Pretreatment Standard and Requirement. All POTWs shall be able to seek injunctive relief for noncompliance by Industrial Users with Pretreatment Standards and Requirements. All POTWs shall also have authority to seek or assess civil or criminal penalties in at least the amount of $2,000 per day and a civil penalty of up to $5,000 per day for each violation by Industrial Users of Pretreatment Standards and Requirements. POTWs whose approved Pretreatment Programs require modification to conform to the requirements of this paragraph shall submit a request for approval of a program modification in accordance with §403.18, unless the State would be required to enact or amend a statutory provision, in which case the POTW shall submit such a request. SECTION VII - MISCELLANEOUS A. NET/GROSS CALCULATIONS The Authority may elect to adjust categorical pretreatment standards to reflect the presence of pollutants in the discharger's intake water, in accordance with 40 CFR Part 403.15. Industrial Wastewater Ordinance No. 2706 Page 33 of 40 B. PRESERVATION OF RECORDS All dischargers subject to this ordinance shall retain and preserve for no less than three (3) years, any records, books, documents, memoranda, reports, correspondence and any and all summaries thereof, relating to monitoring, sampling and chemical analyses made by or on behalf of a discharger in connection with its discharge. All records which pertain to matters which are the subject of administrative adjustment or any other enforcement or litigation activities brought by the Authority pursuant hereto shall be retained and preserved by the discharger until all enforcement activities have concluded and all periods of limitation with respect to any and all appeals have expired. C. COSTS OF ADMINISTERING PROGRAM The Authority may make such charges, known as monitoring and pretreatment charges, as are reasonable for services rendered in administering the programs outlined in this ordinance. Such charges may include, but are not limited to: 1. permitting industrial facilities; 2. inspection; 3. sample analysis; 4. monitoring; and 5. enforcement. D. RIGHT OF REVISION The Authority reserves the right to amend this ordinance to provide for more or less stringent limitations or requirements on discharges to the sanitary sewer or POTW where deemed necessary to comply with the objectives set forth in Section II of this ordinance. E. PUBLICATION OF LIST OF SIGNIFICANT VIOLATORS The Authority shall annually publish in the largest local daily newspaper a list of users that have significantly violated federal pretreatment requirements during the previous 12 months. Definition of significant violation shall be the definitions listed in 40 CFR Part 403.8 (f) (2) (vii), and in the POTWs NPDES permit. SECTION VIII - CUMULATIVE CLAUSE That this Ordinance shall repeal every prior Ordinance and provision of the North Richland Hills City Code in conflict herewith but only insofar as any portion of such prior Ordinance or provision shall be in conflict, and as to all other Ordinances or provisions of the North Richland Hills City Code not in direct conflict herewith, this Ordinance shall be and is hereby made cumulative. Ordinance numbers 1773 and 2687 are hereby repealed. Industrial Wastewater Ordinance No. 2706 Page 34 of 40 SECTION IX - REMEDIES That all rights or remedies of the City of North Richland Hills, Texas, are expressly saved as to any and all violations of the North Richland Hills City Code, as amended, which have accrued at the time of the effective date of this Ordinance; and as to such accrued violations, the Court shall have all of the powers that existed prior to the effective date of this Ordinance. SECTION X - SEVERABILITY CLAUSE It is hereby declared to be the intention of the City Council that the sections, paragraphs, sentences, clauses and phrases of this Ordinance are severable, and if any phrase, clause, sentence, paragraph or section of this Ordinance shall be declared unconstitutional by the valid judgment or decree of any court of competent jurisdiction, such unconstitutionality shall not affect any of the remaining phrases, clauses, sentences, paragraphs and sections of this Ordinance, since the same would have been enacted by the City Council without the incorporation in this Ordinance of any such unconstitutional phrase, clause, sentence, paragraph or section. SECTION XI - FINES That the violation of any provision of this Ordinance or of the North Richland Hills City Code relating to sewer service shall be deemed an offense is punishable by a fine not exceeding Two Thousand Dollars ($2,000) for each violation per day. Civil penalties of up to $5,000 per day, may be assessed for any violation relating to point source effluent limitations or the discharge of a pollutant other than from a non-point source, pursuant to Section 54.017, Texas Local Government Code. Industrial Wastewater Ordinance No. 2706 Page 35 of 40 SECTION XII - EFFECTIVE DATE This Ordinance shall be in full force and effect from and after its date of passag e and publication as provided by law. PASSED AND APPROVED this the 12th day of May, 2003. \\\ ".' .,\ C . .,., §;~~n~··r.~Y.~~';;,%'-:-~ , i \ ~ : , ~ ~. .. ~ 0: , :!""'4:::: .,...~. ATl1:hT: /Æf ~ :c~.... / g "-~~ ,." ~ "il. ~ ._~;~~ ~ Patricia Hutson, èity Secretary APPROVED AS TO FORM AND LEGALITY: APPROVED AS TO CONTENT: J7A 1e (:.J;;; Mi~ Curtis, P.E., Public Works Director Industrial Wastewater Ordinance No. 2706 Page 36 of 40 INDEX abnormal sewage............................................................................................. 1 act.................................................................................................. 1-5, 9, 12, 27 administrative adjustment............. ............................... ................... ..........25, 28 authorized representative.......................................1-3, 7,16,17,19,22-24,26 biochemical oxygen demand........................................................................ 1, 2 bypass. ... ... .. . . . . . . .. . . . . . . . ... .. . . . .., .. . . . . . .. . ... . . . . .. . .. . . . . . . . . ... . . . . . ... . . . . . . . .. . . . ... . .. 2, 7, 16, 17 categorical pretreatment standards ...................2, 3, 7, 9, 10, 15, 20-24, 30, 35 code of federal regulations .........................................................................2, 14 composite sample.......................................................................................... 3-4 concrete............ ............. ............. ............................... .......... ............. ..... ......... 11 cooling water.......................................................................................... 3, 5, 10 Director ..................................................................................1-3, 10, 17,29,34 downspouts................... ........ ....................... ............................................ ...... 10 flammable....................................................................................................... 11 flow proportional composite sample................................................................. 3 fountains......................................................................................................... 10 garbage ................................................................................................. 3,6, 11 gasoline.......................................................................................................... 11 grab sample...................................................................................... 3, 4, 12, 25 grease................................................................................................. 11, 13, 25 groundwater.................................................................................................... 10 industrial waste..................................................................... 1 ,4,6,7,9, 19,27 lawn sprays..................................................................................................... 10 maximum daily average.................................................................................... 4 maximum grab............................................................................................ 4, 13 milligram per liter.............................................................................................. 4 new source....................................................................................................... 5 NPDES ...............................................................................3,4, 6, 9, 12, 33, 36 occupant....................................................................................................... 3, 6 operation and maintenance.................................................................. 6, 19, 23 other wastes......................................................................................... 6, 12, 14 owner...............................................................3, 5, 6, 16,20-22,27,29, 30, 34 pass through............................................................................... 6, 9, 10, 14, 32 person ...................................................1, 2, 6, 9,10,11,13,16,26,29,32-35 pH................................................. 5-9,11,13,14,16-18,24-26,30,34,35,37 ponds.............................................................................................................. 10 pools... ..... .......... ............. ... .......... ..... .................................... ....................... ... 12 Public Works Utility Superintendent........................................................... 7, 19 roof runoff....................................................................................................... 10 sewage ..........................................................................1,4,6-9, 13, 18,28,29 significant industrial user ................................................................ 7, 14, 18,27 SI U ................................................................................................................... 7 slug load........................................................................................................... 7 standard methods............................................................................................. 8 storm drain...................................................................................................... 10 storm water................................................................................................. 8, 10 substantial danger ................ ............... ... .......... ... ..... .......... ..... ................. 33, 34 subsurface drainage....................................................................................... 10 Industrial Wastewater Ordinance No. 2706 Page 37 of 40 temperature ........................................................................................11, 14,25 time proportional composite sample.......... ....... ........... .......... ........ ............ .......3 total suspended solids.................................................................................. 1, 8 TPDES ......................................................................................................... 6, 8 TSS .............................................................................................................. 1, 8 upset........................................................................................................... 8, 34 Industrial Wastewater Ordinance No. 2706 Page 38 of 40