HomeMy WebLinkAboutOrdinance 2495 ORDINANCE NO. 2495 AN ORDINANCE APPROVING THE PROJECT PLAN AND REINVESTMENT ZONE FINANCING PLAN FOR REINVESTMENT ZONE NUMBER 2, NORTH RICHLAND HILLS, TEXAS, AND RESOLVING OTHER MATTERS INCIDENT AND RELATING THERETO, INCLUDING THE PREPARATION AND EXECUTION OF PARTICIPATION AGREEMENTS WITH OVERLAPPING TAXING JURISDICTIONS; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, pursuant to the provisions the of the Tax Increment Financing Act, V.T.C.A., Tax Code, Chapter 311 (the "Act"), the City of North Richland Hills, Texas (the "City") has created a reinvestment zone known as Reinvestment Zone Number 2, City of North Richland Hills, Texas (the "Reinvestment Zone") consisting of a contiguous geographic area (699 acres of land, more or less) within the City; and WHEREAS, the Board of Directors of the Reinvestment Zone has prepared and adopted a project plan and reinvestment zone financing plan (the "Plans") for the Reinvestment Zone in accordance with Section 311.011 of the Act providing expenditures to be made and monetary obligations to be incurred for public works and public improvements including (i) infrastructure improvements for water, sanitary sewer, drainage, streets and public parking, and (ii) the construction and equipping of a (a) municipal library, (b) a recreational center and (c) a conference center, and submitted such plans to the Council for approval; and WHEREAS, prior to the adoption of this ordinance, a public hearing was held on the Plans providing an opportunity for the owners of property to protest the inclusion of the property in the reinvestment zone after notice of such pubic hearing was duly published not later than the seventh day before the date of such public hearing on the 16th day of July, 2000 in "The Fort Worth Star Telegram" a newspaper of general circulation in the City, and WHEREAS, the City Council hereby finds and determines the Plans for the Reinvestment Zone are feasible and conforms to the master plan of the City and should be approved; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF NORTH RICHLAND HILLS, TEXAS: SECTION 1 Plan Approval. The project plan and reinvestment zone financing plan prepared and adopted by the Board of Directors of Reinvestment Zone Number 2, City of North Richland Hills, Texas, attached hereto as Exhibit A and incorporated by reference as a part hereof for all purposes, are hereby approved in all respects and such plans are deemed to be feasible and conform to the master plan of the City. SECTION 2: TIF Aqreements. In accordance with Section 311.013(f) of the Tax Increment Financing Act, the staff of the City are hereby authorized and directed to prepare and submit on behalf of this Council to the overlapping taxing units agreements relating to each taxing unit's participation in the Reinvestment Zone and the amount of tax increment from property located in the Reinvestment Zone to be paid into the Tax Increment Fund and the City Manager and City Secretary are hereby authorized to execute such agreements for and on behalf of the City and as the act and deed of this Council. SECTION 3: Severability. If any provision of this Ordinance or the application thereof to any circumstance shall be held to be invalid, the remainder of this Ordinance and the application thereof to other circumstances shall nevertheless be valid, and the City Council hereby declares that this Ordinance would have been enacted without such invalid provision. SECTION 4: Public Meeting. It is officially found, determined, and declared that the meeting at which this Ordinance is adopted was open to the public and public notice of the time, place, and subject matter of the public business to be considered at such meeting, including this Ordinance, was given, all as required by V.T.C.A., Government Code, Chapter 551, as amended. SECTION 5: Effective Date. This Ordinance shall be in full force and effect from and after its passage on the date shown below and it is so ordained. PASSED AND ADOPTED, this 24th day of July 2000. \\\1\\11111/1/111 ~\\\~/'" ,!\" :f¿ ~f ~"'~ . ~,'~ ~ ·-n '~ ~ I ~ --:.::& ; r r.....~ - ". . . ~~~ !~ ~ '~" his;:', 'u··· ."~ ..At'f.~ST: ....... , . .*.... " " ," (7dl;/;;i ~ Patricia Hutson, City Secretary CITY OF NORTH RICHLAND HILLS, TEXAS (-- / ¿, ~O .JL--' Lyle ~ Mayor Pro Tem APPROVED AS TO LEGALITY: (City Seal) CITY OF NORTH RICHLAND HILLS TAX INCREMENT REINVESTMENT ZONE NO. 2 PROJECT PLAN June 29, 2000 PREPARED BY THE CITY OF NORTH RICHLAND HILLS ECONOMIC DEVELOPMENT DEPARTMENT ®,~ City Secretary Office Official Record Copy Project Plan Page 2 As required by the Chapter 311, Title 3, Subtitle B of the Texas Property Tax Code, the City of North Richland Hills and First Southwest Company submit the following Project Plan for the creation of the Reinvestment Zone Number 2: BACKGROUND Dallas-based Arcadia Realty Corporation and the pension trust fund of Raytheon Systems, Inc. began discussing development of a "Town Center" development on 330 acres immediately north of the NRH2O Family Water Park in June 1997. In November 1997, the North Richland Hills City Council authorized the joint funding of two consultant studies to determine 1) the market for such a Town Center development and 2) the need for proposed public facilities to be constructed within the project. Consultants delivered the resulting analysis in June 1998, which quantified the need for a mixed-use "traditional neighborhood development" (TND)"-and likewise illustrated market demand for a new library building and recreation center. Representatives of Arcadia Realty Corporation brought renowned city planner Andres Duany to Tarrant County College for an evening presentation in early September 1998. The event allowed the City to introduce representatives of Blue Line Ice Complex, who announced their plans to locate in the Town Center as its first anchor development. Six weeks later in mid-October, Arcadia and the City co-produced a weeklong design workshop-convening a team of architects, planners, engineers and specialists led by Duany/Plater-Zyberk, Inc. The week of public and private meetings with adjacent property owners, community leaders and interested citizens culminated in the presentation of a detailed site plan fora 280-acre Town Center development-and preliminary drawings featuring buildings with a "Texas Regional" architectural look. Discussions then turned to Town Center zoning. After several weeks of consideration-and joint talks with Arcadia officials-the North Richland Hills City Council became the first known local governing body in the United States (and possibly the world) to create and adopt a Town Center zoning classification (in January 1999). At the same time, Council approved an amended Thoroughfare Plan for the development. Representatives of Carter & Burgess immediately began preparing the preliminary site plan and civil engineering documents-and likewise started negotiating with the U.S. Corps of Engineers concerning the Town Center lakes development. Preparation of the site plan included periodic meetings with the City Departments involved in North Richland Hills' Development Review Committee. Project Plan Page 3 While Carter & Burgess formally submitted the preliminary plat for review in the Summer of 1999-and it was eventually approved by the Planning & Zoning Commission on August 26-City Councilmembers continued discussions on the Library and Recreation Center at a Workshop on August 17. On August 23, Council unanimously passed Resolution 99-60 expressing intent to create Reinvestment Zone Number 2. On September 13, 1999 City Council accepted the Preliminary Project Plan and Preliminary Financing Plan. On October 25, 1999 the North Richland Hills City Council approved Ordinance No. 2420 establishing Reinvestment Zone Number 2, City of North Richland Hills. The Zone's Board of Directors adopted the Board Bylaws and approved the Preliminary Project and Financing Plan on November 1, 1999. DETAILED DESCRIPTION AND COST OF PROJECTS Throughout the Town Center discussions, Arcadia Realty Corporation representatives and North Richland Hills City officials have discussed the idea of placing a library in the eastern-most portion of the project, and a recreation center as shown on the included Master Plan. There have likewise been informal discussions among Arcadia representatives, Tarrant County College (TCC) officials and City staff regarding a Conference Center to be operated by TCC's Northeast Campus. Located at the eastern edge of Town Center (at or near where "City Hall is shown on the Town Center plan), this facility will supplement the "Civic" facility recommended by consultants during the October 1998 Design Workshop. More recently, City and Arcadia Realty Corporation officials have also considered the infrastructure improvements necessary to facilitate the Town Center's commercial development. Library The North Richland Hills Library Board has been working with a consultant for several months to identify future needs-and have laid out plans fora 60,000 SF facility costing $9,675,331. The TIRZ will reimburse the City any debt service incurred for the project. Costs include: Site acquisition $200,000 Parking 300,000 Construction of shell 4,500,000 Finish-out of 45,000 1,575,000 Furniture, Fixtures, Equipment 873,000 Fees (@ 10%) 724,800 Information Technology 450,000 Owners, Contingency, Inflation 1,497,516 Cost of Debt Issuance 95,795 Total Project Cost $10,216,111 Project Plan Page 4 Regional Recreation Center Likewise, the NRH Park Board-in association with the Park Facilities Development Corporation-has prepared plans fora 100,000 SF regional recreation center. The TIRZ will reimburse the City any debt service incurred for the project. This $21.9 million state-of--the-art facility is anticipated to include a number of essential elements: • Double Gymnasium • Fitness Center • Weight Room • Classrooms • Dance Rooms • Aerobic Rooms • Pre-school/Day Care Room • Game Room • Indoor Running and Walking Track • Banquet/Meeting Room Space • Indoor Pool (natatorium)/Leisure Pool • Rock Climbing Walls • Instruction Kitchen • Concession Area • Ceramic/Art Rooms with Kiln • Lockers and Showers • Administrative Offices Such a recreation facility is expected to cost: Land acquisition $0 Site improvements $715,673 (parking, utilities, etc.) Facility construction costs $16,000,000 Contingency, Fixtures & Furniture, Inflation $2,336,649 Soft costs (design, materials $2,640,000 testing, miscellaneous professional expenses) Cost of Debt Issuance 210 000 Total Project Cost $21,902,322 Conference Center For several years, Tarrant County College officials have been planning amulti-purpose facility designed to not only meet the needs of students in the fine arts, sciences and management-but likewise to use and make available to outside groups for short-term conferences and seminars. The Conference Center will include the following: • Auditorium • Exhibit Hall • Training Rooms • Tiered Meeting Room • Computer Demonstration Room • Planetarium • Conference Rooms • Catering Service Area • Administrative Office • Utility/Storage Areas • Parking • Marquee • Landscaping/Garden Project Plan Page 5 In addition to hosting "Fine Arts Performances and concerts, Town hall meetings and conference general sessions", TCC officials also foresee this facility serving as an "InfoMart West'=with computer hardware and software vendors renting space for display and use of their products and as a workforce development, teaching and training facility. The participation agreement calls for the college to build and operate the Conference Center. The TIRZ will reimburse the College District debt service for the project. The plan estimates the start of the project in fiscal year 2005. The reimbursement is projected over twenty years beginning in fiscal year 2006. Such a facility is expected to cost: Site improvements $1,800,000 (parking, signage, landscaping) Facility construction costs 6,333,279 Contingency, Fixtures & Furniture, Inflation Cost of Debt Issuance 80,000 Total Project Cost $8,213,279 Infrastructure The Town Center's commercial infrastructure includes water, sanitary sewer, drainage, streets and public parking improvements-as well as internal spine roads and necessary traffic signals. These facilities will be located in rights of way, easements and other locations appropriate for their use. Such improvements will be scheduled in the phases or stages: Stage 1: Stage 2: Stage 3: Stage 4: Stage 5: Stage 6: Stage 7: Stage 8: Stage 9: Contingencies, Inflation $2,612,907 (September 2000 completion) 1,999,000 (September 2000 completion) 9,018,444 (March 2002 completion) 1,131,000 (September 2002 completion) 2,151,674 (March 2004 completion) 2,801,573 (September 2004 completion) 1,399,892 (March 2006 completion) 1,399,892 (March 2006 completion) 947,187 (March 2010 completion) 1,412,536 Total Project Cost: $24,874,105 Project Plan Page 6 MAP Attached is an aerial map showing the existing conditions and uses of the 280-acre Town Center location and a site plan and artist rendering illustrating the proposed mixed-use development. PROPOSED CHANGES TO ZONING ORDINANCE, MASTER PLAN, BUILDING CODES AND/OR OTHER MUNICIPAL ORDINANCES The existing zoning (TC) will provide for all uses intended by owner/developer Arcadia Realty Corporation. The City of North Richland Hills is not proposing any additional changes to its master plan, zoning ordinance, building codes or any other municipal ordinances to help facilitate this project. LIST OF NON-PROJECT COSTS The City of North Richland Hills expects that Arcadia Realty Corporation (in partnership with Raytheon Systems, Inc.) its tenants and/or other future builders and/or investors will spend a minimum of $386 million in developing the infrastructure, building shells, constructing tenant finish out, landscaping and signing projects within the Town Center. The non-project costs are expected to include anything necessary to develop: 160,000 SF of Retail Space 600,000 SF of Class A & B and Owner-Occupied Corporate Office Space 1,400 residential housing units METHOD OF RELOCATION The City of North Richland Hills does not anticipate needing to relocate any existing property owners or tenants as a result of implementing the plan. Project Plan Page 7 EXHIBIT 1 Proposed Tax Increment Reinvestment Zone Project Plan Library at Town Center Estimated Cost of Project Plan: TIF Expenses Design & Construction of Library (Includes Cost of Issuance) Recreation Center at Town Center Estimated Cost of Project Plan: TIF Expenses: Design & Construction of Recreation Center (Includes Cost of Issuance) TCC Northeast Conference Center Estimated Cost of Project Plan: TIF Expenses: Design & Construction of Center (Includes Cost of Issuance) Town Center Infrastructure (excluding residential development) Estimated Cost of Project Plan: TIF Expenses: Design & Construction of Infrastructure GRAND TOTAL: PLAN COST $10,216,111 21, 902, 322 $ 8,213,279 $24,874,105 $65.205,817 22 Oct 9912:34:17 Friday GIS Nu: 0128 AML:city_mgr-OS28map.aml PLOT:city_mgr-0128map.rt! ~~~ ~'J 0 0 og s a b 0 b o 0 -, ~ ~, } ^~ ~ ~~ : y \ ~-~ L,I ~'~ , ~ ~~~~~~~&t~ / I! (``~` ~ III ~ ~ ~ r-II ,~~ ~ ~ ~ --~ V ~~ I ,~...~ , I--~ ~ ®IDLI~ S ~ x ~ ~ ~ Q Rr1 8 0 0 0 d d o O 7~ ~...i ~ l , R~~ !""' ~ ro~ ~ - ~ ~ ~ ,~ ~ ~~ ~+ ~ ~ \ ~ \~~ , ~^ ~ tt V ` \ ~ ~ 1 . \ 9~ \ `~ o ~H O ~ "'------zzzzzz111l11 0 ~~ M~ \ 1 L Is . 4 I,~u ~ ~ ~, u I~ '~j - - ;__~ ;;--~ i - I-- ~ f ; ; ~" r-Ili I,,-_~ ~ - - - - ~- ~ ~If----i -~ - - - - ~ . / . ~ _~ _ __ ` '~ ~ /\ y/ \ ,1 ~ I I I ~~- ~ b9 ~ ~ ~~ 6 °~r7 ~ 9 ~ D d 4 / ~ O O CSC \ 0 4 ~ ~ ~ e ~ D B ~ 4 ~ ~ ~ 4 ~ 0 ~ i W 1 (D ~ Ir I~ c~ I- ~ ~~ `---~/ o ~ ~ L-----m x ~' I I I I 1 I i ~ ~ I ~ I I I I I -, I , I I I I I I I I ~_ I j I I I I I t ~ I I 10 10 I IIO I ~ m I IIO NO ~ ~ I I IIO I INO ~ I I / 1 ~` I mrtmrrin~ I __~ M{H{HHI10 _ HIHHIHIIIO j 4HNNHIIIII ,.~. 'HNIHNIIIU NHHIIIIIIU - ww I I I I I -a N~~H CITY OF NORTH RICHLAND HILLS TAX INCREMENT REINVESTMENT ZONE NO. 2 FINANCE PLAN June 29, 2000 PREPARED BY THE CITY OF NORTH RICHLAND HILLS FINANCE DEPARTMENT City Secrefiary Office =~4 Official Record C opy CITY OF NORTH RICHLAND HILLS TAX INCREMENT REINVESTMENT ZONE NO.2 FINANCING OPTIONS FOR TAX INCREMENT SUPPORTED DEBT CITY OF NORTH RICHLAND HILLS TAX INCREMENT REINVESTMENT ZONE NO. 2 DEFINITION OF TERMS ^ The City creates the Tax Increment Reinvestment Zone (TIRZ). ^ The Base Value is the value that is on the ground when the TIRZ is Created. ^ The Captured Assessed Valuation is the real property which is added to the tax base after TIRZ is created. The Captured Assessed Valuation does not include personal property. ^ The TIRZ has no taxing powers; however, participating overlapping political subdivisions' tax revenues generated on the Captured Assessed Valuation are diverted to the Tax Increment Fund. ^ Tax increment revenues can only be used for the benefit of the property within the TIRZ, including paying for capital improvements and paying debt service on bonds issued for improvements. ^ A TIRZ has a defined period of existence which may be related to the term of debt. Once the TIRZ is abolished, the tax revenues are no longer diverted to the Tax Increment Fund. ^ The City creates the TIRZ and is the issuer of debt and is therefore responsible for the payment of the Debt. Other participating political subdivisions allow their tax revenues to be diverted to the Tax Increment Fund and have representation on the TIRZ Board. 3 CITY OF NORTH RICHLAND HILLS TAX INCREMENT REINVESTMENT ZONE NO. 2 FINANCING OPTIONS FOR TAX INCREMENT SUPPORTED DEBT Combination Tax and TIRZ Revenue Certificates of Obligation ^ Same rating as general obligation bonds; ^ Requires a pledge of tax increment revenues and ad valorem property taxes; ^ Are subject to vote if petitioned by 5% of the registered voters; ^ Most cost effective debt option; ^ Sold on a more timely basis. TIRZ Revenue Bonds ^ Supported solely by the revenues generated by the TIRZ zone; ^ Cannot generally be marketed until improvements are on the ground; ^ Generally, these are sold at a lower rating than certificates of obligation; ^ They require the use of a Reserve Fund and restrictive additional issuance covenants; ^ Higher borrowing costs. 4 CITY OF NORTH RICHLAND HILLS TAX INCREMENT REINVESTMENT ZONE NO. 2 FLOW-OF-FUNDS Interest Earnings on Construction Fund cz~ Tax Increment Revenues Tax Increment Fund Debt Service Fund Bond Holders (1) If necessary. (2) During construction period only. City of North Richland Hills Ad Valorem Property Tax Revenues~'~ 5 CITY OF NORTH RICHLAND HILLS TAX INCREMENT REINVESTMENT ZONE N0.2 FINANCE PLAN DETAIL DESCRIPTION AND COST OF PROJECTS CITY OF NORTH RICHLAND HILLS TAX INCREMENT REINVESTMENT ZONE NO. 2 DESCRIPTION AND COST OF PROJECTS BACKGROUND Dallas-based Arcadia Realty Corporation and the pension trust fund of Raytheon Systems, Inc. began discussing development of a "Town Center" development on 330 acres immediately north of the NRH2O Family Water Park in June 1997. In November 1997, the North Richland Hills City Council authorized the joint funding of two consultant studies to determine 1) the market for such a Town Center development and 2) the need for proposed public facilities to be constructed within the project. Consultants delivered the resulting analysis in June 1998, which quantified the need for a mixed-use "traditional neighborhood development" (TND)"-and likewise illustrated market demand for a new library building and recreation center. Representatives of Arcadia Realty Corporation brought renowned city planner Andres Duany to Tarrant County College for an evening presentation in early September 1998. The event allowed the City to introduce representatives of Blue Line Ice Complex, who announced their plans to locate in the Town Center as its first anchor development. Six weeks later in mid-October, Arcadia and the City co-produced a weeklong design workshop-convening a team of architects, planners, engineers and specialists led by Duany/Plater-Zyberk, Inc. The week of public and private meetings with adjacent property owners, community leaders and interested citizens culminated in the presentation of a detailed site plan fora 280-acre Town Center development-and preliminary drawings featuring buildings with a "Texas Regional" architectural look. Discussions then turned to Town Center zoning. After several weeks of consideration- and joint talks with Arcadia officials-the North Richland Hills City Council became the first known local governing body in the United States (and possibly the world) to create and adopt a Town Center zoning classification (in January 1999). At the same time, Council approved an amended Thoroughfare Plan for the development. Representatives of Carter & Burgess immediately began preparing the preliminary site plan and civil engineering documents-and likewise started negotiating with the U.S. Corps of Engineers concerning the Town Center lakes development. Preparation of the site plan included periodic meetings with the City Departments involved in North Richland Hills' Development Review Committee. 7 BACKGROUND cont. While Carter & Burgess formally submitted the preliminary plat for review in the Summer of 1999-and it was eventually approved by the Planning & Zoning Commission on August 26-City Council members continued discussions on the Library and Recreation Center at a Workshop on August 17. On August 23, Council unanimously passed Resolution 99-60 expressing intent to create Reinvestment Zone Number 2. On September 13, 1999 City Council accepted the Preliminary Project Plan and Preliminary Financing Plan. On October 25, 1999 the North Richland Hills City Council approved Ordinance No. 2420 establishing Reinvestment Zone Number 2, City of North Richland Hills. The Zone's Board of Directors adopted the Board Bylaws and approved the Preliminary Project and Financing Plan on November 1, 1999. DETAIL DESCRIPTION AND COST OF PROJECTS Throughout the Town Center discussions, Arcadia Realty Corporation representatives and North Richland Hills City officials have discussed the idea of placing a library in the eastern-most portion of the project, and a recreation center as shown on the included Master Plan. There have likewise been informal discussions among Arcadia representatives, Tarrant County College (TCC) officials and City staff regarding a Conference Center to be operated by TCC's Northeast Campus. Located at the eastern edge of Town Center (at or near where "City Hall is shown on the Town Center plan), this facility will supplement the "Civic" facility recommended by consultants during the October 1998 Design Workshop. More recently, City and Arcadia Realty Corporation officials have also considered the infrastructure improvements necessary to facilitate the Town Center's commercial development. Library The North Richland Hills Library Board has been working with a consultant for several months to identify future needs-and have laid out plans fora 60,000 SF facility costing $9,675,331. The TIRZ will reimburse the City any debt service incurred for the project. Costs include: Site acquisition $200,000 Parking 300,000 Construction of shell 4,500,000 Finish-out of 45,000 1,575,000 Furniture, Fixtures, Equipment 873,000 Fees (@ 10%) 724,800 Information Technology 450,000 Owners, Contingency, Inflation 1,497,516 Cost of Debt Issuance 95,795 Total Project Cost $10,216,111 8 DETAIL DESCRIPTION AND COST OF PROJECTS cont. Regional Recreation Center Likewise, the NRH Park Board-in association with the Park Facilities Development Corporation-has prepared plans fora 100,000 SF regional recreation center. The TIRZ will reimburse the City any debt service incurred for the project. This $21.9 million state-of--the-art facility is anticipated to include a number of essential elements: • Double Gymnasium • Fitness Center • Weight Room • Classrooms • Dance Rooms • Aerobic Rooms • Pre-school/Day Care Room • Game Room • Indoor Running and Walking Track • Banquet/Meeting Room Space • Indoor Pool (natatorium)/Leisure Pool • Rock Climbing Walls • Instruction Kitchen • Concession Area • Ceramic/Art Rooms with Kiln • Lockers and Showers • Administrative Offices Such a recreation facility is expected to cost: Land acquisition $0 Site improvements $715,673 (parking, utilities, etc.) Facility construction costs $16,000,000 Contingency, Fixtures & Furniture, Inflation $2,336,649 Soft costs $2,640,000 (design, materials testing, miscellaneous professional expenses) Cost of Debt Issuance 210 000 Total Project Cost $21,902,322 Conference Center For several years, Tarrant County College officials have been planning amulti-purpose facility designed to not only meet the needs of students in the fine arts, sciences and management-but likewise to use and make available to outside groups for short-term conferences and seminars. The Conference Center will include the following: • Auditorium • Exhibit Hall • Training Rooms • Tiered Meeting Room • Computer Demonstration Room • Planetarium • Conference Rooms • Catering Service Area • Administrative Office • Utility/Storage Areas • Parking • Marquee • Landscaping/Garden 9 DETAIL DESCRIPTION AND COST OF PROJECTS cont. In addition to hosting "Fine Arts Performances and concerts, Town hall meetings and conference general sessions", TCC officials also foresee this facility serving as an "InfoMart West"-with computer hardware and software vendors renting space for display and use of their products and as a workforce development, teaching and training facility. The participation agreement calls for the college to build and operate the Conference Center. The TIRZ will reimburse the College District debt service for the project. The plan estimates the start of the project in fiscal year 2005. The reimbursement is projected over twenty years beginning in fiscal year 2006. Such a facility is expected to cost: Site improvements $1,800,000 (parking, signage, landscaping) Facility construction costs 6,333,279 Contingency, Fixtures & Furniture, Inflation Cost of Debt Issuance 80,000 Total Project Cost $8,213,279 Infrastructure The Town Center's commercial infrastructure includes water, sanitary sewer, drainage, streets and public parking improvements-as well as internal spine roads and necessary traffic signals. These facilities will be located in rights of way, easements and other locations appropriate for their use. Such improvements will be scheduled in the phases or stages: Stage 1: $2,612,907 (September 2000 completion) Stage 2: 1,999,000 (September 2000 completion) Stage 3: 9,018,444 (March 2002 completion) Stage 4: 1,131,000 (September 2002 completion) Stage 5: 2,151,674 (March 2004 completion) Stage 6: 2,801,573 (September 2004 completion) Stage 7: 1,399,892 (March 2006 completion) Stage 8: 1,399,892 (March 2006 completion) Stage 9: 947,187 (March 2010 completion) Contingencies, Inflation 1,412,536 Total Project Cost: $24,874,105 10 Proposed Tax Increment Reinvestment Zone No. 2 Project Summary Library at Town Center Estimated Cost of Project Plan: TIF Expenses Design & Construction of Library $10,216,111 (Includes Cost of Issuance) Recreation Center at Town Center Estimated Cost of Project Plan: TIF Expenses: Design & Construction of Recreation Center 21,902,322 (Includes Cost of Issuance) TCC Northeast Conference Center Estimated Cost of Project Plan: TIF Expenses: Design & Construction of Center $ 8,213,279 (Includes Cost of Issuance) Town Center Infrastructure (excluding residential development) Estimated Cost of Project Plan: TIF Expenses: Design & Construction of Infrastructure $24.874.105 GRAND TOTAL: PLAN COST $65.205,817 11 CITY OF NORTH RICHLAND HILLS TAX INCREMENT REINVESTMENT ZONE N0.2 SOURCES OF TAX INCREMENT FUND REVENUES 12 CITY OF NORTH RICHLAND HILLS Tax Increment Reinvestment Zone No. 2 Sources of Funds Sources of Funds Certificates of Obligation Developer Contributions Other Sources Total Sources of Funds Amount $ 43,034,248 $ 22,171,569 $ - $ 65,205,817 13 CITY OF NORTH RICHLAND HILLS TAX INCREMENT REINVESTMENT ZONE N0.2 FINANCE PLAN (ECONOMIC FEASIBILITY STUDY) PROJECTED TAX INCREMENT FUND CASH FLOWS 14 CITY OF NORTH RICHLAND HILLS Tax Increme nt Reinvestment Zone No. 2 Estimated Tax Revenues Participation 100% 100% 51% 51% Total City of Total Fiscal Captured NRH TCC TC Hospital(2) Tarrant Co.(2) Property Tax Year Valuation (1) $ 0.5700 $ 0.1064 $ 0.2341 $ 0.2648 Revenues 2001 $ 12,620,987 $ 71,940 $ 13,430 $ 29,542 $ 33,425 $ 148,336 2002 $ 62,888,445 $ 358,464 $ 66,920 $ 147,203 $ 166,551 $ 739,138 2003 $ 93,808,805 $ 534,710 $ 99,822 $ 219,578 $ 248,439 $ 1,102,550 2004 $ 133,670,655 $ 761,923 $ 142,239 $ 312,883 $ 354,008 $ 1,571,053 2005 $ 179,985,905 $ 1,025,920 $ 191,523 $ 421,293 $ 476,667 $ 2,115,403 2006 $ 216,384,090 $ 1,233,389 $ 230,254 $ 506,490 $ 573,063 $ 2,543,197 2007 $ 258,666,185 $ 1,474,397 $ 275,247 $ 605,460 $ 685,041 $ 3,040,145 2008 $ 301,934,275 $ 1,721,025 $ 321,288 $ 706,738 $ 799,631 $ 3,548,682 2009 $ 343,951,625 $ 1,960,524 $ 365,999 $ 805,088 $ 910,908 $ 4,042,518 2010 $ 371,342,145 $ 2,116,650 $ 395,145 $ 869,201 $ 983,448 $ 4,364,444 2011 $ 386,293,400 $ 2,201,872 $ 411,055 $ 904,197 $ 1,023,044 $ 4,540,168 2012 $ 390,156,334 $ 2,223,891 $ 415,165 $ 913,239 $ 1,033,274 $ 4,585,570 2013 $ 394,057,897 $ 2,246,130 $ 419,317 $ 922,371 $ 1,043,607 $ 4,631,426 2014 $ 397,998,476 $ 2,268,591 $ 423,510 $ 931,595 $ 1,054,043 $ 4,677,740 2015 $ 401,978,461 $ 2,291,277 $ 427,745 $ 940,911 $ 1,064,584 $ 4,724,517 2016 $ 405,998,246 $ 2,314,190 $ 432,023 $ - $ - $ 2,746,213 ._017 $ 410,058,228 $ 2,337,332 $ 436,343 $ - $ - $ 2,773,675 2018 $ 414,158,810 $ 2,360,705 $ 440,706 $ - $ - $ 2,801,412 2019 $ 418,300,399 $ 2,384,312 $ 445,113 $ - $ - $ 2,829,426 2020 $ 422,483,403 $ 2,408,155 $ 449,565 $ - $ - $ 2,857,720 2021 $ 426,708,237 $ 2,432,237 $ 454,060 $ - $ - $ 2,886,297 2022 $ 430,975,319 $ 2,456,559 $ 458,601 $ - $ - $ 2,915,160 2023 $ 435,285,072 $ 2,481,125 $ 463,187 $ - $ - $ 2,944,312 2024 $ 439,637,923 $ 2,505,936 $ 467,819 $ - $ - $ 2,973,755 2025 $ 444,034,302 $ 2,530,996 $ 472,497 $ - $ - $ 3,003,492 2026 $ 448,474,645 $ 2,556,305 $ 477,222 $ - $ - $ 3,033,527 2027 $ 452,959,392 $ 2,581,869 $ 481,994 $ - $ - $ 3,063,863 Totals $ 51,840,426 $ 9,677,789 $ 9,235,788 $ 10,449,734 $ 81,203,738 (1) Source ZimmermanNolk Associates and The Crossing for Years 2002 through 2011. 2001 reflects preliminary increment values from TAD as of May 15, 2000. Assumes 1% growth 2012 through 2027. The base value of real property within the Zone as of January 1, 1999 , wa s $40,363.058 as appraised by Tarrant Appraisal Dis trict. P roject Description Estimated Cost Pct of Total Infrastructure Improvements $ 24,874,105 38% Conference Center $ 8,213,279 13% Library $ 10,216,111 16% Recreation CenterlNatatorium $ 21,902,322 33% Total Project Costs $ 65,205,817 100% (2) Tarrant County and the Hospital District will participate to the extent of infrastructure Improvements and the construction of the Conference Center. These two projects constitute approximately 51 % of the project plan. The plan calls for these entities parBcipaGon to be 100% of ad valorem taxes generated until their proportion of these project costs is collected. It is anticipated that it will take approximately fifteen years. 15 CITY OF NORTH RICHLAND HILLS Tax Increment Reinvestment Zone No. 2 Tax Increment Fund -Estimated Coverage Calculations Estimated Estimated Pledged Interest Estimated Estimated Estimated Property Developer! Earnings on Total Projects Cert. Interest Surplus Cumulative Fiscal Tax NRH Construc. Estimated Debt Projects Cover. Ea rnings on Certificate Surplus Year Revenues(!) Contribution(2) Funds(3) Revenues Service (4) Cash(4) Ratio Surplus(3) Coverage Coverage 2000 $ 4,658,026 $ 4,658,026 $ 1,000,000 4.66 $ 3,658,026 $ 3,658,026 2001 $ 148,336 $ 500,000 $ 125,384 $ 773,721 $ 528,338 $ 3,605,000 0.19 $ 164,611 $ (3,195,007) $ 463,019 2002 $ 739,138 $ 10,865,995 $ 189,524 $ 11,794,657 $ 1,292,932 $ 8,480,000 1.21 $ 20,836 $ 2,042,561 $ 2,505,580 2003 $ 1,102,550 $ 600,000 $ 34,976 $ 1,737,526 $ 2,337,982 $ 900,000 0.54 $ 112,751 $ (1,387,706) $ 1,117,875 2004 $ 1,571,053 $ 5,603,113 $ 373 $ 7,174,539 $ 2,337,982 $ 3,550,000 1.22 $ 50,304 $ 1,336,861 $ 2,454,735 2005 $ 2,115,403 $ - $ 136,555 $ 2,251,958 $ 2,826,487 $ - 0.80 $ 110,463 $ (464,066) $ 1,990,670 2006 $ 2,543,197 $ 2,799,784 $ 202,366 $ 5,545,347 $ 3,751,922 $ 2,799,784 0.85 $ 89,580 $ (916,779) $ 1,073,891 2007 $ 3,040,145 $ 2,198 $ 3,042,343 $ 3,751,922 $ 200,000 0.77 $ 48,325 $ (861,254) $ 212,637 2008 $ 3,548,682 $ - $ 3,548,682 $ 3,751,922 $ - 0.95 $ 9,569 $ (193,671) $ 18,965 2009 $ 4,042,518 $ - $ - $ 4,042,518 $ 3,751,922 $ 275,000 1.00 $ 853 $ 16,450 $ 35,415 2010 $ 4,364,444 $ 947,187 $ - $ 5,311,631 $ 3,751,922 $ 1,361,785 1.04 $ 1,594 $ 199,517 $ 234,932 2011 $ 4,540,168 $ - $ - $ 4,540,168 $ 3,751,922 1.21 $ 10,572 $ 798,818 $ 1,033,750 2012 $ 4,585,570 $ - $ - $ 4,585,570 $ 3,751,922 1.22 $ 46,519 $ 880,167 $ 1,913,917 2013 $ 4,631,426 $ - $ - $ 4,631,426 S 3,751,922 1.23 $ 86,126 $ 965,630 $ 2,879,547 2014 $ 4,677,740 $ - $ - $ 4,677,740 $ 3,751,922 1.25 $ 129,580 $ 1,055,397 $ 3,934,944 2015 $ 4,724,517 $ - $ - $ 4,724,517 $ 3,751,922 1.26 $ 177,072 $ 1,149,668 $ 5,084,612 '~16 $ 2,746,213 $ - $ - $ 2,746,213 $ 3,751,922 0.73 $ 228,808 $ (776,902) $ 4,307,710 .17 $ 2,773,675 $ - $ - $ 2,773,675 $ 3,751,922 0.74 $ 193,847 $ (784,400) $ 3,523,310 2018 $ 2,801,412 $ - $ - $ 2,801,412 $ 3,751,922 0.75 $ 158,549 $ (791,961) $ 2,731,349 2019 $ 2,829,426 $ - $ - $ 2,829,426 $ 3,751,922 0.75 $ 122,911 $ (799,586) $ 1,931,763 2020 $ 2,857,720 $ - $ - $ 2,857,720 $ 3,751,922 0.76 $ 86,929 $ (807,273) $ 1,124,491 2021 $ 2,886,297 $ - $ 2,886,297 $ 3,223,584 0.90 $ 50,602 $ (286,684) $ 837,806 2022 $ 2,915,160 $ - $ 2,915,160 $ 2,458,990 1.19 $ 37,701 $ 493,871 $ 1,331,678 2023 $ 2,944,312 $ - $ 2,944,312 $ 1,413,940 2.08 $ 59,925 $ 1,590,298 $ 2,921,975 2024 $ 2,973,755 $ - $ 2,973,755 $ 1,413,940 2.10 $ 131,489 $ 1,691,304 $ 4,613,279 2025 $ 3,003,492 $ - $ 3,003,492 $ 925,435 3.25 $ 207,598 $ 2,285,655 $ 6,898,935 2026 $ 3,033,527 $ - $ 3,033,527 $ - NA $ 310,452 $ 3,343,979 $ 10,242,914 2027 $ 3,063,863 $ - $ 3,063,863 $ - NA $ 460,931 $ 3,524,794 $ 13,767,708 Totals $81,203,738 $ 25,974,105 $ 691,376 $107,869,219 575,038,439 $22,171,569 $ 3,108,498 $ 13,767,708 (1) Source ZimmermanNolk Associates and The Crossing for Years 2001 through 2011. Assumes 1% growth 2012 through 2027. The base value for real property in the Zone was $40,363,058 on January 1, 1999, as appraised by Tarrant Appraisal District. (2) The City of North Richland Hilts anticipates making a contribution from Parks Development sales tax of $500,000 in FY 2001 and $600,000 in FY2003. Developer contributions are based on anticipated completion of eligible infrastructure improvements. (3) Assumed 18 months straight-line construction of facilities. Interest earned on all cash balances assumed at 4.5%. (4) See Project Funding Worksheet page 17. 16 ~ N ~ ~ ~O O N M ~' ~ IA 49 ~ ' C1 W V m ~ O w1 m V ~ ~ ~ ~O N ~ M ~ a m ~ p ~ ~ ~ 7 ~ O ~ Cs ~ y y O m r V ~ ~ V M r C M ~ `" ~ y O R fA ~ ~ ~' t, m G b y r+ ~ d ~ U J cV ~ u9 v- J O +, .c _ = Z ~ ~ ~ ~ ~ ~ _ d Q C S ~ ~ a m ~ Z N Y ~ L ~ ~ _ N Q ~--~ L p ~ m V C .•0 ~ e ~ ~ V ... a a, t0 ~ ~ rr G Q1 ti ~ m V m .}~ c0 t;. ~ V ~ r 6i ~ d ~ V . O ~-+ ~ (~ ~ !f) d 3 H Z ~ ~ Q. H LL .O ~ rn o N d ~ C L 00 ~Yl ' ' ~'=' m u3i F' R3 O U V (,~ ~ w c en '~ c ~ v o ° ~ C o o w O d ~ ~:. O ~ V ~ m Q tll N ~ U ~ y d4 fA Ml C Q. V N m N ~ e e G1 0 ..--~ Q ~ ; m ~ O O - a , N r a o ~ bR d ~ ~ N ( ~ U .-.• O V t0 ~ •L C ... y C7 " ~ ~ N ~ a ~ ~ O O N O O O fh O O `a ° 0 0 00 o c o ~ o o _ ° ° ° ° o o_ ~ c o_ rn v o ~ c o fD ~ OD M .- r- 00 _ tly C7 a9 u9 u9 v~ vi of u~ u9 v- w r O .-- O O ~ ~ M ~ ~ 0 O O 0 0 G9 Efl ~ ° o O 'ct r ~ FA (I) 00 O ti ~ 00 M ~ ~ coo CO O r' Vi ~ o ~ t0 et V! o N Ifl t0 y O ~ (D ~ ~ ~ (O t+f M co c 0 ~- EA y N N f0 ~ cO ~ co ~t r ~ (Q O O .- d9 E,A `y r r ri of H ° 0 0 0 0 a~ N t0 R ~ O N H N N v N 0 0 ° o O ° 0 (OD O °- O O -~ CO r- d9 F,9 N t/1 L LJ y U y O y ~ U y ~ ?+ N j~ U1 N Q~ D y U (.) ~ L .y.. ~ ffl C W y •U U~ `'' 0 ~ ~ U U mO U~ ~ ~ L v V U t0 ~ U C U U ~ y f0 "' ~ y ~ •- F.U.. U ~ t O N N a C U ~ U O V 0 C fA r U ~ ~ 7 otS {~A ~ U y •O C7 m m O O a~ 0 mU O p j i 9 U ~ d1A O ~ y ~` ~ d ~ O ~ p w C 7 ~ m ~ t0 j Q' J ~ ~ 7 C V C Q V y ~ U ~ ~ ~ C O ~ ~ C U O N t~/1 O) 01 'C ~ ~ N U 2 N y U ~ ~ J 2 y 2 C ~ O •C 1l9 ~ O ° U ~ N y (~ ~ •N Vf C ~ U ~ U ~ Q H ~ O) U ~ .~, U L ~ y O S O O U C ~ C d' ~! Z LL. C m F- eA CO Z F- S U O O r r N N M M ~ tt O t[1 O O O O O O O O O O O O O O O O O 0 0 0 0 0 O O O r N N N N N N N N N N N N N O 0 N