HomeMy WebLinkAboutOrdinance 3678 ORDINANCE NO. 3678
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF NORTH
RICHLAND HILLS, TEXAS, AMENDING THE ADOPTED BUDGET FOR
THE FISCAL YEAR OCTOBER 1, 2020 THROUGH SEPTEMBER 30,
2021, IN ACCORDANCE WITH THE CHARTER OF THE CITY OF
NORTH RICHLAND HILLS, TEXAS; PROVIDING FOR THE FILING OF
THE AMENDED BUDGET; PROVIDING A SEVERABILITY CLAUSE
AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City of North Richland Hills is a home rule city acting under its charter
adopted by the electorate pursuant to Article XI, Section 5 of the Texas
Constitution and Chapter 9 of the Local Government Code; and
WHEREAS, in accordance with Article XII of the City of North Richland Hills City
Charter the City Manager shall authorize no expenditure over the total
funds for expenditure in the overall budget unless the budget is amended
by the same public notice procedure called for in adopting the budget; and
WHEREAS, in accordance with Article XII of the City of North Richland Hills City
Charter, a notice of public hearing was placed in the Star Telegram on
December 30, 2020, at least ten (10) days prior to the public hearing; and
WHEREAS, the City Manager of the City of North Richland Hills submitted an
amended budget for the fiscal year beginning October 1, 2020, and ending
September 30, 2021 to the City Council as required by the City Charter of
the City of North Richland Hills; and
WHEREAS, after full and final consideration, the City Council is of the opinion that the
budget should be approved and amended;
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL, CITY OF NORTH
RICHLAND HILLS, TEXAS, THAT:
SECTION 1. The amended budget for the City of North Richland Hills, Texas, for the
Fiscal Year beginning October 1, 2020 and ending September 30, 2021,
as set forth in Attachments A and B, is hereby amended and approved
as filed herewith. A copy of the amended budget shall be filed with the City
Secretary.
SECTION 2. This ordinance shall be cumulative of all provisions of ordinances and of
the Code of Ordinances, City of North Richland Hills, Texas, as amended,
except where the provisions are in direct conflict with the provisions of
other ordinances, in which event the conflicting provisions of the other
ordinances are hereby repealed.
Ordinance No. 3678
Page 1 of 3
SECTION 3. It is hereby declared to be the intention of the City Council that the
phrases, clauses, sentences, paragraphs and sections of this ordinance
are severable, and if any phrase, clause, sentence, paragraph or section
of this ordinance shall be declared unconstitutional by the valid judgment
or decree of any court of competent jurisdiction, such unconstitutionality
shall not affect any of the remaining phrases, clauses, sentences,
• paragraphs and sections of this ordinance, since the same would have
been enacted by the City Council without the incorporation in this
ordinance of any such unconstitutional phrase, clause, sentence,
paragraph or section.
SECTION 4. This ordinance shall be in full force and effect from and after its passage
as provided by law, and it is so ordained.
AND IT IS SO ORDAINED.
PASSED AND APPROVED on this 11th day of January, 2021.
CITY OF RT746PLA HILLS
By:
Oscar r ino ayor
ATTEST: •• • '
toLt 11.4.Z
r c
Alicia Richardson=(:).''•• , ••. ��°
City Secretary/Chief s ►9,6 Officer
immillimmioAPPROVED AS TO F M AND LEGALITY:
Maleshia B. McGinnis, City Attorney
Ordinance No. 3678
Page 2 of 3
APPROVED AS TO CONTENT:
Robe Myers, Budget & Research Director
Ordinance No. 3678
Page 3 of 3
ATTACHMENT A
Summary of Project Expenditures
2020/21 Amended Capital Improvement Program
By Category
Amended 1.11.21 Amended
Category 2020/21 Amendment 2020/21
Street & Sidewalk $14,235,550 $16,125,000 $30,360,550
Drainage 450,000 - 450,000
Utility 2,639,906 - 2,639,906
Parks & Recreation 664,000 - 664,000
Aquatic Park 125,000 - 125,000
Facilities 274,400 - 274,400
Major Capital Equipment 643,400 - 643,400
Economic Development - - -
CIP Personnel 353,105 - 353,105
Other 517,511 - 517,511
Total CIP Project Expenditures $19,902,872 $16,125,000 $36,027,872
Ordinance No.3678
Attachment A
Page 1 of 1
ATTACHMENT B
Street& Sidewalk Capital Projects
Department Project Title Project Number
Public Works Bedford Euless Road Reconstruction IST2111
Project Description
The project consists of engineering and construction of approximately 2,800 linear feet of Bedford Euless Road from Booth
Calloway Road to just east of Strummer Drive. The improvements include reconstructing the existing roadway with reinforced
concrete, including the addition of pedestrian facilities. The road will be reconstructed within the existing right-of-way based on the
Transportation Plan recommendation that the section be reduced to a three-lane configuration;this is not a roadway expansion.
Project Justification
Bedford Euless Road is a minor arterial in the City's roadway network,and this portion of the roadway carries approximately 12,000
vehicles per day. The current pavement condition rating is 8.9 on a scale of 1-100,and has deteriorated to the point that full
reconstruction is warranted. In the 2019 Citizen's Survey, Bedford Euless Road was one of often cited in response to the question
of which streets are in most need of repair.
Project Schedule Beginning Date Ending Date Budget History
Professional Services
Engineering/Design 12/14/2020 12/31/2021
Land/ROW Acquisition
Construction 1/1/2021 5/1/2023
Other
Total Project I I I I I I Total Project Costs
Uuri:6s of Funds T4 pate 2020-21! 202122 2022 to Total Amidunt�;
AMendment Estimated completion'
General Obligation Bonds 3,415,000 3,415,000
Certificate of Obligation
Federal/State Grants
Reserves
Sales Tax
Other
Total Funding $ $ 3,415,000 $ $ $ 3,415,000
Total Project Costs
Professional Services -
Engineering/Design 341,500 341,500
Land/ROW Acquisition -
Construction 3,073,500 3,073,500
Other
Total Costs $ $ 3,415,000 $ $ $ 31415,000
Impact on Operating Budget
Estimated Annual 2020-2021 10212022 20222023' 2023-2024 5-Year Total '!
O esratin "1nr act
Ordinance No.3678
Attachment B
Page 1 of 12
ATTACHMENT B
Street& Sidewalk Capital Projects
Department Project Title Project Number
Public Works Glenview Drive West Project IST2110
Project Description
The project consists of engineering and construction of approximately 3,100 linear feet of Glenview Drive from Honey Lane to the
city limit line just east of Big Fossil Creek. The improvements include reconstructing the existing roadway with reinforced concrete,
including the addition of sidewalks. The road will be rebuilt to its current width;this is not a roadway expansion.
Project Justification
Glenview Drive is a minor arterial in the City's roadway network,and this portion of the roadway carries over 18,000 vehicles per
day. The current pavement condition rating is 31.3 on a scale of 1-100,and has deteriorated to the point that full reconstruction is
warranted. In the 2019 Citizen's Survey, Glenview Drive was street that received the highest number of mentions in response to the
question of which streets are in most need of repair.
Project Schedule Beginning Date Ending Date Budget History
Professional Services
Engineering/Design 12/14/2020 12/31/2021
Land/ROW Acquisition
Construction 1/1/2021 5/1/2023
Other
Total Project I I I I I I Total Project Costs
Uuri:6s of Funds T4 pate 2020-21! 202122 2022 to Total Amidunt�;
AMendment Estimated completion'
General Obligation Bonds 4,515,000 4,515,000
Certificate of Obligation -
Federal/State Grants
Reserves
Sales Tax
Other -
Total Funding $ $ 4,515,000 $ $ $ 4,515,000
Total Project Costs
Professional Services -
Engineering/Design 451,500 451,500
Land/ROW Acquisition
Construction 4,063,500 4,063,500
Other -
Total Costs $ $ 4,515,000 $ $ $ 4,515,000
Impact on Operating Budget
Estimate#Annual 2020-2021 10212022 20222023' 2023-2024 5-Year Total '!
O esratin "1nr act
Ordinance No.3678
Attachment B
Page 2 of 12
ATTACHMENT B
Street& Sidewalk Capital Projects
Department Project Title Project Number
Public Works Nor'East Drive Reconstruction IST2112
Project Description
The project consists of the design and reconstruction of approximately 2,500 linear feet of Nor'East Drive from the dead end to
Davis Boulevard. The improvements include reconstructing the existing roadway with new full-depth subgrade, limited curb and
gutter replacement,and asphalt pavement. The road will be reconstructed within the existing right-of-way in its current
configuration;this is not a roadway expansion.
Project Justification
A 2020 Capital Program Advisory Committee evalutated the city's infrastructure needs and due to poor road conditions,
recommended that Nor'East Drive be reconstructed. The committee considered several factors when recommending street
projects including existing pavement conditions,traffic volumes, maintenance records,and estimated project costs. Nor'East Drive
is a local or residential street in the City's roadway network,and this portion of the roadway carries approximately 1,300 vehicles per
day. The current pavement condition rating is 15.7 on a scale of 1-100,and has deteriorated to the point that full reconstruction is
warranted.
Project Schedule Beginning Date Ending Date Budget History
Professional Services
Engineering/Design 12/14/2020 3/1/2021
Land/ROW Acquisition
Construction 3/1/2021 10/1/2021
Other
Total Project I I Total Project Costs
Uuri:6s of Funds T4 pate 2020-21! 202122 2022 to Total Amidunt�;
AMendment Estimated completion'
General Obligation Bonds 1,530,000 1,530,000
Certificate of Obligation -
Federal/State Grants
Reserves
Sales Tax
Other
Total Funding $ $ 1,530,000 $ $ $ 1,530,000
Total Project Costs
Professional Services -
Engineering/Design 15,000 15,000
Land/ROW Acquisition -
Construction 1,515,000 1,515,000
Other -
Total Costs $ $ 1,530,000 $ $ $ 1,530,000
Impact on Operating Budget
Estimate#Annual 2020-2021 10212022 20222023' 2023-2024 5-Year Total '!
O esratin "1nr act
Ordinance No.3678
Attachment B
Page 3 of 12
ATTACHMENT B
Street& Sidewalk Capital Projects
Department Project Title Project Number
Public Works North Hills Drive Reconstruction IST2113
Project Description
The project consists of the design and reconstruction of approximately 3,600 linear feet of North Hills Drive from the City Llmit to
Wendell Drive. The improvements include reconstructing the existing roadway with new full-depth subgrade, limited curb and gutter
replacement,and new asphalt pavement. The road will be reconstructed within the existing right-of-way in its current configuration;
this is not a roadway expansion.
Project Justification
A 2020 Capital Program Advisory Committee evalutated the city's infrastructure needs and due to poor road conditions,
recommended that North Hills Drive be reconstructed. The committee considered several factors when recommending street
projects including existing pavement conditions,traffic volumes, maintenance records,and estimated project costs. North Hills
Drive is a local or residential street in the City's roadway network. The current pavement condition rating is 11.3 on a scale of 1-
100,and has deteriorated to the point that full reconstruction is warranted.
Project Schedule Beginning Date Ending Date Budget History
Professional Services
Engineering/Design 12/14/2020 3/1/2021
Land/ROW Acquisition
Construction 3/1/2021 10/1/2021
Other
Total Project Total Project Costs
Sr6urceta of Funds To Date 2020-21 2021-22 2022 to Total Afnaunt
Arnendmee t Estimated Completion
General Obligation Bonds 2,120,000 2,120,000
Certificate of Obligation -
Federal/State Grants
Reserves
Sales Tax
Other
Total Funding $ $ 2,120,000 $ $ $ 2,120,000
Total Project Costs
Professional Services -
En ineerin /Desi n 1 15,000 15,000
Land/ROW Acquisition -
Construction 2,105,000 2,105,000
Other
Total Costs $ $ 2,120,000 $ $ $ 2,120,000
Impact on Operating Budget
lEstlmate'cl Annual 1 1 2020-2021 1 1 2021 2022 1 1 2022-2023 '1 2023-2024, 5-Year�Ti6tal
loperatjng lm act
Ordinance No.3678
Attachment B
Page 4 of 12
ATTACHMENT B
Street& Sidewalk Capital Projects
Department Project Title Project Number
Public Works Meadow Oak Drive Reconstruction IST2114
Project Description
The project consists of the design and reconstruction of approximately 900 linear feet of Meadow Oaks Drive from Dick Lewis to
Buenos Aires. The improvements include reconstructing the existing roadway with new full-depth subgrade, limited curb and gutter
replacement,and new asphalt pavement. The road will be reconstructed within the existing right-of-way in its current configuration;
this is not a roadway expansion.
Project Justification
A 2020 Capital Program Advisory Committee evalutated the city's infrastructure needs and due to poor road conditions,
recommended that Meadow Oak Drive be reconstructed. The committee considered several factors when recommending street
projects including existing pavement conditions,traffic volumes, maintenance records,and estimated project costs. Meadow Oak
Drive is a local or residential street in the City's roadway network. The current pavement condition rating is 13.6 on a scale of 1-
100,and has deteriorated to the point that full reconstruction is warranted.
Project Schedule Beginning Date Ending Date Budget History
Professional Services
Engineering/Design 10/1/2021 2/1/2022
Land/ROW Acquisition
Construction 3/1/2022 9/30/2022
Other
Total Project I I Total Project Costs
Uuri:6s of Funds T4 pate 2020-21! 202122 2022 to Total Amidunt�;
AMendment Estimated completion'
General Obligation Bonds 570,000 570,000
Certificate of Obligation -
Federal/State Grants
Reserves
Sales Tax
Other
Total Funding $ $ 570,000 $ $ $ 570,000
Total Project Costs
Professional Services -
Engineering/Design 15,000 15,000
Land/ROW Acquisition -
Construction 555,000 555,000
Other
Total Costs $ $ 570,000 $ $ $ 570,000
Impact on Operating Budget
Estimate#Annual 2020-2021 10212022 20222023' 2023-2024 5-Year Total '!
O esratin "1nr act
Ordinance No.3678
Attachment B
Page 5 of 12
ATTACHMENT B
Street& Sidewalk Capital Projects
Department Project Title Project Number
Public Works Pearl Street Reconstruction IST2115
Project Description
The project consists of the design and reconstruction of approximately 1,100 linear feet of Pearl Street from Freda Lane to the alley
in Hometown. The improvements include reconstructing the existing roadway with new full-depth subgrade, limited curb and gutter
replacement,and new asphalt pavement. The road will be reconstructed within the existing right-of-way in its current configuration;
this is not a roadway expansion.
Project Justification
A 2020 Capital Program Advisory Committee evalutated the city's infrastructure needs and due to poor road conditions,
recommended that Pearl Street be reconstructed. The committee considered several factors when recommending street projects
including existing pavement conditions,traffic volumes, maintenance records,and estimated project costs. Pearl Street is a local or
residential street in the City's roadway network. The current pavement condition rating is 14.5 on a scale of 1-100,and has
deteriorated to the point that full reconstruction is warranted.
Project Schedule Beginning Date Ending Date Budget History
Professional Services
Engineering/Design 10/1/2021 2/1/2022
Land/ROW Acquisition
Construction 3/1/2022 9/30/2022
Other
Total Project I I Total Project Costs
Uuri:6s of Funds T4 pate 2020-21! 202122 2022 to Total Amidunt�;
AMendment Estimated completion'
General Obligation Bonds 690,000 690,000
Certificate of Obligation -
Federal/State Grants
Reserves
Sales Tax
Other
Total Funding $ $ 690,000 $ $ $ 690,000
Total Project Costs
Professional Services -
Engineering/Design 15,000 15,000
Land/ROW Acquisition -
Construction 675,000 675,000
Other
Total Costs $ $ 690,000 $ $ $ 690,000
Impact on Operating Budget
Estimated Annual 2020-2021 10212022 20222023' 2023-2024 5-Year Total '!
O esratin "1nr act
Ordinance No.3678
Attachment B
Page 6 of 12
ATTACHMENT B
Street& Sidewalk Capital Projects
Department Project Title Project Number
Public Works iSouthampton Drive Reconstruction IST2116
Project Description
The project consists of the design and reconstruction of approximately 1,700 linear feet of Southampton Drive from Wakefield Road
to Chapman Road. The improvements include reconstructing the existing roadway with new full-depth subgrade, limited curb and
gutter replacement,and new asphalt pavement. The road will be reconstructed within the existing right-of-way in its current
configuration;this is not a roadway expansion.
Project Justification
A 2020 Capital Program Advisory Committee evalutated the city's infrastructure needs and due to poor road conditions,
recommended that Southampton Drive be reconstructed. The committee considered several factors when recommending street
projects including existing pavement conditions,traffic volumes, maintenance records,and estimated project costs. Southampton
Drive is a local or residential street in the City's roadway network. The current pavement condition rating is 9.4 on a scale of 1-100,
and has deteriorated to the point that full reconstruction is warranted.
Project Schedule Beginning Date Ending Date Budget History
Professional Services
Engineering/Design 10/1/2021 2/1/2022
Land/ROW Acquisition
Construction 3/1/2022 9/30/2022
Other
Total Project I I Total Project Costs
Uuri:6s of Funds T4 pate 2020-21! 202122 2022 to Total Amidunt�;
AMendment Estimated completion'
General Obligation Bonds 1,080,000 1,080,000
Certificate of Obligation -
Federal/State Grants
Reserves
Sales Tax
Other
Total Funding $ $ 1,080,000 $ $ $ 1,080,000
Total Project Costs
Professional Services -
Engineering/Design 15,000 15,000
Land/ROW Acquisition -
Construction 1,065,000 1,065,000
Other
Total Costs $ $ 1,080,000 $ $ $ 1,080,000
Impact on Operating Budget
Estimated Annual 2020-2021 10212022 20222023' 2023-2024 5-Year Total '!
O esratin "1nr act
Ordinance No.3678
Attachment B
Page 7 of 12
ATTACHMENT B
Street& Sidewalk Capital Projects
Department Project Title Project Number
Public Works Diamond Loch West Courts Reconstruction IST2118
Project Description
The project consists of the design and reconstruction of approximately 200 linear feet of two Diamond Loch West courts from
located off of the main Diamond Loch West roadway. The improvements include reconstructing the existing roadway with new full-
depth subgrade, limited curb and gutter replacement,and new asphalt pavement. The road will be reconstructed within the existing
right-of-way in its current configuration;this is not a roadway expansion.
Project Justification
A 2020 Capital Program Advisory Committee evalutated the city's infrastructure needs and due to poor road conditions,
recommended that two Diamond Loch West courts be reconstructed. The committee considered several factors when
recommending street projects including existing pavement conditions,traffic volumes, maintenance records,and estimated project
costs. Diamond Loch West is a local or residential street in the City's roadway network. The current pavement condition rating is
approximately 10 on a scale of 1-100,and has deteriorated to the point that full reconstruction is warranted.
Project Schedule Beginning Date Ending Date Budget History
Professional Services
Engineering/Design 10/1/2021 2/1/2022
Land/ROW Acquisition
Construction 3/1/2022 9/30/2022
Other
Total Project I I Total Project Costs
Uuri:6s of Funds T4 pate 2020-21! 202122 2022 to Total Amidunt�;
AMendment Estimated completion'
General Obligation Bonds 130,000 130,000
Certificate of Obligation -
Federal/State Grants
Reserves
Sales Tax
Other
Total Funding $ $ 130,000 $ $ $ 130,000
Total Project Costs
Professional Services -
Engineering/Design 15,000 15,000
Land/ROW Acquisition -
Construction 115,000 115,000
Other -
Total Costs $ $ 130,000 $ $ $ 130,000
Impact on Operating Budget
Estimate#Annual 2020-2021 10212022 20222023' 2023-2024 5-Year Total '!
O esratin "1nr act
Ordinance No.3678
Attachment B
Page 8 of 12
ATTACHMENT B
Street& Sidewalk Capital Projects
Department Project Title Project Number
Public Works iStonybrooke Drive Reconstruction IST2119
Project Description
The project consists of the design and reconstruction of approximately 1,240 linear feet of Stonybrooke Drive from Stephanie Drive
to approximately 340'north of Hightower.The improvements include reconstructing the existing roadway with new full-depth
subgrade, limited curb and gutter replacement,and new asphalt pavement. The road will be reconstructed within the existing right-
of-way in its current configuration;this is not a roadway expansion.
Project Justification
A 2020 Capital Program Advisory Committee evalutated the city's infrastructure needs and due to poor road conditions,
recommended that Stonybrooke Drive be reconstructed. The committee considered several factors when recommending street
projects including existing pavement conditions,traffic volumes, maintenance records,and estimated project costs. Stonybrooke
Drive is a local or residential street in the City's roadway network. The current pavement condition rating is 24 on a scale of 1-100,
and has deteriorated to the point that full reconstruction is warranted.
Project Schedule Beginning Date Ending Date Budget History
Professional Services
Engineering/Design 10/1/2022 2/1/2023
Land/ROW Acquisition
Construction 3/1/2023 9/30/2023
Other
Total Project I I Total Project Costs
Uuri:6s of Funds T4 pate 2020-21! 202122 2022 to Total Amidunt�;
AMendment Estimated completion'
General Obligation Bonds 870,000 870,000
Certificate of Obligation -
Federal/State Grants
Reserves
Sales Tax
Other
Total Funding $ $ 870,000 $ $ $ 870,000
Total Project Costs
Professional Services -
Engineering/Design 15,000 15,000
Land/ROW Acquisition -
Construction 855,000 855,000
Other -
Total Costs $ $ 870,000 $ $ $ 870,000
Impact on Operating Budget
Estimate#Annual 2020-2021 10212022 20222023' 2023-2024 5-Year Total '!
O esratin "1nr act
Ordinance No.3678
Attachment B
Page 9 of 12
ATTACHMENT B
Street& Sidewalk Capital Projects
Department Project Title Project Number
Public Works Nob Hill Drive Reconstruction IST2120
Project Description
The project consists of the design and reconstruction of approximately 1,365 linear feet of Nob Hill Drive from just west of High
Oaks Drive to the dead end. The improvements include reconstructing the existing roadway with new full-depth subgrade, limited
curb and gutter replacement,and new asphalt pavement. The road will be reconstructed within the existing right-of-way in its
current configuration;this is not a roadway expansion.
Project Justification
A 2020 Capital Program Advisory Committee evalutated the city's infrastructure needs and due to poor road conditions,
recommended that Nob Hill Drive be reconstructed. The committee considered several factors when recommending street projects
including existing pavement conditions,traffic volumes, maintenance records,and estimated project costs. Nob Hill Drive is a local
or residential street in the City's roadway network. The current pavement condition rating is 9.8 on a scale of 1-100,and has
deteriorated to the point that full reconstruction is warranted.
Project Schedule Beginning Date Ending Date Budget History
Professional Services
Engineering/Design 10/1/2022 2/1/2023
Land/ROW Acquisition
Construction 3/1/2023 9/30/2023
Other
Total Project I I Total Project Costs
Uuri:6s of Funds T4 pate 2020-21! 202122 2022 to Total Amidunt�;
AMendment Estimated completion'
General Obligation Bonds 820,000 820,000
Certificate of Obligation
Federal/State Grants
Reserves
Sales Tax
Other
Total Funding $ $ 820,000 $ $ $ 820,000
Total Project Costs
Professional Services -
Engineering/Design 15,000 15,000
Land/ROW Acquisition -
Construction 805,000 805,000
Other
Total Costs $ $ 820,000 $ $ $ 820,000
Impact on Operating Budget
Estimated Annual 2020-2021 10212022 20222023' 2023-2024 5-Year Total '!
O esratin "1nr act
Ordinance No.3678
Attachment B
Page 10 of 12
Street & Sidewalk Capital Projects
Iron Horse East Boulevard Reconstruction
ST2101
PROJECT DESCRIPTION&JUSTIFICATION
Reconstruct a 1.2 mile stretch of Iron Horse Boulevard from York Street to Browning Drive. The project replaces the current
asphalt with concrete roadway, in addition to curb, gutter,sidewalks, raised medians and drainage. Current road coniditon is
poor and is critical road used by Prestige Ameritech, ESNA Aerospace and Tyson Prepared Foods. A 2020 Capital Program
Advisory Committee evaluated the city's infrastructure needs and due to poor road conditions, recommended that Iron Horse
Boulevard be reconstructed. The Committee considered several factors when recommending street projects including existing
pavement conditions, traffic volumes, maintenance records, input from citizens surveys and estimated costs.
Funding: Funding for this project is proposed from Certificates of Obligation and from the Economic Development
Administration.
PROJECT STATUS ORIGINAL 2020121 ORIGINAL 2020121
START DATE REVISION END DATE REVISION
Professional Services 12/2020 10/2022
Engineering 12/2020 03/2021 06/2021 03/2022
Land/ROW Acquisition
Construction 09/2021 05/2022 09/2022 08/2023
Other 12/2020 10/2022
REVISION EXPLANATION
The original Iron Horse project included both the sections both East and West of Rufe Snow Drive. The larger project has now
been split into two separate projects,with the Iron Horse (East)project receiving grant funding. The remaining Iron Horse
(West)project from Browning to Rufe Snow will be managed separately with bond funding only.
FINANCIAL DATA
ADOPTED REVISED TOTAL
BUDGET THRU PROJECT BUDGET THRU REMAINING PROJECT
2020/21 REVISION 2020/21 BALANCE COST
FUNDING SOURCES
Certificates of Obligation $1,825,000 ($770,000), $1,055,000 $1,055,000
Federal Grant 7,295,000 (3,075,000) 4,220,000 $4,220,000
0 $0
0 $0
0 $0
Total $9 120 000 $3 845 000 $5 275 000 $0 $5 275 000
PROJECT EXPENDITURES
Professional Services $136,800 ($136,800) $0 $0
Engineering/Design 793,440 (126,840) 666,600 $666,600
Land/ROW Acquistion 0 0 0 $0
Construction 7,122,720 (2,514,320) 4,608,400 $4,608,400
Other 1,067,040 (1,067,040) 0 $0
Total $9,120,000 1 ($3,845,000)1 $5,275,000 1 $0 $5,275,000
IMPACT ON OPERATING BUDGET
ANNUAL OPERATING IMPACT 1 2020/21 1 2021/22 2022/23 1 2023/24 1 2024/25 1 TOTAL
Projected $0
Ordinance No.3678
Attachment B
Page 11 of 12
ATTACHMENT B
Street& Sidewalk Capital Projects
Department Project Title Project Number
Public Works Iron Horse Boulevard West Reconstruction IST2117
Project Description
The project consists of the design and reconstruction of approximately 2,000 linear feet of Iron Horse Boulevard from Browning
Drive to Rufe Snow Drive. The improvements include reconstructing the existing roadway with reinforced concrete, including the
addition of pedestrian facilities. The road will be reconstructed within the existing 80'right-of-way in its current four-lane divided
configuration;this is not a roadway expansion.
Project Justification
A 2020 Capital Program Advisory Committee evalutated the city's infrastructure needs and due to poor road conditions,
recommended that Iron Horse Boulevard be reconstructed. The committee considered several factors when recommending street
projects including existing pavement conditions,traffic volumes, maintenance records,citizen input and estimated project costs.
Iron Horse Blvd. is a minor arterial in the City's roadway network,and this portion of the roadway carries approximately 5,200
vehicles per day. The current pavement condition rating is 16.7 on a scale of 1-100,and has deteriorated to the point that full
reconstruction is warranted.
Project Schedule Beginning Date Ending Date Budget History
Professional Services
Engineering/Design 10/1/2021 10/1/2022
Land/ROW Acquisition
Construction 10/1/2022 1/1/2024
Other
Total Project I I I I I I Total Project Costs
Uuri:6s of Funds T4 pate 2020-21! 202122 2022 to Total Amidunt�;
AMendment Estimated completion'
General Obligation Bonds 3,460,000 3,460,000
Certificate of Obligation 770,000 770,000
Federal/State Grants -
Reserves
Sales Tax
Other
Total Funding $ $ 4,230,000 $ $ $ 4,230,000
Total Project Costs
Professional Services -
Engineering/Design 609,300 609,300
Land/ROW Acquisition -
Construction 3,620,700 3,620,700
Other -
Total Costs $ $ 4,230,000 $ $ $ 4,230,000
Impact on Operating Budget
Estimate#Annual 2020-2021. 211212022 20222023' 2023-2024 5-Year Total '!