HomeMy WebLinkAboutResolution 1999-096
RESOLUTION NO. 99-96
Be it resolved by the City Council of the City of North Richland Hills, Texas, that:
1.
The Mayor is hereby authorized to execute the attached interlocal agreement
with the City of Watauga concerning cost participation in street and drainage
improvements on Rufe Snow Drive from Fair Meadows Drive to High Lawn Terrace
on behalf of the City of North Richland Hills, Texas.
Passed and approved this the 13th day of December, 1999.
'11 il'liP.'"
, ;,\ \\\\,!~ ,~-~~,v v /1"
~,'\" ......1Þ'/~
:).~ IIT\ ···~0'::~-
¡~ ! .' \- ~:~
(.;~TTE'T. }l~~
~ ',-, f\..,. 5, I
_ ·:D·:.¡.n ,'{'~"; /~
;;/' . . '. .' . I /Il ( ¡f ::.
;/l/,',):(:../( ~ / '- L.j L,·Y'J-
Pátricia Hutson, City Secretary
( " /.. ¡. ,J i .....
........ i/'.·/...L......./ .i )'.{_'f-~-7'L.~
j
Charles Scoma, Mayor
APPROV. ;.~AS TO FORM.~ND LEGA~~._._-
/1 ) (; A-----
(I '. '¿'/f:Y; .~---/A::_c'/·' ØÎL...
I.A"L/ ./
I ,/,. ./.
Rex McEntire: Attorney for the City
APPROVED AS TO CONTENT:
"", ~./ C· "
7 I " , ,. ¡
. XI.; ........, " /. /,'
>,~._..J··l.{:",/:)- tð. V'~__ ) C<.._¡!;í:/A:;~/
/ Grego, W. Dic ens, Public Works Director
INTERLOCAL AGREEMENT
STATE OF TEXAS §
COUNTY OF TARRANT §
THIS AGREEMENT is made and entered into by and between the City of North Richland
Hills, Texas (hereinafter called "NRH") and the City of Watauga, Texas (hereinafter called
"Watauga") both municipal corporations of the State of Texas, witnesseth:
WHEREAS, NRH proposes to reconstruct Rufe Snow Drive from Fair Meadows to High
Lawn Terrace to the same width that exists today; and
WHEREAS, approximately one-half of the pavement to be reconstructed is within the city
limits of Watauga; and
WHEREAS, both NRH and Watauga want to improve this section ofRufe Snow Drive; and
. WHEREAS, NRH has acquired a grant for this project under the Urban Street Program.
NOW THEREFORE, for and in consideration of the mutual covenants, conditions, and
promises expressed herein, the parties agree as follows:
1. NRH will enter into agreement with the State of Texas through the Texas Department
of Transportation (TxDOT) under the Urban Street Program for reconstruction of this section of
Rufe Snow Drive with concrete pavement at its existing width.
2. NRH will have its consulting engineer, Knowlton-English-Flowers, Inc. (KEF),
prepare final plans and specifications for the proposed improvements in accordance with TxDOT
requirements.
3. NRH and Watauga will share evenly the final, as-built costs for the project which is
not reimbursed from the State except as modified below. Each party will pay one-half ('12) of such
costs. This will include paving, curb and gutter, and drainage improvements costs, as well as
surveying, engineering and TxDOT administration costs. See Attachment #1 for preliminary cost
estimate. The total cost to Watauga shall not exceed $820,384 without approval by City Council of
the City of Watauga. NRH shall provide all related financial and cost documents to Watauga upon
request.
4. All utility adjustment costs and right-of-way (ROW) acquisition costs will be paid
by the respective City. Any ROW acquisition costs on the west side of Rufe Snow Drive will be
paid for by Watauga and NRH will pay for any ROW acquisition costs on the east side. NRH
assumes all responsibilities in connection with its 16 inch water line on the east side ofRufe Snow
Drive.
5. NRH and Watauga will each be responsible for one-half (Yz) ofthe "contingency" or
"miscellaneous allowance" amount. If this allowance is not used, one-half (~) the amount remaining
will be credited back to each City's account for the project. The Watauga Director of Public Works
shall have authority to approve expenditure offunds from contingency or miscellaneous allowance.
Watauga shall not participate in any contingency or miscellaneous cost expenditure without
authorization in writing by the Watauga Director of Public Works.
6. NRH will provide Watauga' s Director of Public Works three days written notice of
any meeting with KEF or TxDOT concerning this project so Watauga can attend and be represented.
All plans and appropriate ROW documents will be reviewed and approved by Watauga's Director
of Public Works prior to final approval by NRH.
7. NRH will finance Watauga's share of the total cost for this project over a period of
up to twenty (20) years at an annual interest rate of four and one half percent (4.5%) with no
prepayment penalties.
8. TxDOT will advertise, take bids, award, and inspect this project.
9. Watauga's first annual payment to be made to NRH within sixty (60) days of
receiving a statement from NRH. Statement to be sent or delivered after NRH City Council
approves final payment to the contractor for this project.
10. This Agreement shall become effective on the latest date of execution following and
shall bind the parties, their successors and assigns.
-t-~ ~
WITNESS OUR HANDS this the I:) day of Iod ,1999.
CITY OF NORTH RICHLAND HILLS, TEXAS:
r¡¿j!
~ .
By:
Charles Scoma,
R
2
ATTEST:
Ma I. Daniel
City Attorney for City ofWatauga
CITY OF WATAUGA, TEXAS:
By:
Y:
3
ATTACHMENT #1
KNOWL TON-ENGLlSH-FLOWERS, INC.
PRELIMINARY OPINION OF COST
JOB NO: 03-393 OWNER: City of North Richland Hills
DATE: October 14. 1999
PROJECT DESCRIPTION:
Rufe Snow Drive Reconstruction -- Willow View to Fair Meadow Drive - TxDOT Urban Street Project
Length of Project = 3,700 L.F.
ENGLISH
UNITS
TxDOT C:- II
DESCRIPTION OF UNIT ITEM ENGL. TOTAL UNIT
NO. UNIT QUANTITY PRICE
Preparina Riaht of Way 100 STA. 37.00 1.930.00 71,410
Removinq Concrete - Pavinq 104 SY 500 300 1,500
Removina Concrete - Medians 104 SY 10 6.00 60
Removinq Concrete - Sidewalks 104 SY 3,200 1200 38,400
Removinq Concrete - Driveways 104 SY 520 11.00 5.720
Removinq Concrete - Ret. Walls 104 SY 100 6.00 600
Removina Concrete - Curb and Gutter 104 L.F. 9,200 7.40 68,080
Excavation - Roadway 110 CY 10,200 5AOM
Embankment - Density Control 132 CY 1.020 4.65
Furnishinq and Placinq Topsoil. 4-lnch Thick 160 SY 10.200 1.00
Seedina for Erosion Control (Bermuda) 164 SY 10,200 0.50 . 5,1'
Fertilizer (16-8-8) 166 TON 0.50 395.0019
Vegetative Watering 168 MGAL 135 18.50 2,49
Soil Retention Blanket 169 SY 10,200 1.60 16,320
Lime Treatment for Materials Used as Subqrade. 8-lnch Thick 260 SY 27,500 2.10 57,750
Lime Used for Lime Treatment 260 TON 550.00 98.00 53,900
Salv., Haulino, and Stkpl. ReI. Asoh. Pavement, 6-lnch Thick 305 SY 26,750 2.20 58,850
Prime Coat (Cutback Asphaltic Material) 310 GAL 13.200 1.95 25,740
Hot Mix Asphaltic Underlavment. Tvpe "B" 4-lnch Thick 340 TON 6.138 35.00 214.830
Continually Reinforced Concrete Pavement, 8-lnch thick 360 SY 26,500 32.00 848,000
Retainina Walls 423 SF 1,000 30.00 30.000
Railinq 450 L.F 200 55.00 11,000
DRAINAGE L.S. 1 100,000.00 100,000
Removina Old Structures 496 Each 10 1.500.00 15.000
Mobilization 500 L.S. 1 100.000.00 100,000
Barricades. Sians. and Traffic Handlinq 502 Month 14 2,890.00 40,460
Portable Concrete Traffic Barrier (Move and Reset) 512 L.F. 3,700 4.30 15,910
Mono Curb. 6-lnch 360 L.F. 9.200 3.00 27,600
Concrete Driveways and Turnouts 6-lnch Thick 530 SY 520 35.00 18.200
Concrete Sidewalks 531 SY 4,100 27.00 110.700
Wheelchair Ramps 531 Each 50 760.00 38,000
Concrete Medians and Directional Islands 536 SY 100 36.00 3,600
ROADWAY ILLUMINATION LS. 1 87,000.00 87,000
Aluminum Siqns 636 SF 150 11.00 1,650
Replacinq Small Roadside Sians 648 Each 50 96.00 4,800
Removinq Small Roadside Siqn Assemblies 649 Each 50 7200 3,600
Work Zone Pavement Markinas. solid 4-lnch wide 662 L.F. 5,100 055 2,805
Reflectorized Pavement Markinqs, solid 8-lnch wide 666 L.F. 3,000 0.49 1,470
Reflectorized Pavement Markinas, solid 4-lnch wide 666 L.F. 1.000 0.21 210
Raised Pavement Markers 672 Each 480 3.00 2ii:
Eliminatinq Existina Pavement Markinqs and Markers (4-lnch) 677 L.F 2.000 0.62
Pavement Surface Preparation for Markinas 678 L.F. 1,000 0.50
TRAFFIC SIGNALIZATION Each 1 25,000.00 25,000
Storm Water Pollution Prevention Proaram L.S. 1 53.000.00 53,000
Miscellaneous Allowance - 20% L.S. 1 446,432.60 446,433
REVIEWED & APPROVED: SUB-TOTAL CONSTRUCTION 2.678.596
TxDOT Administration Fees (9.5% Est.) 254,467
RIGHT-OF-WAY (Corner Clips) 50,000
UTILITY RELOCATIONS (Mise) 200.000
Sf G. R. Philipp Jr. ENGINEERING (Approx. 12%) + 350,000
G.R Philipp Jr.. P.E.
TOTAL PROJECTED COST $3.533.062
+
FILE: J:\NRII\J93\Tahh:s\Rufe SnO\v - 13.:\1s
. TxDOT Items =
$2,240,367 80% Share
Balance =
Est. NRH Share =
Est Watauaa Share =
$1 ,792.294
$1,740.768
$920.384
$820.384
Note: DiHclCIKC În City's shares is in Utility Relol:atiolls. The $200,000 l'St. cost is
split $1 SO,ÜOO t()f NRII and $50,000 for Watauga.