RESOLUTION NO. 99-43
that:
BE IT RESOLVED by the City Council of the City of North Richland Hills, Texas,
1.
The City Manager be, and is hereby authorized to execute the attached
Agreement for Engineering Services with Knowlton, English & Flowers, Inc. to conduct a
planning study on the Big Fossil Creek Wastewater Outfall System serving North
Richland Hills, Richland Hills, Fort Worth, and Haltom City, as an act and deed of the
City.
PASSED AND APPROVED this the 12th day of July, 1999.
~#t~:
Rex McEntire, Attorney for the City
APPROVED AS TO CONTENT:
;l¡
/"
4 C:>CRW5
. c:>~IN1'ON CR~~K
rJ
s
..~... -.....
........................-.........
WATAUGA
SAGINAW
................
i B LLÌE
l~_~~.jO
NORTH
RICHLANO
HILLS
.'.
7tv O'{
~
-':".
.'
":".
FORT
WORTH
,". ....".".".".". ....". ·.·.".".".-0". ~ '.
.. .
............-......
.-....
...
...---...........
EXISTING TCISC BIG FOSSIL OUTFALL
EXISTING COF. BIG FOSSIL
DRAINAGE BASIN SANITARY SEIERS
CITY LIMIT LINES
DRAINIGE BISIN DIVISION LINES
. ,
-.
"
RESOLUTION NO. 99-43
ATTACHMENT
·
KNOWLTON-ENGLlSH-F LOWERS, INC.
c( )'i<;UI TI'iC E.'\c;l'-'EERS ! Fort Worth-Dall,\S
AUTHORIZATION FOR
PROFESSIONAL ENGINEERING SERVICES
PROJECT NO.: 3-436
PROJECT NAME: North Richland Hills Big Fossil Relief Sewer Planning
CLIENT:
The City of North Richland Hills, Texas
ADDRESS:
City of North Richland Hills
7301 N.E. Loop 820
North Richland Hills, TX 76180
Hereby requests and authorizes Knowlton-English-Flowers, Inc., Consulting Engineers
to perform the following services:
SCOPE:
See Attached Scope of Work
COMPENSATION: Compensation to Knowlton-English-Flowers, Inc., shall be on
a Lump Sum basis in the Total Amount of Fifty Nine
Thousand Nine Hundred Fifty Dollars and no/100, ($59,950.00)
Approved for
The City of North Richland Hills
Accepted for
Knowlton-English-Flowers, Inc.
By:
By:
~.~
Richard W. Albin, P.E.
Title:
Title:
Vice President
Date:
Date:
July 5, 1999
1901 CENTRAL DR., SUITE 550· BEDFORD, TEXAS 76021-5826· 817/283-6211 · METRO 817/267-3367. FAX 817/354-4389
RESOLUTION NO. 99-43
ATTACHMENT
NORTH RICHLAND HILLS BIG FOSSIL RELIEF SEWER PLANNING
SCOPE OF WORK
The City of North Richland Hills, in cooperation with the cities of Richland Hills, Haltom
City and Fort Worth for the Big Fossil Relief Sewer Planning Study proposes the
following Scope of Work:
Task 1: Obtain and review available existing sanitary sewer design data
(drawings and specifications) for COFW Big Fossil Sewer and TCWSC
Big Fossil Sewer.
Task 2: Conduct preliminary easement ownership research. Provide services
of a right-of-way consultant.
Task 3: Prepare parcel map for the lower section of the COFW Big Fossil
Sewer and the TCWSC Big Fossil Sewer. Provide surveying services.
Task 4: Determine if any additional right-of-way is required for the TCWSC Big
Fossil Sewer.
Task 5: Determine capacity requirements in gallons per minute for the
proposed relief sanitary sewer utilizing data from the Fort Worth Wet
Weather Program and available Sanitary Sewer Evaluation Studies
that were recently completed by the cities of North Richland Hills,
Haltom City and Richland Hills. Determine required sanitary sewer
sizes (diameter).
Task 6: Identify three cost effective alternative routes for the proposed relief
sewer.
Task 7: Determine easement requirement for each alternative route for the
proposed relief sanitary sewer.
Task 8: Develop evaluation matrix to select the optimum route for the proposed
relief sanitary sewer. The matrix will include the following criteria:
· capital cost
· additional easement required
· impact on participating communities
· design considerations (creek and road crossings, topography)
· construction impacts
· sanitary sewer maintenance requirements
Page 1
RESOLUTION NO. 99-43
ATTACHMENT
Task 9: Prepare study report document Tasks 1 through 8. Report will
recommend proposed relief sanitary sewer sizes and route(s). Provide
services of a technical editor.
Task 10: Conduct two project workshops for quality control, discussion of project
issues, and consensus on proposed relief sanitary sewer. Conduct
monthly progress meetings with the applicants.
Task 11: Provide word processing support.
Task 12: Manage the progress of the project, including schedule, budget and
coordination with the Texas Water Development Board.