Loading...
HomeMy WebLinkAboutResolution 1999-043 RESOLUTION NO. 99-43 that: BE IT RESOLVED by the City Council of the City of North Richland Hills, Texas, 1. The City Manager be, and is hereby authorized to execute the attached Agreement for Engineering Services with Knowlton, English & Flowers, Inc. to conduct a planning study on the Big Fossil Creek Wastewater Outfall System serving North Richland Hills, Richland Hills, Fort Worth, and Haltom City, as an act and deed of the City. PASSED AND APPROVED this the 12th day of July, 1999. ~#t~: Rex McEntire, Attorney for the City APPROVED AS TO CONTENT: ;l¡ /" 4 C:>CRW5 . c:>~IN1'ON CR~~K rJ s ..~... -..... ........................-......... WATAUGA SAGINAW ................ i B LLÌE l~_~~.jO NORTH RICHLANO HILLS .'. 7tv O'{ ~ -':". .' ":". FORT WORTH ,". ....".".".".". ....". ·.·.".".".-0". ~ '. .. . ............-...... .-.... ... ...---........... EXISTING TCISC BIG FOSSIL OUTFALL EXISTING COF. BIG FOSSIL DRAINAGE BASIN SANITARY SEIERS CITY LIMIT LINES DRAINIGE BISIN DIVISION LINES . , -. " RESOLUTION NO. 99-43 ATTACHMENT · KNOWLTON-ENGLlSH-F LOWERS, INC. c( )'i<;UI TI'iC E.'\c;l'-'EERS ! Fort Worth-Dall,\S AUTHORIZATION FOR PROFESSIONAL ENGINEERING SERVICES PROJECT NO.: 3-436 PROJECT NAME: North Richland Hills Big Fossil Relief Sewer Planning CLIENT: The City of North Richland Hills, Texas ADDRESS: City of North Richland Hills 7301 N.E. Loop 820 North Richland Hills, TX 76180 Hereby requests and authorizes Knowlton-English-Flowers, Inc., Consulting Engineers to perform the following services: SCOPE: See Attached Scope of Work COMPENSATION: Compensation to Knowlton-English-Flowers, Inc., shall be on a Lump Sum basis in the Total Amount of Fifty Nine Thousand Nine Hundred Fifty Dollars and no/100, ($59,950.00) Approved for The City of North Richland Hills Accepted for Knowlton-English-Flowers, Inc. By: By: ~.~ Richard W. Albin, P.E. Title: Title: Vice President Date: Date: July 5, 1999 1901 CENTRAL DR., SUITE 550· BEDFORD, TEXAS 76021-5826· 817/283-6211 · METRO 817/267-3367. FAX 817/354-4389 RESOLUTION NO. 99-43 ATTACHMENT NORTH RICHLAND HILLS BIG FOSSIL RELIEF SEWER PLANNING SCOPE OF WORK The City of North Richland Hills, in cooperation with the cities of Richland Hills, Haltom City and Fort Worth for the Big Fossil Relief Sewer Planning Study proposes the following Scope of Work: Task 1: Obtain and review available existing sanitary sewer design data (drawings and specifications) for COFW Big Fossil Sewer and TCWSC Big Fossil Sewer. Task 2: Conduct preliminary easement ownership research. Provide services of a right-of-way consultant. Task 3: Prepare parcel map for the lower section of the COFW Big Fossil Sewer and the TCWSC Big Fossil Sewer. Provide surveying services. Task 4: Determine if any additional right-of-way is required for the TCWSC Big Fossil Sewer. Task 5: Determine capacity requirements in gallons per minute for the proposed relief sanitary sewer utilizing data from the Fort Worth Wet Weather Program and available Sanitary Sewer Evaluation Studies that were recently completed by the cities of North Richland Hills, Haltom City and Richland Hills. Determine required sanitary sewer sizes (diameter). Task 6: Identify three cost effective alternative routes for the proposed relief sewer. Task 7: Determine easement requirement for each alternative route for the proposed relief sanitary sewer. Task 8: Develop evaluation matrix to select the optimum route for the proposed relief sanitary sewer. The matrix will include the following criteria: · capital cost · additional easement required · impact on participating communities · design considerations (creek and road crossings, topography) · construction impacts · sanitary sewer maintenance requirements Page 1 RESOLUTION NO. 99-43 ATTACHMENT Task 9: Prepare study report document Tasks 1 through 8. Report will recommend proposed relief sanitary sewer sizes and route(s). Provide services of a technical editor. Task 10: Conduct two project workshops for quality control, discussion of project issues, and consensus on proposed relief sanitary sewer. Conduct monthly progress meetings with the applicants. Task 11: Provide word processing support. Task 12: Manage the progress of the project, including schedule, budget and coordination with the Texas Water Development Board. Page 2 RESOLUTION NO. 99-43 ATTACHMENT