RESOLUTION NO. 89-25
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF NORTH RICHLAND HILLS, TEXAS, that:
The Mayor be, and is hereby, authorized to execute
the attached agreement with the City of Haltom City, Texas as
the act and deed of this City.
PASSED AND APPROVED this 10th day of April
APPROVED :
MaYO~7~
,1989.
ATTEST:
~ ,4V':-
y Secretary
APPROVED AS TO FORM AND LEGALITY:
~
Attorney for the City
RESOLUTION NO. 10-72
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF HALTOM CITY, 'TEXAS, that:
The Mayor be, and is hereby, authorized to execute
the attached agreement with the City of North Richland Hills,
Texas as the act and deed of the City.
PASSED AND APPROVED :this lò r¡., day of t~- , 1989.
APPROVED:
1 In f
ATTEST: V~ O-:¡~
~C[cUdo¿~L~
City Secretary
APPROVED AS TO FORM AND LEGALITY:
;J ~ c9ß.w.-
Attorney for the City
'.
".'
STATE OF TEXAS X
CDUNl'Y OF TARRANT X
INTERI.œAL AGREEMEm'
WHEREAS, the City of North Richland Hills, Texas has a need to
construct and maintain a water transmission line from the City of Fort
Worth to the City of North Richland Hills which transmission line will
run under certain public streets in the City of Hal tan City.
NOW, THEREFORE, in consideration of the mutual covenants made
herein the City of North Richland Hills, Texas and the City of Hal tan
City, Texas agree as follows:
1. The City of Haltom City will allow the City of North
Richland Hills to install water transmission lines as
follows :
a. An 18" line in Stanley-Keller Road along a pipeline
easement purchased by North Richland Hills from
wne Star Gas Company fran Lot 56, Block 12, West
Browning Heights Addition to a point near Haltom
Road where the City of North Richland Hills has an
existing 18" line in Stanley-Keller Road between
Hal tan Road and Denton Highway. It is the
intention of the parties that the actual physical
location of the water line will be along a line
mutually agreed upon by the Public Works Directors
of each city.
b. A water transmission main approxinately 16" in
diameter in the right-of-way of Cedarcrest Street
from Denton Highway to the Diam::md Oaks Country
Club to match up with a North Richland Hills water
main crossing fran west to east across the golf
course.
~-.. :
c. A water transmission main approximately 10" in
diameter in the right-of-way of State Highway 377
from Cedarcrest south to North Hills Addition along
a line mutually agreed upon by the Directors of
Public works of each city.
d. Across and under any other streets or public
rights-of-way necessary to connect the North
Richland Hills water system to the City of
Fort Worth at its Beach Street connection.
COpy
". .
e. No street in Hal tari. City may be closed for the
water main construction unless prior
consent of their Director of Public WOrks is
acquired.
f. The Director of Public Works for Hal torn City may
require the water wain installations across
Diamond Oaks South Drive be installed by boring in
order to maintain continuous traffic flow.
g. All street rights-of-way disturbed by the water main
installation will be restored to an equal or better
condition than what existed prior to construction.
2. The City of Haltom City expects to permanently improve
that portion of Stanley-Keller Road under which the 18"
line (la above) will be installed. As to this line, the
City of North Richland Hills will install the water main
with appropriate embedment, backfill and 12" of crushed
stone flexible base material. The City of Hal tan Ci'ty will
accept responsibility for construction of the remainder of
the street above the water line. The City of North Richland
Hills will pay to the City of Hal tan City for pavement
repair the sum of $5.50 per square yard times the length
of the 18" water main tiIæs the width of the trench.
Once the water line is constructed and the permanent
improvements are canpleted by the City of Hal tan City,
the City of North Richland Hills will accanplish any
subsequent patching or repair of the street occasioned
by the water main breaking or leaking. All such repairs
will be accanplished in accordance with the then current
Haltan City pavement repair criteria. All testing costs
associated with these repairs will be paid for by the City
of North Richland Hills. All costs incurred by Hal tan Ci ty-"
in making repairs to the street or any facility in the
street due to a North Richland Hills water main break or
leak will be reimbursed to the City of Hal tom City by the
City of North Richland Hills.
3. In connection with the other water mains contemplated by
this contract, the City of North Richland Hills will repair
the streets which are disturbed by the installation of the
mains in accordance with the then current Hal torn City
pavement repair criteria and will be responsible for all
maintenance of street surfaces directly over its mains for
a period of two years from date of installation. After
such two year period, the City of North Richland Hills
"Will repair the streets where damage is occasioned by
breaking or leaking of the North Richland ijills water
mains. The provisions as outlined in Section 2, paragraph
2 above are to be the same for all of the water mains
covered by this agreement.
4. The City of North Richland Hills will be responsible for
providing both cities with all necessary drawings and plats
showing the final location of the water mains along the
actual route agreed upon by the Public Works Directors of
each city.
This agreement is binding and in full force until such tiIœ the
City of North Richland Hills ceases to use said water lines for
transmission of potable water.
WITNESS OUR HANDS this 10th day of A¡>ril
, 1989.
BY.
Mayor
ATI'EST:
ç¡¡,LLMùÍ£
C' Secretary
~~
CITY OF HAI.1IŒ CITY, TEXAS
BY',f;.MJ ð. .J~~l
¿g:~c0¿}~